9 June 2025 · Head of Development Management (Stephen Butler)
Dale Nurseries, Oatlands Road, Andreas, Isle Of Man, IM7 4er
The proposal seeks to amend an ongoing 31-dwelling residential development by replacing the approved two-storey chalet-style three-bedroom house on Plot 30 with a single-storey bungalow of the same bedroom count, including an attached garage, two driveway parking spaces, and an Air Source Heat Pump.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The principle of development is acceptable as Plot 30 is within an Area of Predominantly Residential Use and the wider site has established permission under 22/01485/B, which is under construction; ch…
Spatial Policy 5
Requires development to make a positive contribution to the environment. The bungalow's compatible scale and design with matching materials contributes positively within the approved scheme.
Strategic Policy 11
Supports provision of 5,100 net additional dwellings by 2026. The proposal maintains housing provision in a Service Village.
Spatial Policy 3
Identifies Andreas as a Service Village for housing to meet local need. Plot 30 supports this in a residential area.
General Policy 2
Permits development respecting siting, scale, design, amenity, highway safety, parking, services, flooding risk, and energy reduction. Proposal complies via amendments, conditions, and compatibility with approved scheme.
Environment Policy 13
Prohibits unacceptable flood risk. Condition requires connection to Geocellular Attenuation Tank to manage surface water.
Environment Policy 42
Requires design accounting for local character. Materials to match surrounding housing ensures compliance.
Housing Policy 1
Seeks 5,100 dwellings by 2026. Maintains contribution to North's 770 allocation.
Housing Policy 3
Distributes housing to North. Supports village location.
Housing Policy 4
Prioritises housing in towns/villages. Fits existing settlement.
Transport Policy 1
Locate near public transport. Close to Andreas Service Village.
Transport Policy 7
Parking to accord with standards. Garage and two spaces provided.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Parking provision
The dwelling hereby approved shall not be occupied until the parking spaces have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking and turning of vehicles associated with the dwelling and shall remain free of obstruction for such use at all times.
Landscaping scheme
No development shall take place until a hard and soft landscaping scheme has been submitted to and approved in writing by the Department and all works shall be carried out in accordance with the approved details. Details of hard landscaping shall include driveway surfacing, finished ground levels, any new walls, fences and other boundary treatments and the approved works shall be completed before the dwelling is occupied. Details of soft landscaping shall include planting between the parking area of the approved dwelling and the neighbouring property being constructed to the west. All planting, including tree planting, seeding and turfing included in the approved details shall be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the dwelling, whichever is the sooner. Any trees or plants indicated on the approved scheme which, within a period of five years from the date of planting, die, are removed or become seriously damaged or diseased shall be replaced during the next planting season with other trees or plants of a species and size to be first approved in writing by the Department.
Road and footway construction
Prior to the occupation of the dwelling, the road and footway between it and the highway shall be constructed to at least base course level.
Tree and hedge protection
No development shall take place until details of existing trees and hedges to be retained on the site, along with details of the means of their protection during construction, have been submitted to and approved in writing by the Department. The existing trees and hedges shall be retained in accordance with the approved details. Any retained tree or hedge which within five years of the approved development being occupied or completed (whichever is the later) dies, are removed or become seriously damaged or diseased shall be replaced by a similar species, of a size to be first approved in writing by the Department, during the next planting season or in accordance with a programme of replacement to be agreed in writing with the Department.
Drainage details
No development shall take place until details of the means of drainage of the site, to include connection to a Geocellular Attenuation Tank, have been submitted to and approved in writing by the Department. The approved means of drainage shall be completed and ready for use before the dwelling is occupied and shall be retained and maintained thereafter.
Solar panels
No development shall take place until details of the solar panels to be fitted to the rear roof slope have been submitted to and approved in writing by the Department. The solar panels shall be fitted in accordance with the approved details prior to the occupation of the dwelling and shall be retained and maintained thereafter.
Materials approval
No development shall take place until details of the external facing and roofing materials have been submitted to and approved in writing by the Department. Such materials shall match those being used in the construction of the surrounding new housing and the development shall take place in accordance with the approved details.
no objection, note added regarding surface water runoff