Loading document...
==== PAGE 1 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Mr Michael Hoctor Capel Glen Pinfold Hill Isle Of Man Laxey IM4 7HP TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr Roger Smith, Ref 24/91394/B, for the Erection of ground mounted solar pv array at Claddagh Farm Sulby Bridge Sulby Isle Of Man IM7 2EZ . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals. 2. The panels hereby approved shall be installed in full accordance with the details submitted. The distance from the lane to the nearest side of the array shall be no greater than 27m as indicated on Site Plan 1:500 published 17th April and shall be retained as such thereafter. Reason: the application has been assessed on this basis in accordance with the drawing submitted and in the interest of the ecosystems and marshy grassland within the area. 3. In the event that the solar panels hereby approved are no longer used or required for renewable and alternative energy generation for the property known as 'Claddagh Farm' (as outlined in blue on Location Plan 1:2500) for a period exceeding 12 months, the solar panels and any supporting frames and infrastructure, including any concrete piles and cabling shall be removed and the ground restored to its former condition within 6 months of the date the use ceased. Reason: The structures have been exceptionally approved solely to meet sustainable energy need and its subsequent retention would result in an unwarranted intrusion in the countryside.
==== PAGE 2 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 This approval relates to the following: o Location Plan 1:1250 o Location Plan 1:2500 o Site Plan 1:500 o Plan and Section 1:100 o Site Photo
==== PAGE 3 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which informed the assessment and decision is available to view on the Government’s website (via https://pbc.gov.im/online- applications/) Implementation A determination to grant planning approval does not have effect - · if an appeal is submitted until the appeal is determined or withdrawn; or · if no appeal is submitted, but there are potential appellants in addition to the applicant, until the time within which an appeal may be submitted has expired (21 days from the date of this notice). Development must be carried out in accordance with the approved plans and any attached conditions (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal can only be made by a person who has been accorded rights to do so, must be in writing, include the appropriate fee and be submitted to the Department within 21 days of the date of this Notice. Guidance on how to appeal is available at gov.im/howtoappeal
Copyright in submitted documents remains with their authors. Request removal