==== PAGE 1 ====
Client
Outdoor Power & Plant
Drawing Information
Purpose of Issue
Erection of replacement workshop
building,
Unit 36, Snugborough Trading Estate,
Braddan, IM4 4LH
Drawing Title
Contract
PLANNING DRAWING
PLANNING
02
Drawn by
Drawing number
Rev
Scales @ A1
.
Date
23 West Quay
Ramsey
Isle of Man
IM8 1DL
Tel: 01624 813219 / 814178
Fax: 01624 816436
[email protected]
www.penkethmillar.co.uk
General notes
- This document and its design content is the
copyright © property of Penketh Millar Ltd. and may
not be reproduced in any way without the permission
of Penketh Millar Ltd. It shall be read in conjunction
with all other associated project information including
models, specifications, schedules and related
consultants documents.
- Do not scale from documents, written dimensions to
take preference at all times.
- All dimensions & levels to be checked on site prior to
construction or fabrication of any elements.
Immediately report any discrepancies, errors or
omissions on this document to this office. If in doubt
ASK.
- All structural timbers to be tanalised or similar
approved treatment.
- All Dimensions in this document are structural
dimensions and do not allow for thickness of finishes.
23 1759
JW
1:100
SEPT
2023
100
100
100
100
100
100
99
98
97
96
100
99
98
97
96
100
100.00
9001
107.26
9101
108.97
9102
109.01
9103
105.89
9104
107.74
9105
105.99
Eaves
106.50
Eaves
105.54
105.52
Ftop
103.15
HTop
102.45
WTop
RWP
YG
RWP
YG
100.01
9003
100.14
100.09
100.09
100.12
100.11
100.09
100.14
100.05
100.01
100.02
99.99
99.99
99.95
99.96
99.97
99.98
100.04
100.07
100.07
100.00
99.95
99.96
Post
100.10
100.07
Post
100.02
Post
100.24
100.05
99.99
Post
Post
100.03
99.98
D
100.12
100.00
99.98
100.03
100.06
100.01
FH
100.06
100.04
100.03
100.16
100.13
100.00
99.97
SV
SV
99.96
99.99
100.01
100.05
9002
100.03
100.03
100.05
100.05
100.05
100.03
100.02
100.00
99.96
100.09
100.09
100.08
100.06
100.02
99.96
99.95
100.03
100.11
100.06
Post
100.06
Post
103.24
WTop
103.21
WTop
101.74
9005
100.02
99.96
100.02
100.02
100.01
99.99
100.06
100.03
100.04
99.98
100.04
100.09
100.07
100.08
100.09
100.06
100.11
100.10
100.13
100.09
100.08
100.12
100.08
100.14
100.12
RWP
YG
100.06
99.95 Oil
SVP
RWP
104.56
Eaves
104.60
Head
102.11
Head
102.19
Head
102.21
Head
101.23
Sill
100.07
Conc
100.07
101.72
9006
RE
100.04
100.07
100.07
100.04
100.05
100.07
100.08
9004
100.05
100.05
100.00
100.12
SVP
100.11
99.99
100.03
100.04
100.04
100.06
100.08
100.08
100.10
99.90
99.17
100.04
99.79
98.96
99.89
99.82
98.87
99.96
99.75
100.03
100.07
100.08
100.07
103.36
Eaves
103.36
Eaves
100.12
9008
99.91
100.01
100.11
100.11
99.85
99.77
98.18
Post
99.96
Post
100.01
95.59
95.52
95.49
102.18
Head
99.95
GU
100.03
MH
100.00
MH
99.95
GU
100.03
MH
100.04
MH
Generator
100.07
IC
100.05
IC
99.97
GU
99.96
100.08
100.08
100.08
100.14
DSill
100.13
DSill
100.06
100.23
DSill
100.17
DStep
Slabs
100.03
MH
Stone
Stone
Stone
Conc
Slabs
Conc
Slabs
Conc
Slabs
Conc
Slabs
Conc
Slabs
C /link
Hedge
Scrub
Scrub
Scrub
Scrub
100.02
IC
Conc
Slabs
Conc
Slabs
107.26
Eaves
108.97
Eaves
107.74
Ridge
109.01
Ridge
105.89
Ridge
Scale = 1 : 100
10.0
15.0
20.0
5.0
2.0
0.0
Unit 37
Unit 36
19766
18551
EXISTING UNIT TO BE
DEMOLISHED
SHOWN DOTTED
Ground Floor Plan
1:100
Rev:
Area of
Secure
Storage unit
and mixing
area
Washing
Out Area
Sand bags to be
located here.
Sand bags to be
located here.