23 April 2019 · Delegated - Principal Planner Sarah Corlett
7, Erin Way, Port Erin, Isle Of Man, IM9 6ef
The site is a mid-20th century bungalow in a residential street in Port Erin, near the railway line. The proposal involves demolishing the existing flat-roof front porch and replacing it with a larger solid hipped-roof porch (3m wide x 2.2m deep, 3.75m ridge height) using white render, uPVC, and matching tiles; re-roof…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer noted the new front porch, though substantially larger than the existing flat-roof sun room porch (3000mm wide x 2200mm deep vs previous 2250mm x 1600mm), would be centrally located, set b…
General Policy 2
GP2 permits development in line with Area Plan zoning if it respects site surroundings in siting/layout/scale/design (b), does not adversely affect townscape character (c), and does not harm local residents' amenity or locality character (g). The officer tested the porch replacement and rear re-roofing against these, finding visual improvements from tiled hipped design matching the bungalow, no amenity harm due to setback location and unchanged rear scale, and overall enhancement to the dwelling's appearance in its residential street context.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
Materials approval
All external alterations and finishes to the building shall be in accordance with those indicated in the approved drawing JTM1901-P-04. All work of making good shall be finished to match exactly the existing building fabric in respect of type, size, colour, bond, pointing, coursing, jointing, profile and texture. Reason: In the interests of maintaining and enhancing the character and appearance of the site.
resolved to support in their meeting of 9th April 2019
Port Erin Commissioners initially acknowledged the application for discussion and later resolved to support it after their board meeting.
Port Erin Commissioners
No CommentThe planning application PA 19/00193/B will be discussed by the Board of Port Erin Commissioners at the meeting on 9th April 2019.; We will inform you of the outcome once a decision has been reached.
Port Erin Commissioners
SupportPort Erin Commissioners have considered the above application at its meeting on 9th April 2019 and they have resolved to support the application.