==== PAGE 1 ====
1 Spencer, Daniel From: Costain, Sophie (DEFA) Sent: 05 September 2023 14:16 To: [email protected] Cc: Spencer, Daniel; DEFA, Planning Subject: RE: Bridge House Mitigation Method Statement Attachments: Bridge House - Mitigation Plan.pdf Follow Up Flag: Follow up Flag Status: Completed Hi Ram
How strange, I was just emailing you, when this email came in.
Copied into this reply is the General Planning inbox and Daniel Spencer from Planning who deals with the satisfaction of Planning conditions (I’m not actually sure who is best to send this to).
Daniel, this method statement is being submitted in order to satisfy Condition 2 of PA 22/00314/B (Erection of a 2 storey extension etc. Bridge House, West Baldwin), for a bat mitigation plan.
I know this is not the usual way of doing it, but I’m away from the office from tomorrow until the 28th September, so won’t be able to respond re satisfaction of conditions during this period. So I’m hoping that you can take this email as confirmation that the Ecosystem Policy Team are content with the attached Manx Bat Group Method Statement for Bat Mitigation for Bridge House, and that we consider Condition 2 satisfied.
Ram please be aware that you must obtain a Statutory Written Method Statement from my team prior to starting the works (basically this statement will just say that you need to follow the methodology contained in the Manx Bat Groups mitigation plan) and that as per the attached plan you need to confirm with us the type, number and location of bat boxes you are to put up as mitigation before you purchase and install them. Also, please make sure that you read through the attached thoroughly and understand what is required. If you have any question please give me an email, noting as above, that I will be out of the office until 28th September.
Best wishes
Sophie
Miss S Costain, Ecosystem Policy Officer Department of Environment, Food & Agriculture, Thie Slieau Whallian, Foxdale Road, St Johns, Isle of Man, IM4 3AS Tel +44 (0)1624 685963 Mob +44 (0)7624 431301 Fax +44 (0)1624 685851 Email [email protected] or [email protected] Website: www.gov.im/defa DEFA - working for a clean, safe, healthy, attractive and vibrant environment which will be enjoyed by present and future generations alike.
Our Island, Our Environment, Our Future.
Working Together for a Sustainable Future Gobbragh Cooidjagh Son Traa Ry-Heet Shassooagh
==== PAGE 2 ====
2 From: [email protected] [email protected] Sent: 05 September 2023 13:20 To: Costain, Sophie (DEFA) [email protected] Subject: Fwd: Bridge House Mitigation Method Statement
Caution: This email is from an external sender. Please take care before opening any attachments or following any links.
Hi Sophie
Got statement from Kev. Please have a look. He advised me to forward this to planning department. I am not sure to whom should I email this, please let me know if you know the right email.
Kind Regards Ram
Sent from my iPhone