Application No.: 18/00685/CON Applicant: Queen's Pier Restoration Trust Proposal: Registered building consent for structural works to the underside of the pier, and various restoration works to the entrance/gatehouse - RB 154 (in connection with application 18/00684/GB) Site Address: Queens Pier Stanley Mount East Ramsey Isle of Man IM8 1NP Principal Planner: Mr Chris Balmer Expected Decision Level: Officer Delegation Recommended Decision: Permitted Date of Recommendation: 05.09.2018 _________________________________________________________________
C : Conditions for approval N : Notes attached to conditions C 1. The works hereby granted registered building consent shall be begun before the expiration of four years from the date of this consent.
Reason: To comply with paragraph 2(2)(a) of schedule 3 of the Town and Country Planning Act 1999 and to avoid the accumulation of unimplemented registered building consents.
This approval relates to the submitted documents and drawings reference numbers 021, 11 and 007 all received on 29th June 2018. _______________________________________________________________ Interested Person Status – Additional Persons None _____________________________________________________________________________
1.0 THE APPLICATION SITE - 1.1 The application site comprises Queen's Pier, Ramsey, an iron Victorian pier, Registered Building RB 154, located on the foreshore off the Queen's Promenade in Ramsey.
1.2 The pier was added to the Protected Buildings Register on the 16th of February 1995 by reason of its special architectural and historic interest. - 1.3 The Ramsey pier is the Island's only remaining Victorian pier following the demolition of the pier in Douglas which opened in 1869 and was lost in 1894. The pier is 2244ft (684m) in length and opened in 1886.
2.0 THE PROPOSAL - 2.1 This application seeks planning permission for Registered building consent for structural works to the underside of the pier, and various restoration works to the entrance/gatehouse RB 154 (in connection with application 18/00684/GB). - 2.2 The works include:
3.0 PLANNING HISTORY - 3.1 The application site has previously been the subject of a number of Planning and Registered Building consent applications, but the following is considered particularly pertinent in the consideration of this application:
17/00336/CON - Registered Building Consent for refurbishment and repair of first three bays of pier including widening of first bay and installation of toilet facilities within entrance building
17/00335/GB - Refurbishment and repair of first three bays of pier including widening of first bay and installation of toilet facilities within entrance building (in connection with registered building application 17/00336/CON) - Application Approved.
10/01578/GB - Stabilisation and protection scheme to pier (in association with 10/01579/CON)
02/02102/GB - Registered Building Consent for internal alterations and erection of external notice boards (in association with 09/00726/D) Registered Building No. 154 Queen's Pier, Queen's Promenade, Ramsey - Application withdrawn.
4.0 PLANNING POLICY - 4.1 The site lies within an area designated on the 1998 Ramsey Local Plan Map No.2 (South) as 'Predominantly Residential'. - 4.2 As the Queen's Pier is a Registered Building (RB 154) and the application seeks approval for a stabilisation and protection scheme to pier, the Isle of Man Strategic Plan 2016 contains four policies that are considered specifically relevant to the assessment of this Registered Building Consent application: - 4.3 Strategic Policy 4 states: "Proposals for development must:
4.4 General Policy 2 states: "Development which is in accordance with the land use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development:
4.5 Environment Policy 32 states: "Extensions or alterations to a Registered Building which would affect detrimentally its character as a building of special architectural or historic interest will not be permitted." - 4.6 Environment Policy 34 states: "In the maintenance, alteration or extension of pre-1920 buildings, the use of traditional materials will be preferred."
Planning Policy Statement 1/01 - Policy and Guidance Notes for the Conservation of the Historic Environment of the Isle of Man sets down the policies in relation to the conservation of the built environment of the Isle of Man, including policy for the identification and protection of historic buildings, conservation areas and other elements of the environment. This policy statement contains two policies that are considered specifically material to the assessment of this planning application:
4.7 Policy RB/3: GENERAL CRITERIA APPLIED IN CONSIDERING REGISTERED BUILDING APPLICATIONS; "The issues that are generally relevant to the consideration of all registered building applications are:-
4.8 RB/5: Alterations and Extensions states: "In considering whether to grant planning approval for development which affects a registered building or its setting and in considering whether to grant registered building consent for any works, the Department shall have special regard to the desirability of preserving the building or its setting or any features of special architectural or historic interest which it possesses.
Registered Building consent is required for the building's alteration in any way which would affect its special architectural or historic character. There will be a general presumption against alteration or extension of registered buildings, except where a convincing case can be made, against the criteria set out in this section, for such proposals.
Applicants for registered building consent for alteration or extension to a registered building must be able to justify their proposals. They will be required to show why the works which would affect the character of the registered building are desirable or necessary and they should provide full information to enable the Department to assess the likely impact of their proposals on the special architectural or historic interest of the building and on its setting. Where registered buildings are the subject of successive applications for alteration or extension, consideration will also be given to the cumulative effect upon the building's special interest as a result of several minor works which may individually seem of little consequence."
5.0 REPRESENTATIONS 5.1 No representations received.
6.0 ASSESSMENT - 6.1 The application seeks planning permission for a stabilisation and protection scheme to pier. - 6.2 The key issue in the consideration of this application is whether the proposals 'would affect detrimentally its character as a building of special architectural or historic interest will not be permitted.' - 6.3 The works to the pier itself are rather modest, being structural support beams to either side of the pier extension. These will not be prominent features and only noticeable when walking along the beach below. - 6.4 The reminder of the works centre around the existing gatehouse/entrance and the portacabin to the front hardstanding area. Overall these works are considered to be a betterment of the building/site and raise no concerns. Furthermore the works of the nature here proposed, are vital for any chance of the pier coming back into public use and are to be welcomed. - 6.5 The Registered Building Officers has visited the site and considered the scheme and has no concerns. - 6.6 In conclusion, this application which seeks planning permission for a stabilisation and protection scheme to the pier is thereby considered to comply with part (a) of Strategic Policy
7.0 RECOMMENDATION: - 7.1 For the above reasons the application is considered to be acceptable and is recommended for approval.
8.0 INTERESTED PERSON STATUS - 8.1 By virtue of the Town and Country Planning (Registered Buildings) Regulations 2013, the following are automatically interested persons:
I can confirm that this decision has been made by the Head of Development Management in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation.
Decision Made : Permitted Date : 05.09.2018 Determining officer
Signed : S BUTLER Stephen Butler Head of Development Management