Loading document...
==== PAGE 1 ====
Adjacent Properties and Boundaries are shown for illustrative purposes only and have not been surveyed unless otherwise stated. All areas shown are approximate and should be verified before forming the basis of a decision. Do not scale other than for Planning Application purposes. All dimensions must be checked by the contractor before commencing work on site. No deviation from this drawing will be permitted without the prior written consent of the Architect. The copyright of this drawing remains with the Architect and may not be reproduced in any form without prior written consent. Ground Floor Slabs, Foundations, Sub-Structures, etc. All work below ground level is shown provisionally. Inspection of ground condition is essential prior to work commencing. Reassessment is essential when the ground conditions are apparent, and redesign may be necessary in the light of soil conditions found. The responsibility for establishing the soil and sub-soil conditions rests with the contractor. WEST WING, SOMERSET HOUSE, STRAND L O N D O N , W C 2 R 1 L A , T E L . 0 2 0 7 8 4 1 0 1 4 0 O L D H Y D E H O U S E , 7 5 H Y D E S T R E E T WINCHESTER, HA N T S, SO23 7DW , TEL . 01962 843843 www.adamarchitecture.com [email protected] Scale 1:20 0 1 2 4702 Project Name #Project Description Proposed Platform Lift Shaft - Section initials PROJECT TITLE: SCALE: DATE: DRAWING No: DRAWN BY: yr/mm 1:10 @A1 Rev Date Description Initials Key Plan @ 1:500 First Floor 1,462 3,350 1,570 1,570 1,377 3,350 260 3,202 1,462 1,377 96 1,230 50 70 1,100 3,610 Platform Travel Height Lift platform level with floor finish S t a n n a h M i d i l i f t New timber skirting board tbc 12.5 gyproc soundbloc plaster board tapped and sealed. Mechanically Fixed to battens 38 x 44 pressure treated timber battens fixed to lift structure at 400 centres, junctions, or where required. To be co-ordinated with manufacturer 10.5mm powdercoated steel infill panels from lift manufacturer Fosroc Flamex intumescent sealant Free standing lift shaft structure to lift suppliers detail and specification Stannah Midlift SL Platform lift Stannah standard lift operation console New medium density blockwork wall with 13mm wet plaster coating on both sides Fosroc Flamex intumescent sealant Structural midrail supplied and installed by lift supplier Fosroc Flamex intumescent sealant New timber door to match existing Timber architrave to be confirmed Fosroc Flamex intumescent sealant Existing plaster and lath ceiling to be retained. New 2 x 12.5 gyproc soundbloc on 100 x 44 timber studs at 400 c/c with noggin stiffener every 1.2m centres 33mm floor finishes zone Install double joist under new partition wall Stannah standard grab rail 70mm (exact dimension) platform pit 135mm concret slab to structural engineer's detail and specification Ceiling finish TBC M10 Studding set into Hilti HY70 Resin. 90mm embedment fixed to existing masonry to concrete padstone to structural engineer's specification 10mm Coach Screws 70mm depth fixed to timber Packing timber as required G . 1 7 P A N T R Y 1 . 1 6 K I T C H E N Scale 1:10 0 1 SH January 2023 Prepared for internal issue 16.01.23 A SH
Copyright in submitted documents remains with their authors. Request removal