==== PAGE 1 ====
+20.947
+
- 0.45
ramp up
font
transition
kerb
drop-off / pick-up bay
drop
drop
kerb
drop
kerb
transition
kerb
19.75
MH
20.62
MH
20.38
MH
20.25
MH
RG
20.94
20.92
20.28
20.32
20.12
20.64
20.96
20.937
+20.937
+20.716
+20.950
+20.14
+20.14
+20.270
+20.270
up
up
20.937+
New manhole covers and
chambers realigned to
suit pavers
New manhole covers and
chambers realigned to suit pavers
external
social area
Tobermore "Mayfair Slabs"
600x400x50mm
Colour: Silver
to External Social Area.
Tobermore "Tactile Hazard Warning Flags"
400x400x40mm
Colour: Silver
2x rows, 400mm from top step
Tobermore "Artro Paver Blocks"
220x55x80mm
Colour: Platinum
forming the ramped access
Tobermore "Mayfair Step Slabs"
400x400x40mm
Colour: Silver with Black contrasting edge
to form step treads
Stainless steel posts and top rail with
structural glass balustrading guarding edge
of External Social Area.
Tobermore "Tactile Hazard Warning Flags"
400x400x40mm
Colour: Silver
2x rows, 400mm from bottom step
Stainless steel handrail to stairs mounted
into sockets on ground.
Tobermore "Mayfair Slabs"
600x400x50mm
Colour: Silver
to top landing.
ramp up
Stainless steel posts and top rail with
structural glass balustrading guarding edge
of External Social Area.
New concrete kerb stones, transition kerbs
and drop kerbs to suit new drop off bay.
Existing concrete pavements to be made
good to the complete satisfaction of the
Dept of Infrastructure Highways Engineers.
New concrete kerb stones, transition kerbs
and drop kerbs to suit new drop off bay.
Existing concrete pavements to be made
good to the complete satisfaction of the
Dept of Infrastructure Highways Engineers.
New dimpled crossing flags laid to match
new dimpled crossing flags to be laid
opposite, by carpark exit. Existing concrete
pavements to be made good to the
complete satisfaction of the Dept of
Infrastructure Highways Engineers.
+20.38
New tarmac drop off bay and repairs to
roadway making good surfaces disturbed
during the construction works all to the
complete satisfaction of the Dept of
Infrastructure Highways Engineers.
19 Mount Havelock Douglas Isle of Man IM1 2QG
tel. (01624)628141
email. [email protected]
web. www.mcgarrigle-architects.com
McGarrigle architects
architects anG urban Gesigners
project title
drawing title
rev date
Gate
01
job no
11:12:24
188
scale
client no
1:100 @A3
3-06
chkG b
Grg no
Grn b
jrh
rev
HARD LANDSCAPING DETAILS
PROPOSED RENOVATION AND EXTENSION
TO CREATE NEW CHURCH BUILDING
AT REMOVALS HOUSE
FINCH ROAD, DOUGLAS
FOR LIVING HOPE CHURCH.