Department of Environment, Food and Agriculture Rheynn Chymmyltaght, Bee as Eirinys
Application for Consent to Remove Material from a Riverbed
Under Section 18 of the Fisheries Act 2012, consent must be obtained from DEFA prior to removing material from the bed of any river. River in this instance is defined as ‘any natural or artificial channel through which water flows and includes a tributary or stream’. Material includes gravels, cobbles, boulders and soft sediment such as silt but does not include vegetation removed for the purpose of routine drainage management. Details of Applicant Name: ... Address: ... ... Tel. no: ... Email: ...
Details of Landowner (if different from above)
Name: ... Address: ... ... Tel. no: ... Email: ...
Proposed Extraction Site
Name of Watercourse (if known): ... Ordnance Survey Grid Reference (e.g. SC 295 845): ...
What type of material do you wish to remove? (circle all that apply)
Boulders
Cobbles/pebbles
Gravel
Sand/Silt/Clay
Why do you wish to remove the material? ... ...
How do you propose to remove the material? (if using machinery, please include whether this would need to enter the river channel) ... ...
Please give details of when you wish to remove the material and how long it will take (during October to June (inc) consent is unlikely to be granted for extraction of material from rivers with a mostly stony substrate due to the sensitivity of fish eggs and fry to such disturbance)
Applicant’s Signature: ... Date...
Please return this completed form to: Inland Fisheries Development Manager, Fisheries Directorate, Thie Slieau Whallian, Foxdale Road, St Johns, IM4 3AS or by email to [email protected] For telephone enquiries call: 685857 Aaron Carey Ballasalla Farm, Jurby West, im7 3AS 07624 376395 [email protected] DOI / GOV Sea Terminal 07624-263941 mathew.ripley@gov,im Peel, Mill Race PCS will be excavating 900mm below the Mill race bed and installing 200m ducts in 2 locations, the area of works will be backfilled with as dug material and reinstated back to existing. (RAMS will be issued to DEFA & FRM before constructrion works commences on site) All works will be carried out using an 14t excavator, no machinery will enter the water course. 24/01/2025 54.217337, -4.700629 / 54.214603, -4.699442