==== PAGE 1 ====
Ex,g Plinth
Ex,g Plinth
Ex,g Plinth
Ex,g Slab
Ex,g Slab
New slab
Hardcore
New slab
Hardcore
Top of existing slab
Top of existing slab
Alter
Kitchen/Vestry
Church
Lobby
Alter
Organ
- 23.00
- Ex FFL 23.17
- Ex FFL 23.15
Ex FFL 22.99 +
Ex 23.08 +
Ex 23.09 +
Ex 23.17 +
(Ex 23.00) +
(Ex FFL 23.02) +
Ramp up
- 23.15
23.00 +
- FFL 23.00
Ramp up
- FFL 23.15
FFL 23.00 +
Ex FFL 23.00 +
Ex 23.09 +
- New concrete slab 23.00
Concrete Pour 1
Concrete Pour 2
Longitudinal Day Joint (see detail)
Perimeter Isolation Joint
Perimeter Isolation Joint
Perimeter Isolation Joint
Perimeter Isolation Joint
The builder must determine that no services are
located in the area of the excavations.
The areas of work must be scanned using a
buried services detector.
If services are detected then the location must
be marked and the investigation relocated to an
area with no services.
Prior to commencement of any excavation of the
existing floor slab the contractor must carry out
sufficient trial excavations to ensure the existing
stonework wall is founded deeper than any
proposed internal excavation.
Proof of this site check MUST be provided to the
engineer and client.
No work is to proceed until the engineer and or
client has achnowledged the investigation results
are satisfactory.
Concrete Slab
Blinded Hardcore
Pour 1
Pour 2
Amendments
Client
Date
Ref
Revision description
By
Project
Drawing
Scale:
Drawn:
Date:
Job No.
Drawing No.
Rev.
Structural Engineering Services Ltd
The Old Coastguard Station,
Queens Promenade,
Ramsey,
Isle of Man,
IM8 1BH.
Tel: 01624 819300 email: [email protected]
0
Discussion
Jan 23
MS
Building Regulations
Sulby Methodist Church
Sulby, Isle of Man
Proposed Floor Levelling
Sulby Methodist Church
Sulby, Isle of Man.
Assement of Floor Levelling
1:50 & 1:20
January 2023
1844
100
D
Plot @A1
MS
A
Investigation notes added
Mar 23
MS
B
Structural information added
Jan 24
MS
C
Typo on sections corrected
May 24
MS
D
Existing wall base note added
May 24
MS