Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Highway Services Mr A McCusker Department Of Infrastructure Sea Terminal Building Douglas IM1 2RF TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to REFUSE an application by Department Of Infrastructure, Ref 19/00755/B, for the Construction of 500m long reinforced concrete wall 1.2m in height anchored to the existing sea wall to reduce wave overtopping at Sea Wall Harris Promenade Douglas Isle Of Man for the following reason(s): 1. The Planning Committee is not satisfied that the permanent and detrimental impact on the character and appearance of the Conservation Area and on the public view of the sea (both contrary to Environment Policy 35 and Planning Policy Statement CA/2 and General Policy 2.e) are outweighed by the benefit of the proposed wall in relation to reducing the risk of flooding, noting that the level of protection which would be afforded by the wall is lower than that recommended in the applicant's technical report and that the risk relates to intermittent events at certain times of the year. Date of Issue: 11th October 2019 Director of Planning and Building Control
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it. This decision refers only to that applied for under the The Town and Country Planning (Development Procedure)(No 2) Order 2013. Whilst a copy of the Officer’s report is included alongside this notice, any wider correspondence which led to the assessment and decision is now available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas. https://www.gov.im/planningapplication/services/planning/search.iom Any appeal against this decision must be in accordance with the criteria set down in that instrument. Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain: · Payment of a planning appeal fee as prescribed in the current Fees Order; · The reasons for making the appeal; and · An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation. An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planning- applications/planning-appeals/how-to-appeal/ If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal