Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 McGarrigle Architects Ltd 19 Mount Havelock Douglas Isle Of Man IM1 2QG TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Ardlui Limited, Ref 18/00284/B, for the Alterations and roof extension to provide one retail unit (Class 1), four offices (Class 4) and one residential apartment at Auldyn House 24 Parliament Street / West Quay Ramsey Isle Of Man IM8 1AP subject to compliance with the following condition(s) and notes (if any): 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals. 2. The render to the external walls of the gable ends of the two terraces hereby approved are required to be painted a colour to match that of the existing gable ends of the two terraces which are in already place, and shall be permanently retained as such thereafter. Reason: In the interests of the character and appearance of the area. 3. The window/door frames to the French doors serving the two roof terraces hereby approved shall be finished in a dark grey colour to match the slate roof, and shall be permanently retained as such thereafter. Reason: In the interest in the character and appearance of the area. 4. No development shall commence until a bat survey has been submitted to and approved in writing by the Department. The bat survey shall identify impacts on bat species together with mitigation, where appropriate, including a timetable for its implementation. The development shall not be carried out unless in accordance with the approved details. Reason: To provide adequate safeguards for the bats. 5. No development shall commence until a sample of all roofing materials to be used has been provided on site and approved in writing by the Department. The approved sample(s) shall be kept on site for reference until the development is completed. The development shall not be carried out unless in accordance with the approved details.
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Reason: In the interests of the character and appearance of the site and surrounding area. This approval relates to the submitted documents and drawings reference numbers P01, P02 D, P03C and EX01 A received on 16th March 2018 and 26th February 2019. Date of Issue: 1st May 2019 Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it. All correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas. https://www.gov.im/planningapplication/services/planning/search.iom This decision refers only to that applied for under the The Town and Country Planning (Development Procedure)(No 2) Order 2013. Any appeal against this decision must be in accordance with the criteria set down in that instrument. Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain: · Payment of a planning appeal fee as prescribed in the current Fees Order; · The reasons for making the appeal; and · An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation. An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planning- applications/planning-appeals/how-to-appeal/ If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal