==== PAGE 1 ====
Department of Environment, Food and Agriculture
Application for Consent to Remove Material from a Riverbed
Under Section 18 of the Fisheries Act 2012, consent must be obtained from DEFA prior to
includes gravels, cobbles, boulders and soft sediment such as silt but does not include
vegetation removed for the purpose of routine drainage management.
Details of Applicant
Details of Landowner (if different from above)
Proposed Extraction Site
What type of material do you wish to remove? (circle all that apply)
Boulders
Cobbles/pebbles
Gravel
Sand/Silt/Clay
Why do you wish to remove the material?
How do you propose to remove the material? (if using machinery, please include
whether this would need to enter the river channel)
Please give details of when you wish to remove the material and how long it will
take (during October to June (inc) consent is unlikely to be granted for extraction of
material from rivers with a mostly stony substrate due to the sensitivity of fish eggs and fry
to such disturbance)
Signature:
Date
Please return this completed form to: Inland Fisheries Development Manager, Fisheries
Directorate, Thie Slieau Whallian, Foxdale Road, St Johns, IM4 3AS
or by email to [email protected]
For telephone enquiries call: 685857
Aaron Carey
07624-376395
[email protected]
DOI / GOV
Sea Terminal
Matt Ripley
mathew.ripley@gov,im
07624-263941
River Neb
54.214499, -4.699544
24/01/2025
All works will be carried out using an 14t excavator, no machinery will enter the water course.
out from river bank. (RAMS will be issued to DEFA & FRM before constructrion works commences on site)
Ballasalla Farm, Jurby West, im7 3AS
500mm of material will be removed from the river bank to lift a pre cast concrete head unit into postion, all works will be carried