Loading document...
==== PAGE 1 ====
Ground floor Plan - 1-100 Rear elevation - 1-100 (Restricted access for survey) Side (Lane) elevation - 1-100 Front elevation - 1-100 ALL DIMENSIONS ON THIS DRAWING ARE STRUCTURAL DIMENSIONS UNLESS OTHERWISE STATED. ALL DIMENSIONS AND LEVELS TO BE CONFIRMED ON SITE PRIOR TO THE COMMENCEMENT OF WORKS. ANY DISCREPANCIES TO BE REPORTED TO THE DESIGNER. First floor Plan - 1-100 Typical section - 1-100 Application site Lane Application site Lane Adjacent property Lane Application site Adjacent property Adjacent property New Windows to gable New Window to gable New doors with "juliet" style glass guarding New roof-lights over living space New staircase to upper level apartment New doors with "juliet" style glass guarding New external doors to access passage Note - Refuse provision to be a 240 ltr bin unit for the apartment New Kitchen area to final layout / design. Kitchen to include a 3 compartment bin for recycling New roof-lights Roof to have dark concrete interlocking roof tiles. Existing window removed Windows reduced in size and to have a raised cill,to be fitted with obscured glazing Existing floor levels adjusted to suit refurbished property Existing slavaged king post trusses utilized in "loft" apartment Materials Roof - Concrete interlocking tiles Redland 90 - Charcoal Black Windows uPVC double glazed. fitted with & Doors obscured glazing as noted on elevations External walls Masonry construction with K-rend or similar Through coloured render - White Front / Lane elevation to be faced in selected facing brick Ibstock Ashdown Bexhill Red RW goods. Galvanized finish "industrial" style gutters and down-pipes. Floor levels adjusted from that of the existing to improved living spaces in replacement building New through coloured render (K Rend or similar), white finish. New door and side window to entrance to apartment New through coloured render (K Rend or similar), white finish. Dark coloured concrete tile roof. Access to rear of property adjacent to be maintained and protected during the works. New through coloured render (K Rend or similar), white finish. Feature face brickwork returned around gable New external walls of masonry construction with render finish Sectional garage door Sectional garage door Feature "king post" trusses, (existing truss reclaimed and re-used) New drainage connection to existing FW drain. Exact position to be agreed on site Re-cycling storage area Ground floor Plan - 1-100 showing vehicle access (above) and visibility (below) Solar panels to roof - exact extent and position to be confirmed. New roof-lights over Bathroom and bedroom Solar panels to roof - exact extent and position to be confirmed. Solar panels to roof - exact extent and position to be confirmed. Visibility shown in green - via high level mirrors fitted and maintained by applicant. Visibility shown in green - via high level mirrors fitted and maintained by applicant.
Copyright in submitted documents remains with their authors. Request removal