Loading document...
==== PAGE 1 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 McGarrigle Architects Ltd 19 Mount Havelock Douglas Isle Of Man IM1 2QG TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Registered Buildings) Regulations 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Hesketh Investments Limited, Ref 24/00570/CON, for the Registered Building Consent for demolition elements to PA 24/00569/B at The Former Empire Garage Showroom Marine Parade Peel, IM5 1PA . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The works hereby granted registered building consent shall be begun before the expiration of four years from the date of this consent. Reason: To comply with paragraph 2(2)(a) of schedule 3 of the Town and Country Planning Act 1999 and to avoid the accumulation of unimplemented registered building consents. 2. Development shall not commence, including any demolition works, until a programme of historic building recording of the existing buildings and structures on the site, together with the present site arrangement including the configuration of Gib Lane, has been undertaken and submitted to the Department for approval in writing. The programme of historic building recording must be undertaken in accordance with Level Two as set out in Understanding Historic Buildings: A guide to good recording practice. Reason: To ensure and safeguard the recording and inspection of matters of historical importance that will be lost in the course of works. 3. No development shall commence, including any demolition works, until sample details of wall cladding, roof finishes, windows and external doors have been submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details and be retained thereafter.
==== PAGE 2 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Reason: In the interests of preserving the character and appearance of the Conservation Area and surrounding area. 4. No development shall commence, including any demolition works, until panels of the facing stonework, including any copings or movement joints, have been erected on site (or an alternative location) and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details and be retained thereafter. Reason: In the interests of preserving the character and appearance of the Conservation Area and surrounding area. 5. Works of demolition shall not be carried out until a contract that allows for the carrying out of works of redevelopment has been made and planning permission has been granted for the redevelopment for which the contract provides. Reason: In order to prevent a gap site/sites in the Conservation Area, which would harm its character and appearance. This approval relates to the following drawings and documents referenced; Bat Emergence Survey Received 02.10.24 P03 Rev A - Proposed Marine Parade streetscene elevations Received 27.08.24 P04 Rev B - Proposed Street Elevations Received 24.08.24 ITB19672-SK-003 Rev A - Access Arrangement Comparison Plan ITB19672-GA-001 Rev K - Proposed Access Arrangement P01 Rev B - Proposed Site Plan P07 Rev A - Proposed Image View East Received 23.08.24 P02 Rev A - Proposed Plans and Elevations P05 RevA - Proposed Site Drainage Plan Received 05.08.24 EX01 - Location Plan EX02 - Existing Site Layout EX03 - Existing Street Elevations P06 P08 P09 P10 P11 - Proposed Site Images Design Statement Structural Appraisal Transport Statement Received 23.05.24 This decision has been made for the following reasons(s)
==== PAGE 3 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 The proposed development is considered to amount to a highly efficient reuse of a brownfield site within an urban area, whilst being of an appropriate layout, scale and density to ensure that the general character and appearance of the wider Conservation Area would be preserved. The proposals would provide a high standard of living for future occupants, without resulting in a detrimental impact upon the amenities of surrounding residential properties. The development would further provide sufficient off-street parking provision and give rise to improved highway safety following alterations to Gib Lane. The proposals are therefore in compliance with Strategic Policies 4 and 5, General Policy 2 and Environment Policies 35, 42 of the Strategic Plan (2016). Date of Issue: 29th October 2024 J CHANCE Director of Planning and Building Control
==== PAGE 4 ====
Department of Environment, Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either Any appeal has been concluded; or 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: the grounds for making the appeal; payment of the planning appeal fee (currently £355); and if relevant, confirmation that the appellant wishes to have the appeal determined by means of an inquiry and payment of the additional inquiry fee (currently £130). Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application (should one have been received) may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal