Loading document...
==== PAGE 1 ====
Building Regulations: Proposed Floor Plan March 2023 ss vs 1:50 1815/12D Proposed Internal Works to: Sulby Methodist Church Main Rd, Sulby IM7 2HR Proposed Ground Floor Plan 1:50 Kitchen Store Disabled WC & baby change WC up up up up up Pulpit Organ Lobby Store Prayer Area Worship Multi-use Space Carpet finish to Worship Area ramp ramp Red quarry tiles laid in herringbone pattern to lobby to be retained Power & network to be run round the perimeter of the space in skriting duct work New double sockets to be recessed into existing dado panelling at approx 1000 above ffl - below dado rail Organ to remain in place. Church to arrange protective covering to be in place prior to works commencing on site. Supply pipework serving underfloor heating manifolds to be run in screed around perimeter of heating field truss truss truss Existing pews to be repurposed to create new seating to the prayer area New insulated flat floor throughout the main hall with underfloor heating to create a multi-use space v vent TV monitors TV monitors TV monitors TV monitors Recessed floor box - Recessed floor box - Recessed floor box - Recessed floor box - double sockets double sockets double sockets double sockets TV TV TV TV Fused spur Fused spur Fused spur Fused spur Manual call point Manual call point Manual call point Manual call point Fire blanket Fire blanket Fire blanket Fire blanket Recessed downlight Recessed downlight Recessed downlight Recessed downlight Recessed downlight with Recessed downlight with Recessed downlight with Recessed downlight with emergency back up emergency back up emergency back up emergency back up Emergency light fitting Emergency light fitting Emergency light fitting Emergency light fitting Double socket Double socket Double socket Double socket Double socket with USB port Double socket with USB port Double socket with USB port Double socket with USB port Illuminated fire escape sign Illuminated fire escape sign Illuminated fire escape sign Illuminated fire escape sign Power & network Power & network Power & network Power & network Underfloor heating supply pipes Underfloor heating supply pipes Underfloor heating supply pipes Underfloor heating supply pipes Radiant panels Radiant panels Radiant panels Radiant panels Lighting bar Lighting bar Lighting bar Lighting bar 50 Watt high level LED flood lights 50 Watt high level LED flood lights 50 Watt high level LED flood lights 50 Watt high level LED flood lights Paired directional spotlights either Paired directional spotlights either Paired directional spotlights either Paired directional spotlights either side of trusses to illuminate timber side of trusses to illuminate timber side of trusses to illuminate timber side of trusses to illuminate timber 30 watt LED to illuminate ceiling 30 watt LED to illuminate ceiling 30 watt LED to illuminate ceiling 30 watt LED to illuminate ceiling Lighting switch panel Lighting switch panel Lighting switch panel Lighting switch panel 10 watt LED reflector to illuminate 10 watt LED reflector to illuminate 10 watt LED reflector to illuminate 10 watt LED reflector to illuminate windows - locally switched windows - locally switched windows - locally switched windows - locally switched Light switch Light switch Light switch Light switch 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 1500mm LED waterproof light 1500mm LED waterproof light 1500mm LED waterproof light 1500mm LED waterproof light fitting fitting fitting fitting FE FE FE FE 2 No. ASHP Condensor units 1020 x 417 No fixing to be made to the building. Plinth to organ to be retained Hot water cylinder serving ASHP Manifold Manifold Manifolds for underfloor heating to be housed in new timber framed cupboards designed to match existing dado panelling (see drwg:1815/13 Manifold cupboard details) Manifold Manifold 1 2 3 4 6KW ceiling mounted fan heater over door dish washer hob & oven combi micro fridge freezer hand wash Underfloor heating to be zoned into four areas truss truss Power & network to run in floor ducts at door thresholds floor duct floor duct floor duct floor duct Supply pipework serving underfloor heating manifolds to be run at high level from the tank Pipework at high level Supply pipework serving underfloor heating to drop from high level to low in chased duct & pass through existing wall at low level. Supply pipework serving underfloor heating manifolds, power & network to be run in skirtng duct in area where existing organ plinth is retained Power & data at high level for TVs Preachers screen to be provided by client Network cabinet TV TV TV TV E E E E E E E Pipework running from condenser units to water tank to run in cellar RP RP RP RP D1 D2 D3 D4 D6 D5 D7 D8 L1 D10 D11 D12 D9 L2 Building to be rewired throughout & electrical distribution board renewed F.E. F.E. F.E. F.E. F.E. F.E. High level suspended radiant panels Existing screen to be omitted & replaced with 2 No. TVs 900mm high timber handrail to ramp RP Existing WC & WHB retained & cubicle decorated. Extract vent set into window v vent Extract vent set into window (60 ltrs/sec) Re-circulation hood to hob New kitchen (domestic grade) design - client item 6KW ceiling mounted fan heater over door IP rated 22.76 22.72 22.86 Existing I.C. New I.C. Existing I.C. USB USB USB USB USB USB USB USB USB USB USB USB USB USB USB USB 22.67 22.66 22.52 22.59 22.62 22.61 23.00 23.00 23.17 23.15 23.15 23.15 23.15 23.15 23.15 23.15 23.15 23.00 23.00 Floor build up: 75mm screed on 75mm Kingspan insulation on existing level floor Floor build up: Existing raked floor and concrete plinths to be removed & excavated to provide base for new flat floor construction E E E E E HD SD Smoke (SD) /heat (HD) detection Smoke (SD) /heat (HD) detection Smoke (SD) /heat (HD) detection Smoke (SD) /heat (HD) detection USB HD SD At top of staircase Ramped access Fire extinguisher Fire extinguisher Fire extinguisher Fire extinguisher F L O O R T Y P E A F L O O R T Y P E B Cleaner Lighting bar Lighting bar Rev A 19.05.23 Additional lighting shown in main space - light bar, uplights & existing floodlights changed to LED LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight LED floodlight Floodlights to be operated from lobby & pulpit lighting control panels - 2 way switch 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight with PIR 10 watt floodlight 10 watt floodlight 10 watt floodlight 10 watt floodlight with PIR with PIR with PIR with PIR Rev B 22.05.23 Further lighting shown in main space - LED to light roof, reflector units to windows & external PIR floodlights. All as per client design Feb 2023. LED floodlight to illuminate window to illuminate ceiling Rev C: Oct 23 Location of proposed ASHPs shown Rev D: Nov 23 Paired uplighters (illuminating trusses) omitted. Additional sockets for front of house lights & TVs. Screen omitted & replaced with 2No. TVs High level socket Power & data for TV monitor TV TV Power & data at high level for TVs Existing screen to be omitted & replaced with 2 No. TVs
Copyright in submitted documents remains with their authors. Request removal