King William's College The Buchan School Design and Access Statement - Colbourne House 7267 Revision (01) January 2025
WILSON MASON architecture and interior design

| Revision | Details | Prepared By | Checked By | Date |
|---|---|---|---|---|
| Rev 01 | Planning Issue | LW | EW | 24/01/2025 |
Revision Details Prepared By Checked By Date Rev 01 Planning Issue LW EW 24/01/2025
4
This Design and Access Statement has been prepared in support of the planning application for the relocation of the Buchan School early years facilities, and other support facilities not included within the previous planning application (No. 24/90923/B), onto the King Williams College site.
This Design and Access Statement is intended to allow the Local Planning Authority, the local community and others interested in the proposals to understand the design principles behind the development.
This report explains how the current proposals have evolved as a result of consultation during the design development period. The Design and Access Statement should be read in conjunction with all supporting information submitted as part of the planning application.
The design team were appointed to explore options to relocate the Buchan School early years from it's existing site to the King William's College campus. This application is linked to previous application No. 24/90923/B, which sees the Buchan School prep years and support facilities relocated into Jackson House and the Stenning Building, with associated landscaping works for play and external teaching.
A number of existing buildings on the King William's College site were considered for potential accommodation for the Buchan School early years and support facilities, including Junior House, Colbourne House and the DT Building.
After consideration and exploration of a number of options, the agreed proposal is to convert the ground floor of Colbourne House into early years teaching accommodation and additional ancillary spaces for the Buchan School, including a dining hall, WC's, staff room, offices and an art classroom. This was the most viable option on an economic, programme and quality basis, as well as sitting adjacent to the previous planning application for Jackson House, Stenning building and the associated landscaping works to the site. First floor will be retained by the senior school and is out of scope for this proposal.


King William's College is located in Castletown, situated towards the south of the island.
The site overlooks the coast to the south, borders the airport to the north and a residential development to the southwest. The school has a large amount of open space currently used as playing / sports fields & grassland.
Development height restrictions apply to the King William's College site due to the close proximity of the airports runways.
The original King William's College Building was constructed between 1830 and 1833, this included the principal elevation, the bell tower and rear dining hall which formed a cruciform structure. Much of the original building was destroyed by a fire in 1844, this was later rebuilt.
These original buildings have been added to and were extended both horizontally and vertically over the years to form the current layout – this building work took place mostly between 1863 and 1958.
The main building along with some outbuildings were designated as a registered Building under the Protected Building Register of the Isle of Man in 2001.
Whilst some of the facilities are purpose built for their intended educational use, others have been adapted, altered and reconfigured during their lifetime.

Site map not to scale
Building Key:
Map Key:
Denotes designated Registered Building under the Protected Building Register of the Isle of Man in 2001. Denotes existing buildings on campus Denotes King William’s College grounds

Site map not to scale
Building Key:
Uses Key:
Administration / Executive / Governors Teaching Maintenance / Technical & Supporting Space Services / Ancillary & Peripheral Uses Sports Facility Boarding / Residential Unused



The Colbourne House building is a two-storey, load bearing masonry building. The building was constructed in 1980 and the external envelope is facing stonework. The ground floor is of solid, suspended construction. The first floor structure is beam and block, with beam spans from front to back, the beam and block system utilises a hollow block infill.
The building is currently used as a residential dormitory on both ground and first floors. The existing building structure was considered 'satisfactory' in the 2024 survey from BB Consulting.
Front elevation and main entrance
Side entrance and additional first floor access
| Accommodation Schedule GF (Existing) | Accommodation Schedule GF (Existing) | Accommodation Schedule GF (Existing) | Accommodation Schedule GF (Existing) | Accommodation Schedule GF (Existing) |
|---|---|---|---|---|
| Number | Name | Level | Area | Comments |
G5
Bedroom G7 8.29 m²
G6
Bedroom G8 7.60 m² Bedroom G10 7.95 m² Bedroom G12 7.53 m² Bedroom G13 7.53 m²
Stairs 2 GF
Kitchen / Lounge
Bedroom
| Corridor | GF - Ground Floor | 23.71 m² | ||
|---|---|---|---|---|
| Corridor | GF - Ground Floor | 28.80 m² | ||
| Corridor | GF - Ground Floor | 30.86 m² | ||
| Entance Hall | GF - Ground Floor | 26.22 m² | ||
| Bathroom | GF - Ground Floor | 3.24 m² | ||
| Stairs 2 GF | GF - Ground Floor | 17.73 m² | ||
| G1 | TV Room | GF - Ground Floor | 20.89 m² | |
| G2 | Common Room | GF - Ground Floor | 63.70 m² | |
| G3 | Circulation | GF - Ground Floor | 17.29 m² | |
| G4 | Circulation | GF - Ground Floor | 3.34 m² | |
| G5 | Kitchen / Lounge | GF - Ground Floor | 24.09 m² | |
| G6 | Bedroom | GF - Ground Floor | 8.29 m² | |
| G7 | Bedroom | GF - Ground Floor | 7.60 m² | |
| G8 | Bedroom | GF - Ground Floor | 7.95 m² | |
| G9 | Study | GF - Ground Floor | 4.60 m² | |
| G10 | Bedroom | GF - Ground Floor | 7.53 m² | |
| G11 | Study | GF - Ground Floor | 4.52 m² | |
| G12 | Bedroom | GF - Ground Floor | 7.53 m² | |
| G13 | Bedroom | GF - Ground Floor | 8.52 m² | |
| G14 | Storeroom | GF - Ground Floor | 6.32 m² | |
| G15 | Bedroom | GF - Ground Floor | 12.86 m² | |
| G16 | Bedroom | GF - Ground Floor | 7.72 m² | |
| G17 | Bedroom | GF - Ground Floor | 24.44 m² | |
| G18 | Bedroom | GF - Ground Floor | 10.32 m² | |
| G19 | Bedroom | GF - Ground Floor | 11.93 m² | |
| G20 | Bedroom | GF - Ground Floor | 8.25 m² | |
| G21 | Showers / Toilets | GF - Ground Floor | 41.79 m² | |
| G22 | Cleaner Store | GF - Ground Floor | 4.08 m² | |
| G23 | Bedroom | GF - Ground Floor | 23.28 m² | |
| G24 | Bedroom | GF - Ground Floor | 7.45 m² | |
| G25 | Bedroom | GF - Ground Floor | 7.31 m² | |
| G26 | Store Room | GF - Ground Floor | 4.66 m² | |
| G27 | Bedroom | GF - Ground Floor | 7.28 m² | |
| G28 | Study | GF - Ground Floor | 4.47 m² | |
| G29 | Kitchen | GF - Ground Floor | 7.35 m² | |
| G30 | Study | GF - Ground Floor | 4.48 m² | |
| G31 | Study | GF - Ground Floor | 4.65 m² |
17.73 m²
24.09 m²
8.52 m²
Fuseboard
G14
Storeroom
6.32 m²
G16
Bedroom
G4
Corridor
Circulation
7.72 m²
30.86 m²
G17
G3 3.34 m²
Bedroom
Circulation
24.44 m²
17.29 m²
G9
G11
G15
Study
Study
Bedroom
4.60 m²
4.52 m²
12.86 m²
Bedroom
G18
20-002 W
E 20-002
G2
Corridor
Common Room
28.80 m²
63.70 m²
BB 20-010
G19
Bedroom
G21
Showers / Toilets
41.79 m²
G20
Bedroom
8.25 m²
G26
| Service void hatch |
|---|
Service void hatch
Store Room
G31
G30
G28
4.66 m²
G22
Study
Study
Study
DB Panel: 0.050 Electric 0.030 Electric
Cleaner Store
Bathroom
G1 4.65 m²
4.48 m²
4.47 m²
4.08 m²
3.24 m²
TV Room
20.89 m²
| Service void hatch<br><br> |
|---|
Entance Hall
Corridor
26.22 m²
23.71 m²
G23
Bedroom
23.28 m²
Grand total: 37 515.03 m²
G29
G27
G25
G24
Kitchen
Bedroom
Bedroom
Bedroom
Ceiling hatch
7.35 m²
7.28 m²
7.31 m²
7.45 m²
S
20-001
Colbourne House - Ground Floor Plan - Existing 1
Not to scale
1 : 100
| Accommodation Schedule GF (Existing) | ||||
| Number | Name | Level | Area | Comments |
| Combe | GF - Ground Floor | 23.71 m² | ||
| Combe | GF - Ground Floor | 28.98 m² | ||
| Combe | GF - Ground Floor | 38.98 m² | ||
| Enbaco Hall | GF - Ground Floor | 38.22 m² | ||
| Babbush | GF - Ground Floor | 3.24 m² | ||
| Glass 2 GF | GF - Ground Floor | 17.73 m² | ||
| 02 | Tri-Term | GF - Ground Floor | 20.66 m² | |
| 03 | Common Room | GF - Ground Floor | 65.78 m² | |
| 04 | Cricadelle | GF - Ground Floor | 17.28 m² | |
| 06 | Cricadelle | GF - Ground Floor | 3.34 m² | |
| 06 | Hollow Triangle | GF - Ground Floor | 34.68 m² | |
| 08 | Babbush | GF - Ground Floor | 8.26 m² | |
| 07 | Babbush | GF - Ground Floor | 7.60 m² | |
| 08 | Babbush | GF - Ground Floor | 7.95 m² | |
| 09 | Sharp | GF - Ground Floor | 4.60 m² | |
| 014 | Babbush | GF - Ground Floor | 7.33 m² | |
| 011 | Sharp | GF - Ground Floor | 4.52 m² | |
| 012 | Babbush | GF - Ground Floor | 7.53 m² | |
| 013 | Babbush | GF - Ground Floor | 8.32 m² | |
| 014 | Shorroom | GF - Ground Floor | 6.32 m² | |
| 015 | Babbush | GF - Ground Floor | 13.98 m² | |
| 016 | Babbush | GF - Ground Floor | 7.72 m² | |
| 017 | Babbush | GF - Ground Floor | 26.49 m² | |
| 018 | Babbush | GF - Ground Floor | 16.32 m² | |
| 019 | Babbush | GF - Ground Floor | 11.56 m² | |
| 020 | Babbush | GF - Ground Floor | 6.25 m² | |
| 021 | Dinners' Tablet | GF - Ground Floor | 41.76 m² | |
| 022 | Citadel State | GF - Ground Floor | 4.68 m² | |
| 023 | Babbush | GF - Ground Floor | 23.28 m² | |
| 024 | Babbush | GF - Ground Floor | 7.45 m² | |
| 025 | Babbush | GF - Ground Floor | 7.37 m² | |
| 026 | Dare Night | GF - Ground Floor | 4.68 m² | |
| 027 | Babbush | GF - Ground Floor | 7.38 m² | |
| 028 | Sharp | GF - Ground Floor | 4.47 m² | |
| 029 | Hollow | GF - Ground Floor | 7.35 m² | |
| 030 | Sharp | GF - Ground Floor | 4.48 m² | |
| 031 | Sharp | GF - Ground Floor | 3.63 m² |

| Accommodation Schedule FF (Existing) | Accommodation Schedule FF (Existing) | Accommodation Schedule FF (Existing) | Accommodation Schedule FF (Existing) | Accommodation Schedule FF (Existing) |
|---|---|---|---|---|
| Number | Name | Level | Area | Comments |
Stairs 2 FF
14.86 m²
Bedroom
F6
11.05 m²
Bedroom
F7
16.00 m²
Showers
F8
16.22 m²
Toilets
F9
16.72 m²
Bedroom
F10
3.38 m²
Toilets
F12
8.81 m²
Store Room
F13
15.87 m²
Bedroom
14.75 m²
Bedroom
F5
14.93 m²
Bedroom
F4
| Corridor | 01 - First Floor | 7.65 m² | ||
|---|---|---|---|---|
| Corridor | 01 - First Floor | 29.14 m² | ||
| Corridor | 01 - First Floor | 21.20 m² | ||
| Stairs 1 FF | 01 - First Floor | 14.81 m² | ||
| Stairs 2 FF | 01 - First Floor | 14.86 m² | ||
| Corridor | 01 - First Floor | 36.72 m² | ||
| F1 | Bedroom | 01 - First Floor | 18.03 m² | |
| F2 | Bedroom | 01 - First Floor | 12.12 m² | |
| F3 | Bedroom | 01 - First Floor | 16.66 m² | |
| F4 | Bedroom | 01 - First Floor | 14.93 m² | |
| F5 | Bedroom | 01 - First Floor | 14.75 m² | |
| F6 | Bedroom | 01 - First Floor | 15.76 m² | |
| F7 | Bedroom | 01 - First Floor | 11.05 m² | |
| F8 | Showers | 01 - First Floor | 16.00 m² | |
| F9 | Toilets | 01 - First Floor | 16.22 m² | |
| F10 | Bedroom | 01 - First Floor | 16.72 m² | |
| F11 | Bedroom | 01 - First Floor | 15.87 m² | |
| F12 | Toilets | 01 - First Floor | 3.38 m² | |
| F13 | Store Room | 01 - First Floor | 8.81 m² | |
| F14 | F14 | 01 - First Floor | 16.16 m² | |
| F14a | F14a | 01 - First Floor | 18.40 m² | |
| F14b | F14b | 01 - First Floor | 15.83 m² | |
| F15 | Showers / Toilets | 01 - First Floor | 35.09 m² | |
| F16 | Bedroom | 01 - First Floor | 17.24 m² | |
| F16a | Bedroom | 01 - First Floor | 16.95 m² | |
| F17 | Bedroom | 01 - First Floor | 21.44 m² | |
| F18 | Cleaner Store | 01 - First Floor | 2.01 m² | |
| F19 | Bedroom | 01 - First Floor | 18.71 m² | |
| F20 | Bathroom | 01 - First Floor | 8.03 m² | |
| F21 | Bedroom | 01 - First Floor | 17.41 m² | |
| F22 | Lounge | 01 - First Floor | 11.20 m² | |
| F23 | Bathroom | 01 - First Floor | 3.84 m² | |
| F24 | Store | 01 - First Floor | 2.03 m² | |
| F25 | Kitchen | 01 - First Floor | 5.61 m² | |
| F26 | Hall | 01 - First Floor | 5.01 m² | |
| F27 | Lobby | 01 - First Floor | 2.08 m² |
Distribution Panel (Indicative)
Server
F14
16.16 m²
F14a
18.40 m²
Corridor
29.14 m²
7.65 m² Corridor
20-002 W
E 20-002
Corridor
36.72 m²
F14b
15.83 m²
BB 20-010
F15
Showers / Toilets
35.09 m²
F3
Bedroom
Corridor
F16
21.20 m²
Bedroom
Bedroom
F16a
F18
F25
F24
F23
F2
F1
Cleaner Store
Kitchen
Store
Bathroom
Bedroom
Bedroom
F22
2.01 m²
5.61 m²
2.03 m²
3.84 m²
12.12 m²
18.03 m²
Lounge
11.20 m²
F20
Bathroom
8.03 m²
F27
F26
Lobby
Hall
2.08 m²
5.01 m²
Grand total: 36 521.72 m²
| (Hatch to Plant Room)<br><br> |
|---|
F17
F19
F21
Bedroom
Bedroom
Bedroom
21.44 m²
18.71 m²
17.41 m²
Stairs 1 FF
14.81 m²
S
20-001
1 1 : 100
Not to scale
| Accommodation Schedule FF (Existing) | ||||
| Number | Name | Level | Area | Comments |
| Condor | 01 - First Floor | 7.92 m² | ||
| Condor | 01 - First Floor | 20.14 m² | ||
| Condor | 01 - First Floor | 21.28 m² | ||
| Team 1 FF | 01 - First Floor | 14.61 m² | ||
| Team 2 FF | 01 - First Floor | 14.86 m² | ||
| Condor | 01 - First Floor | 28.72 m² | ||
| F1 | Bedroom | 01 - First Floor | 19.53 m² | |
| F2 | Bedroom | 01 - First Floor | 12.12 m² | |
| F3 | Bedroom | 01 - First Floor | 16.66 m² | |
| F4 | Bedroom | 01 - First Floor | 14.93 m² | |
| F5 | Bedroom | 01 - First Floor | 14.70 m² | |
| F6 | Bedroom | 01 - First Floor | 15.76 m² | |
| F7 | Bedroom | 01 - First Floor | 11.95 m² | |
| F8 | Towers | 01 - First Floor | 16.66 m² | |
| F9 | Tones | 01 - First Floor | 16.22 m² | |
| F10 | Bedroom | 01 - First Floor | 18.70 m² | |
| F11 | Bedroom | 01 - First Floor | 13.32 m² | |
| F12 | Tones | 01 - First Floor | 2.46 m² | |
| F13 | Town Room | 01 - First Floor | 6.61 m² | |
| F14 | F14 | 01 - First Floor | 16.18 m² | |
| F15a | F14a | 01 - First Floor | 15.48 m² | |
| F14b | F14b | 01 - First Floor | 15.89 m² | |
| F15 | Towers / Tones | 01 - First Floor | 30.99 m² | |
| F16 | Bedroom | 01 - First Floor | 17.24 m² | |
| F16a | Bedroom | 01 - First Floor | 16.95 m² | |
| F17 | Bedroom | 01 - First Floor | 21.44 m² | |
| F18 | Chand Skin | 01 - First Floor | 2.01 m² | |
| F19 | Bedroom | 01 - First Floor | 18.71 m² | |
| F20 | Bedroom | 01 - First Floor | 8.02 m² | |
| F21 | Bedroom | 01 - First Floor | 17.41 m² | |
| F22 | Lounge | 01 - First Floor | 11.26 m² | |
| F23 | Bathroom | 01 - First Floor | 3.64 m² | |
| F24 | Store | 01 - First Floor | 2.63 m² | |
| F25 | Anzhar | 01 - First Floor | 5.61 m² | |
| F26 | Hall | 01 - First Floor | 3.41 m² | |
| F27 | Lotto | 01 - First Floor | 2.48 m² | |
| Grand total (N) | 321/12 m² |



Decorative stone quions Stone brickwork Decorative stone quions
| 109851 | |
|---|---|
| 107835 | |
|---|---|
01 - First Floor
GF - Ground Floor
Colbourne - North Elevation - Existing N
1 : 100
Colbourne - North Elevation - Existing N
Not to scale
| 109851 | |
|---|---|
| 109851 | |
|---|---|
| 107835 | |
|---|---|
| 107835 | |
|---|---|
01 - First Floor GF - Ground Floor Existing timber decking
Not to scale
Colbourne - South Elevation - Existing
project no:
-DR
drawing no:


Drawing Numbering Key:
This drawing is copyright and owned by Wilson Mason Architects unless accepted in writing.
Drawing Numbering Key:
DO NOT SCALE this drawing (printed or electronic versions). Pri must check all dimensions from site. This drawing is to be read drawings and information and all other consultants and speciali
This drawing is copyright and owned by Wilson Mason Architects unless accepted in writing.
All BIM elements other than Architecture, have been imported fr model; reference should be made to the individual consultant's work.
DO NOT SCALE this drawing (printed or electronic versions). Pri must check all dimensions from site. This drawing is to be read drawings and information and all other consultants and speciali
Discrepancies and / or ambiguities within this drawing, between must be reported immediately to Wilson Mason for clarification
All BIM elements other than Architecture, have been imported fr model; reference should be made to the individual consultant's work.
All works are to be carried out in accordance with the latest C Regulations, British Standards and Industry regulatory codes of specifically directed otherwise.
Discrepancies and / or ambiguities within this drawing, between must be reported immediately to Wilson Mason for clarification
The Principal Contractor and Contractors are to ensure all work current manufacturers specific requirements.
All works are to be carried out in accordance with the latest C Regulations, British Standards and Industry regulatory codes of specifically directed otherwise.
Responsibility for the reproduction of this drawing in paper fo with the recipient to check that all information has been repli compared to the original paper or electronic image. Graphical r equipment on this drawing are approximations only. Please refer for actual sizes and / or specific contractor construction info
| 109851 | |
|---|---|
The Principal Contractor and Contractors are to ensure all work current manufacturers specific requirements.
Responsibility for the reproduction of this drawing in paper fo with the recipient to check that all information has been repli compared to the original paper or electronic image. Graphical r equipment on this drawing are approximations only. Please refer for actual sizes and / or specific contractor construction info
This original document is issued for the purpose indicated belo confidential nature. Further copies and circulation will be str agreement under the contract.
| 107835 | |
|---|---|
Existing timber decking
This Drawing Should be Printed in Colour
This original document is issued for the purpose indicated belo confidential nature. Further copies and circulation will be str agreement under the contract.
This Drawing Should be Printed in Colour 01 - First Floor GF - Ground Floor
Colbourne - East Elevation - Existing E
1 : 100
Not to scale
Stone brickwork Decorative stone quions Stone brickwork
| 109851 | |
|---|---|
109851
| 107835 | |
|---|---|
| 107835 | |
|---|---|
01 - First Floor
GF - Ground Floor
rev
Revision Schedule
Not to scale
Colbourne - West Elevation - Existing
rev
Revision Schedule

DO NOT SCALE this drawing (printed or electronic versions). Principal Contractor and Contractors must check all dimensions from site. This drawing is to be read in conjunction with all other Architects drawings and information and all other consultants and specialists' drawings and information.
Site map not to scale
model; reference should be made to the individual consultant's drawings for their specific elements of work. Music Department Blue line indicates extents of land in applicants ownership and overall site boundary line
Responsibility for the reproduction of this drawing in paper form, or if issued in electronic format, lies with the recipient to check that all information has been replicated in full and is correct when compared to the original paper or electronic image. Graphical representations of coordinated equipment on this drawing are approximations only. Please refer to the Specifications and / or Details for actual sizes and / or specific contractor construction information.
This original document is issued for the purpose indicated below and contains information of confidential nature. Further copies and circulation will be strictly in accordance with the confidentiality agreement under the contract.
Orange line indicated extent of adjacent linked planning application (works to landscape, Jackson House and Stenning) reference No. 24/90923/B
Blue Line indicates Extents of Land in Applicants Ownership and Overall Site Boundary Line
Orange Line indicates extent of adjacent linked planning application (works to landscape, Jackson House and Stenning) Reference No. 24/90923/B
Jackson House
Red line indicates application boundary and extent of proposed site works
Extent of Proposed Site Works
Dark Grey Hatch Indicates Existing Buildings on Site
Dark grey hatch indicates existing buildings on site All existing elements are modelled from information received by Excel's Site Survey, received 23/07/2024 Light grey hatch indicates surrounding buildings Stenning Building
QUI
DT Building
Colbourne House
UP
HM Bungalow
KWC - Main Building
TBS-WMA-ZZ-00-DR -00-011 S3 P01
-A
Colbourne Building - Existing Site Plan
Tel: 01772 877455

DO NOT SCALE this drawing (printed or electronic versions). Principal Contractor and Contractors must check all dimensions from site. This drawing is to be read in conjunction with all other Architects drawings and information and all other consultants and specialists' drawings and information.
Site map not to scale
model; reference should be made to the individual consultant's drawings for their specific elements of work. Music Department Blue line indicates extents of land in applicants ownership and overall site boundary line
Responsibility for the reproduction of this drawing in paper form, or if issued in electronic format, lies with the recipient to check that all information has been replicated in full and is correct when compared to the original paper or electronic image. Graphical representations of coordinated equipment on this drawing are approximations only. Please refer to the Specifications and / or Details for actual sizes and / or specific contractor construction information.
This original document is issued for the purpose indicated below and contains information of confidential nature. Further copies and circulation will be strictly in accordance with the confidentiality agreement under the contract.
Orange line indicated extent of adjacent linked planning application (works to landscape, Jackson House and Stenning) reference No. 24/90923/B
Blue Line indicates Extents of Land in Applicants Ownership and Overall Site Boundary Line
Orange Line indicates extent of adjacent linked planning application (works to landscape, Jackson House and Stenning) Reference No. 24/90923/B
Jackson House
Red line indicates application boundary and extent of proposed site works
Extent of Proposed Site Works
Dark Grey Hatch Indicates Existing Buildings on Site
Dark grey hatch indicates existing buildings on site All existing elements are modelled from information received by Excel's Site Survey, received 23/07/2024 KWC access to FF boarding
Please refer to 'Iteriad' drawing package for technical details and specification relating to landscape design. Some furniture / provisions shown on current prpoposed design may be out of current scope
Light grey hatch indicates surrounding buildings
Stenning Building
QUI
DT Building
Main nursery Entrance
Buchan access
HM Bungalow
KWC access to FF boarding Buchan dining delivery access KWC - Main Building
TBS-WMA-ZZ-00-DR -00-012 S3
-A
Colbourne Building - Proposed Site Plan
Tel: 01772 877455
The project brief and key objectives for the Buchan School early years relocation have been developed through a series of user briefing meetings and stakeholder consultations.
Key Deliverables In addition to the core teaching facilities the following key deliverables have been identified for the scheme;
A review of the existing accommodation at the Buchan School has been undertaken to develop an existing accommodation schedule. This schedule has then been refined through consultation with the school to establish the proposed accommodation schedule for the new early years and ancillary spaces for the Buchan School prep years.
The accommodation schedule required areas have been developed using the UK Department for Education requirements as a baseline and for comparison to establish minimum provisions. It is highlighted that the recommended spatial requirements might not be achieved due to the layout / limitations of the exiting building.
The core teaching accommodation targets are outlined below;

The proposed scheme looks to re-purpose the ground floor of the Colbourne Building, to provide early years teaching accommodation and associated provisions. The scheme will also see the rest of the ground floor utilised for ancillary spaces and additional facilities for the overall Buchan School. Spaces requested are: an art classroom, dining hall, medical rooms, staff room and a dining hall. These spaces are to be shared with the early years and the rest of the Buchan School.
The existing first floor of Colbourne is to be retained by the senior school, there are no proposed changes to this section of the building and it does not form part of this application scope. The existing entrances and stair cores will be blocked off and inaccessible from ground level, to ensure that access to the teaching facilities is secure to pupils and authorised staff only.
Two new entrances are proposed as part of the scheme. One for pupil and teacher access for the prep and pre-prep classes, and one for the early years facility / drop off. The early years layout accommodates two larger classrooms and one Smaller classroom that will double up as a sleep room.
Externally the landscape will be amended to incorporate the two new pupil entrances for the school, as well as the staff / food trolley access to the dining hall. Installation of sloped access will also be incorporated to these areas, due to level differences on the site. The main early years sloped access will be a timber effect composite clad decking with a powder coated steel balustrade. Additional sloped entrances will have matching finishes. The Western section of woodland will be updated to provide external play for the early years pupils, with the installation of a perimeter fence to separate from the prep and pre-prep children.
The central courtyard will be utilised as a dedicated external play area for the early years, with the provision of a steel canopy as part of the works. The existing external floor finish to this area is to be removed and a new tarmac finish is to be installed, with amended levels, to allow for level access into the courtyard from the proposed two entry points.
There are no plans under this application to demolish, extend or replace any of the existing buildings on the site. An external steel canopy is to be provided within the central courtyard of Colbourne, to provide covered external space for the early years classrooms.
The external areas are to be re landscaped to accommodate the Colbourne building into the wider scheme, whilst also providing appropriate and appealing external teaching and playground provision. Installation of new sloped access to the proposed entrances will form part of the landscaping works, and a timber effect composite clad decking is to be installed. This will wrap around the Northeastern corner of the building and allow the main early years classroom to have direct external access to the main play, area and provide an additional means of fire escape.
In order to comply with current building regulations, the classrooms are to be provided with mechanical ventilation. This has required the provision of external louvred vents within the existing external envelope.
The existing layout and configuration of the site is largely to be retained and enhanced. The arrangement of the existing buildings on the site are unaffected by the proposals. Elements of the landscape design, from the previous planning application (No. 24/90923/B), will have to be amended to incorporate the three new entrances proposed for Colbourne into the wider scheme.
Internal courtyard to be utilised as early years external play
| Accommodation Schedule GF (Proposed) | |||||
| Number | Name | Level | Area | Occupancy | Comments |
| GF-001 | Star 1 | GF | Ground Floor | 15-15 m² | |
| GF-002 | Circulation | GF | Ground Floor | 18-22 m² | |
| GF-003 | Plant Room | GF | Ground Floor | 3-30 m² | |
| GF-004 | Circulation | GF | Ground Floor | 14-22 m² | |
| GF-005 | Buchan Cirring Hall | GF | Ground Floor | 30-40 m² | 48 |
| GF-006 | Circulation | GF | Ground Floor | 28-34 m² | |
| GF-007 | Hill Classroom | GF | Ground Floor | 18-21 m² | 25 |
| GF-008 | Pupil MC | GF | Ground Floor | 7-30 m² | |
| GF-009 | Pupil MC | GF | Ground Floor | 7-12 m² | |
| GF-010 | Inc. MC | GF | Ground Floor | 4-40 m² | |
| GF-011 | Day, Head Office | GF | Ground Floor | 4-31 m² | |
| GF-012 | Self main | GF | Ground Floor | 10-41 m² | |
| GF-013 | Circulation | GF | Ground Floor | 10-58 m² | |
| GF-015 | Store | GF | Ground Floor | 8-22 m² | |
| GF-017 | Star 2 | GF | Ground Floor | 17-15 m² | |
| GF-018 | Circulation | GF | Ground Floor | 20-34 m² | |
| GF-019 | Nursery Class 3 | GF | Ground Floor | 27-35 m² | 16 |
| GF-020 | Nursery MC-1 | GF | Ground Floor | 15-40 m² | |
| GF-021 | Hygiene Room | GF | Ground Floor | 4-40 m² | |
| GF-022 | Nursery Food Prep | GF | Ground Floor | 4-30 m² | |
| GF-023 | Nursery Class 2 | GF | Ground Floor | 20-75 m² | 24 |
| GF-024 | Classroom 11: Dining Room | GF | Ground Floor | 22-78 m² | 6 |
| GF-025 | Store | GF | Ground Floor | 1-31 m² | |
| GF-026 | Nursery MC-2 | GF | Ground Floor | 5-27 m² | |
| GF-027 | Cleaner Store | GF | Ground Floor | 3-44 m² | |
| GF-028 | Inc. MC | GF | Ground Floor | 4-27 m² | |
| GF-029 | Nursery India | GF | Ground Floor | 22-55 m² | |
| GF-030 | Nursery Reception | GF | Ground Floor | 7-31 m² | |
| GF-031 | Nursery Office | GF | Ground Floor | 7-30 m² | |
| GF-032 | Nursery Meeting Room | GF | Ground Floor | 4-40 m² | |
| GF-033 | Medical Treatment | GF | Ground Floor | 7-42 m² | |
| GF-034 | Medical Breakout | GF | Ground Floor | 4-32 m² | |
| GF-035 | Medical Breakout | GF | Ground Floor | 4-40 m² | |
| Guest item: 32 | 3/8-12 m² |

AA 20-110
ED_GF_006a
GF-017
Stair 2
GF-010
Acc. WC
GF-008
GF-009
GF-006
Pupil WC
Pupil WC
Circulation
D_GF-010a
Fuseboard
GF-016
Store
D_GF-008a
D_GF-009a
D_GF-016a
EW_GF-019aEW_GF-023bEW_GF-023a
GF-012
Staff room
Circulation GF-015 33.41 m²
D_GF-015a
Occupancy: 14
D_GF-015a
D_GF-015b
GF-007
Art Classroom
D_GF-011a
45.61 m²
Occupancy: 20
D_GF-007a
GF-025
GF-019
Store
Nursery Class 1
GF-011
GF-026
37.65 m²
Dep. Head Office
Occupancy: 16
Nursery WC 2
ED_GF_019aED_GF_023a
D_GF-025a
D_GF-006a
D_GF-019a
20-101 W E 20-101
ED_GF_005a
D_GF-022aD_GF-021a
GF-005
Buchan Dining Hall
ED_GF_004a
GF-021
GF-018
63.40 m²
Hygiene Room
Circulation
Occupancy: 48
CANOPY GF-020
Nursery WC 1
BB 20-110
GF-022
Nursery Food Prep
GF-004
GF-024
Circulation
Classroom 3 / Sleep Room
22.76 m²
Occupancy: 8
D_GF-023a
ED_GF_018a
D_GF-028a
D_GF-027a
D_GF-002b
| Service void hatch |
|---|
Service void hatch
GF-028
GF-027
GF-035
GF-034
GF-032
Acc. WC
Cleaner Store
Medical Breakout Medical Breakout Nursery Meeting Room DB Panel: 0.050 Electric 0.030 Electric Plant Room GF-003
D_GF-035a
D_GF-034a
D_GF-032a
GF-023
GF-002
D_GF-029a
Nursery Class 2
Circulation
D_GF-002a
53.73 m²
| Service void hatch<br><br> |
|---|
Occupancy: 24
D_GF-003a
GF-029
Nursery lobby
D_GF-033a
D_GF-031a
D_GF-030a
GF-001
Stair 1
Ceiling hatch
GF-033
GF-031
GF-030
Medical Treatment
Nursery Office
Nursery Reception
ED_GF_029a
EW_GF-033a
S
Colbourne House - Ground Floor Plan - Proposed 1
1 : 100
Not to scale
| Accommodation Schedule GF (Proposed) | Accommodation Schedule GF (Proposed) | Accommodation Schedule GF (Proposed) | Accommodation Schedule GF (Proposed) | Accommodation Schedule GF (Proposed) | Accommodation Schedule GF (Proposed) |
|---|---|---|---|---|---|
| Number | Name | Level | Area | Occupancy | Comments |
| GF-001 | Stair 1 | GF - Ground Floor | 15.13 m² | ||
|---|---|---|---|---|---|
| GF-002 | Circulation | GF - Ground Floor | 19.53 m² | ||
| GF-003 | Plant Room | GF - Ground Floor | 5.69 m² | ||
| GF-004 | Circulation | GF - Ground Floor | 14.82 m² | ||
| GF-005 | Buchan Dining Hall | GF - Ground Floor | 63.40 m² | 48 | |
| GF-006 | Circulation | GF - Ground Floor | 29.04 m² | ||
| GF-007 | Art Classroom | GF - Ground Floor | 45.61 m² | 20 | |
| GF-008 | Pupil WC | GF - Ground Floor | 7.60 m² | ||
| GF-009 | Pupil WC | GF - Ground Floor | 7.12 m² | ||
| GF-010 | Acc. WC | GF - Ground Floor | 4.48 m² | ||
| GF-011 | Dep. Head Office | GF - Ground Floor | 4.61 m² | ||
| GF-012 | Staff room | GF - Ground Floor | 33.41 m² | 14 | |
| GF-015 | Circulation | GF - Ground Floor | 10.06 m² | ||
| GF-016 | Store | GF - Ground Floor | 6.32 m² | ||
| GF-017 | Stair 2 | GF - Ground Floor | 17.73 m² | ||
| GF-018 | Circulation | GF - Ground Floor | 29.54 m² | ||
| GF-019 | Nursery Class 1 | GF - Ground Floor | 37.65 m² | 16 | |
| GF-020 | Nursery WC 1 | GF - Ground Floor | 13.46 m² | ||
| GF-021 | Hygiene Room | GF - Ground Floor | 4.49 m² | ||
| GF-022 | Nursery Food Prep | GF - Ground Floor | 4.58 m² | ||
| GF-023 | Nursery Class 2 | GF - Ground Floor | 53.73 m² | 24 | |
| GF-024 | Classroom 3 / Sleep Room | GF - Ground Floor | 22.76 m² | 8 | |
| GF-025 | Store | GF - Ground Floor | 1.97 m² | ||
| GF-026 | Nursery WC 2 | GF - Ground Floor | 5.37 m² | ||
| GF-027 | Cleaner Store | GF - Ground Floor | 3.44 m² | ||
| GF-028 | Acc. WC | GF - Ground Floor | 4.27 m² | ||
| GF-029 | Nursery lobby | GF - Ground Floor | 22.83 m² | ||
| GF-030 | Nursery Reception | GF - Ground Floor | 7.31 m² | ||
| GF-031 | Nursery Office | GF - Ground Floor | 7.28 m² | ||
| GF-032 | Nursery Meeting Room | GF - Ground Floor | 4.48 m² | ||
| GF-033 | Medical Treatment | GF - Ground Floor | 7.42 m² | ||
| GF-034 | Medical Breakout | GF - Ground Floor | 4.52 m² | ||
| GF-035 | Medical Breakout | GF - Ground Floor | 4.66 m² |
Grand total: 33 524.31 m²
Buchan Nursery Buchan School Circulation Existing Spaces Medical Plant
Denotes existing areas out of scope


Stone brickwork New dark grey vented louvres - RAL colour 7016 Stone brickwork New external glazed door - RAL colour 9016, stone quions around perimeter to be amended to suit
107835
Decorative stone quions
| 109851 | |
|---|---|
New dark grey vented louvres - RAL colour 7016 landscape package for further information New powder coated steel balustrade and timber handrail - RAL colour 7016, refer to landscape package for further information
| 107835 | |
|---|---|
New sloped access for staff and pupils, refer to landscape package for further information New powder coated steel balustrade and timber handrail - RAL colour 7016, refer to landscape package for further information 01 - First Floor GF - Ground Floor GF - Ground Floor
1 : 100
Colbourne - North Elevation - Proposed
Not to scale
New dark grey vented louvres - RAL colour 7016
New external window to replace existing doorset RAL colour 9016, stone quions around perimeter to be amended to suit
New 1:18 access ramp for deliveres into dining hall and means of escape only, refer to 'Iteriad' landscape package for further information / specification
| 109851 | |
|---|---|
New external glazed door - RAL colour 9016, stone quions around perimeter to be amended to suit New dark grey vented louvres - RAL colour 7016 New external window to replace existing doorset RAL colour 9016, stone quions around perimeter to
New 1:18 access ramp for deliveres into dining hall and means of escape only, refer to 'Iteriad' landscape package for further information / specification
New powder coated steel balustrade and timber handrail - RAL colour 7016, refer to landscape package for further information
New timber composite decking with cladded fascias to provide direct escape for nursery classrooms and
| 107835 | |
|---|---|
| 109851 | |
|---|---|
New external glazed door - RAL colour 9016, stone quions around perimeter to be amended to suit
new entrance / drop off point for nursery. Includes 1:21 sloped access, refer to 'Iteriad' landscape package for further information / specification
New timber composite decking with cladded fascias new entrance / drop off point for nursery. Includes 1:21 sloped access, refer to 'Iteriad' landscape package for further information / specification
| 107835 | |
|---|---|
New powder coated steel balustrade and timber handrail - RAL colour 7016, refer to landscape package for further information 01 - First Floor GF - Ground Floor
Colbourne - South Elevation - Proposed
Not to scale
1 : 100
CB - Proposed Elevations - N&S
-A


amended to suite, where applicable New structural openings and external windows - RAL colour 9016, stone quions around perimeter to be amended to suite, where applicable New external glazed doors - RAL colour 9016, stone quions around perimeter to be amended to suit
| 109851 | |
|---|---|
New timber composite decking with cladded fascias to provide direct escape for nursery classrooms and new entrance / drop off point for nursery. Includes 1:21 sloped access, refer to 'Iteriad' landscape package for further information / specification
| 109851 | |
|---|---|
New timber composite decking with cladded fascias to provide direct escape for nursery classrooms and new entrance / drop off point for nursery. Includes 1:21 sloped access, refer to 'Iteriad' landscape package for further information / specification
New dark grey vented louvres - RAL colour 7016
| 107835 | |
|---|---|
amended to suite, where applicable New structural openings and external windows - RAL colour 9016, stone quions around perimeter to be amended to suite, where applicable 01 - First Floor GF - Ground Floor package for further information New powder coated steel balustrade and timber handrail - RAL colour 7016, refer to landscape package for further information
Colbourne - East Elevation - Proposed
Colbourne - East Elevation - Proposed
1 : 100
Not to scale
Stone brickwork New external glazed door to replace existing window - RAL colour 9016, stone quions around bottom perimeter to be amended to suit new external level Decorative stone quions Stone brickwork New external glazed door to replace existing window -
| 109851 | |
|---|---|
Decorative stone quions
New sloped access for staff and pupils, refer to landscape package for further information
New 1:18 access ramp for deliveres into dining hall and means of escape only, refer to 'Iteriad' landscape package for further information / specification
| 109851 | |
|---|---|
107835
landscape package for further information New 1:18 access ramp for deliveres into dining hall New powder coated steel balustrade and timber handrail - RAL colour 7016, refer to landscape package for further information New powder coated steel balustrade and timber 01 - First Floor New powder coated steel balustrade and timber handrail - RAL colour 7016, refer to landscape package for further information New powder coated steel balustrade and timber GF - Ground Floor
Not to scale
Colbourne - West Elevation - Proposed
title:
project no:
@A1
@A1

The new canopy, providing sheltered external play to the internal courtyard in Colbourne, is to be constructed with a painted steel frame and poly-carbonate roof sheeting. The frame is to be painted blue to align with the Buchan School colour. This design intent is to match that of the canopy proposed as part of the linked planning application No. 24/90923/B.
New external metal ventilation grilles are to be of a louvred style, polyester powder coated in dark grey. Again, these are to match that proposed to Jackson House and the Stenning Building, as part of the linked application.
Due to the level difference on the North and West areas of the site, a timber effect composite clad decking is to be installed to the Northeastern corner of the building. This will wrap around and link the two main early years classrooms to the main entrance / drop off point on the West elevation. It will include a powder coated steel balustrade and timber handrail. The fascias will also be cladded in the same material, to prevent any children from accessing underneath.
The Buchan School site is to be secured on the western boarder with a new perimeter fence, 2.4m in height. The fence is formed of steel posts with welded mesh panels. All to be polyester powder coated.
Any proposed / replacement doors and windows are to colour match existing provision. Further information on materials, specific to the landscape, can be found within the landscape design section of this report. Existing timber decking to be replaced as part of works Design intent and colour scheme for proposed canopy Example of proposed timber effect composite decking
External Space and Landscape Iteriad have been appointed to provide Landscape Architectural services for King William’s College and the Buchan School for the redevelopment of grounds associated with the Colbourne building to allow the Buchan School to relocate their early years provision from their current site within Castletown to the main King William’s College site. This element of works continues on from the recent application to redevelop the wider Jackson and Stenning buildings and landscape (reference 24/90953/B).
The external environment will be key to the success of the re purposing of the Colbourne building to accommodate early years provision.
The Colbourne building will require segregation from the wider college to provide a secure and safe environment but also to help define ownership and identity. The spaces to Colbourne will work in line with the other proposed spaces between and around the buildings as part of application 24/90953/B, which are key in providing a cohesive and unified identity for the school, while also enhancing the base functionality of the site.
The landscape and external spaces have the ability to elevate the existing buildings and provide an inviting and energetic learning environment for the pupils.
The external environment has been developed to provide new access routes for dining, early years, an enhanced composite deck to the eastern edge of Colbourne, a resurfaced and upgraded courtyard for early years play / learning and a soft, habitat-rich space to the east of the site.
The value of landscape place making is the creation of sustainable, functional, ecologically beneficial designs for the external environment that enhance the spirit of the place and the experience of the user.

The plan and legend on this page represent the current landscape masterplan for the proposed Colbourne site. This masterplan includes contextual information from the wider Buchan School at King William's College scheme (application reference 24/90953/B).
Site map not to scale

The landscape and external works for the Colbourne building re-purposing are split into four main sections; the new access, composite deck and soft landscaped recreational area to the east of the site, the refurbished and enhanced courtyard space to the centre of the Colbourne building, the new access point in the western elevation for all students (exception of early years) to use to access dining, and the service access route in the southern elevation to be used by staff to access the dining area.
The area to the east of the proposed site is currently a soft, predominantly lawned space with mature existing trees. It is currently underutilised due to the lack of access from the main school building.
From the eastern fence line, the proposal brings a new gated access and footpath to the Colbourne building for early years use. This route will be surfaced in permeable, flexible resin bound surfacing to the east and a composite decked 1:21 slope toward the building. This will ensure accessibility for all to the new early years facility. The composite decking material will wrap around the eastern and northern elevations of Colbourne creating an essential access route at the level of the internal finished floor.
The courtyard will be for the use of early years only, and will be resurfaced in asphalt, a new canopy will be installed to provide sheltered external space and the existing stone raised planter will be covered in the composite decking material to ensure suitability for the younger students.
The new western access will consist of a 1:21 slope within a retaining structure to provide accessible entry to the Colbourne building dining provision from other areas of the school grounds. Balustrade provision will be incorporated to ensure protection for users.
The southern access route will provide ramped access to the new Colbourne dining facility for staff. This area has been designed to allow trolley access as required with integrated balustrade / handrail.
Site map not to scale








The hard landscape materials will be selected to provide a functional, attractive and long term solution to the site which will enable fully accessible use of the building, while enhancing the sense of place.
The hard landscape materials will be selected to provide a functional, attractive and long term solution to the site which will enable fully accessible use of the building, while enhancing the sense of place.
The surfacing will allow flush access routes into the building entrances and upstand edges to main routes will provide guidance and delineation to direct users to the entrances.
The surfacing will allow flush access routes into the building entrances and upstand edges to main routes will provide guidance and delineation to direct users to the entrances.
A variety of surface materials will be incorporated into the scheme to give interest, variation and identity to the different spatial uses.
A variety of surface materials will be incorporated into the scheme to give interest, variation and identity to the different spatial uses.
An important part of the development of the landscape design is ensuring that the external spaces meet expectations on handover, and also into the future as the landscape matures and develops. It is essential that the maintenance requirements of the design align with the capabilities of the College / School, to ensure that the scheme can maintain the aesthetic and function agreed between the design team and Client.
An important part of the development of the landscape design is ensuring that the external spaces meet expectations on handover, and also into the future as the landscape matures and develops. It is essential that the maintenance requirements of the design align with the capabilities of the College / School, to ensure that the scheme can
Hard landscape materiality and planting specifications will be made to allow the design to mature into an established landscape which will be maintainable by the College / School with the appropriate amount of attention.
and Client. Hard landscape materiality and planting specifications will be made to allow the design to mature into an established landscape which will


The areas of soft landscape are critical to the development of character within the site, to create texture, enclosure, sensory experience and visual stimulation. These areas also give the opportunity to enhance the ecological value of the site, increasing biodiversity levels which will benefit the environment and native wildlife species while also providing an important educational opportunity.
The areas of soft landscape are critical to the development of character within the site, to create texture, enclosure, sensory experience and visual stimulation. These areas also give the opportunity to enhance the ecological value of the site, increasing biodiversity levels which will benefit the environment and native wildlife species while also providing an important educational opportunity.
Planting species are being developed with input from the local ecologist / plant specialist to ensure the external scheme fulfils it’s ecological potential.
Planting species are being developed with input from the local ecologist / plant specialist to ensure the external scheme fulfils it’s ecological potential.
The introduction of habitat creation elements within the scheme is a cost effective and extremely valuable way of enhancing the biodiversity of the site, providing nesting and foraging habitat for birds, invertebrates and small mammals.
The introduction of habitat creation elements within the scheme is a cost effective and extremely valuable way of enhancing the biodiversity of the site, providing nesting and foraging habitat for birds, invertebrates and small mammals.
Log piles, shallow pools and bird and bat boxes can be installed with relative ease and create an opportunity for the children to watch, appreciate and monitor wildlife species.
Log piles, shallow pools and bird and bat boxes can be installed with relative ease and create an opportunity for the children to watch, appreciate and monitor wildlife species.
Upland House Spring Lane Samlesbury PR5 0UX 01772 877 455 [email protected]
12 Albemarle Way Clerkenwell London EC1V 4JB 020 7637 1501 [email protected]
www.wilsonmason.co.uk