23/10086/AIR PLANNING OFFICER REPORT AND RECOMMENDATION
Application No. : 23/10086/AIR Applicant : John Lee Proposal : Information in relation to condition 15 for PA 22/00549/B for surface water drainage arrangements. Site Address : Site 1 Of Former Isle Of Man Holiday Camp Switzerland Road Douglas Isle Of Man
Planning Assistant: Mr Daniel Spencer
Recommended Decision: Permitted
Date of Recommendation: 18.08.2023
Conditions and Notes for Approval
C : Conditions for approval N : Notes attached to conditions
NOTE . In this instance, the submitted information is deemed sufficient to achieve the desired outcome as recommended by the case officer and would be satisfactory to discharge the planning conditions No. 15 of this planning application with the understanding the approved details are maintained in working order.
Plans/Drawings/Information;
This decision relates to the following documents submitted on 11/08/2023:
2310086AIR APL Planning Conditions 15 Application Form.pdf 2310086AIR APL Planning Conditions 15_Submission Note.pdf 2310086AIR APL Planning Conditions 15_Surface Water Drainage_BSA.pd
__
Officer’s Report
1.0 Description
1.1 The proposed application 22/00549/B for the creation of a parkland campus facility comprising of a head-quarters office building with restaurant, café, collaborative working areas and 66 associated staff accommodation units with associated landscaping was approved on 30/06/2023 subject to 18 conditions some of which required submission of additional information prior to the commencement of works.
1.2 This report is specific to Condition 15 which the applicants are seeking to satisfy.
==== PAGE 2 ====
23/10086/AIR 1.3 Specific wording of the condition as follows:
"C15. Prior to commencement of any works, details shall be submitted in writing to the Planning Authority for approval which shows the surface water drainage arrangements for the raised pedestrian crossing at the junction of Victoria Road and Switzerland Road. Further details showing how any surface water runoff from the proposed entrances will be prevented from draining onto the adjacent public highway and where such water will be drained to shall be included. The approved details shall be completed prior to the occupation of the development and maintained in working order.
Reason; In the interests of surface water runoff and highway safety."
2.0 Proposal
2.1 The applicant's agent have now submitted an application, cover letter and a Public Highway Surface Drainage Report detailing the proposed surface water drainage arrangements to the roadways around the site.
3.0 Consultation
3.1 The Department of Infrastructure Highways Drainage was consulted for advice on the satisfaction of condition. The advice received on 16/08/2023, after their review of the submitted documents, concludes that they are pleased to confirm that the information satisfies the relevant clauses.
4.0 Recommendation
4.1 In this instance of the submitted Public Highway Surface Drainage Report, cover letter as well as the application and after consultation with the case officer, who are happy with the level of detail, it is deemed sufficient to achieve the desired outcome and would be considered satisfactory for the planning condition 15 of application 22/00549/B with the understanding the approved details are maintained in working order.
__
I can confirm that this decision has been made by a Principal Planner in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation and that in making this decision the Officer has agreed the recommendation in relation to who should be afforded Interested Person Status.
Decision Made : Permitted
Date: 25.08.2023
Determining officer
Signed : C BALMER
Chris Balmer
Principal Planner