Loading document...
==== PAGE 1 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Mr John Allan Callow 17 Doves Croft Douglas IM2 7EJ TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Barmerlea Limited, Ref 25/90090/B, for the Erection of two-storey extension and terraces to northern elevation of existing dwelling (revision to planning application 23/00772/B) at 15 Peel Road Douglas Isle Of Man IM1 4LP . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals. 2. Prior to their application, a schedule of materials and finishes to be used in the construction of the external surfaces, including roofs, have been submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details. Reason: In the interests of the character and appearance of the site and surrounding area. This decision relates to the following plans and drawings, date stamped received on 24 January 2025 and 3 April 2025: Location plan Dr No. 4625/L1 Site Plan Existing Dr No. 4625/EX1 Tree Protection Plan Dr No 4625/tree1 Existing and Proposed Roof Plans Dr No.4625/RP1 Drawing as Proposed DrNo 4625/P1 E This decision has been made for the following reasons(s)
==== PAGE 2 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 The proposed development is acceptable in terms of its form, mass and will not cause any significant detriment to the character and appearance of the locality or the amenities of surrounding residential properties, whilst providing a good standard of amenity for future occupants. The proposals are therefore deemed to comply with General Policy 2 and Environment Policies 36 and 42 of the Isle of Man Strategic Plan (2016). The application is therefore recommended for approval. Date of Issue: 29th July 2025 J CHANCE Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by a Principal Planner in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which informed the assessment and decision is available to view on the Government’s website (via https://pbc.gov.im/online- applications/) Implementation A determination to grant planning approval does not have effect - · if an appeal is submitted until the appeal is determined or withdrawn; or · if no appeal is submitted, but there are potential appellants in addition to the applicant, until the time within which an appeal may be submitted has expired (21 days from the date of this notice). Development must be carried out in accordance with the approved plans and any attached conditions (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal can only be made by a person who has been accorded rights to do so, must be in writing, include the appropriate fee and be submitted to the Department within 21 days of the date of this Notice. Guidance on how to appeal is available at gov.im/howtoappeal
Copyright in submitted documents remains with their authors. Request removal