Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Horncastle Thomas 20 Athol Street Douglas Isle Of Man IM1 1JA TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Registered Building) Regulations 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Market Hill Property Ltd, Ref 17/01082/CON, for the Registered Building consent for door and window alterations, installation of flue and ventilation grills, lighting, basement and ground floor refurbishment works and installation of a mezzanine level (in association with 17/01081/GB) Registered Building Nos. 120 at Market Hall Market Hill Douglas Isle Of Man IM1 2BH subject to compliance with the following condition(s) and notes (if any) : 1. The works hereby granted registered building consent shall be begun before the expiration of four years from the date of this consent. Reason: To comply with paragraph 2(2)(a) of schedule 3 of the Town and Country Planning Act 1999 and to avoid the accumulation of unimplemented registered building consents. 2. Prior to the installation of any external ventilation grilles or louvres, details of these in terms of material, exact size and appearance and dimensions, must be approved by the Department and the development undertaken in accordance with these details. Reason: The building is important and readily visible and such elements can produce an adverse impact if insensitively installed. 3. The colour of the sides and top of the proposed flues must be approved by the Department prior to the installation of the same.
Reason: The flues may detract from the appearance and character of the building if inappropriately finished. This decision relates to the following drawings: 177_01 177_03 177_11 177_12 177_13 177_14 177_15
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 177_16 177_17 177_900 177_901 177_902 177_903 177_904 177_905 177_920 177_921 177_922 1010 1020 1050 1060 1061 3000A 3001C 3002C 3300 3600 3601A 3800B 3801 3802A 4000B 4001B 4002B 5000B 5001B 5010B 5011A 6000 6001 6010A 6011A 6012A 7200A 7201A 7300B Date of Issue: 1st December 2017 Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it in the name of the Minister and/or in the name and on behalf of the Department. This permission refers only to that required under the The Town and Country Planning (Registered Building) Regulations 2013. Any appeal against this decision must be in accordance with the criteria set down in that instrument. Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain: · Payment of a planning appeal fee as prescribed in the Town and Country Planning (Application and Appeal Fees) (No2) Order 2016 (currently £175); · The reasons for making the appeal; and · An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation. An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planning- applications/planning-appeals/how-to-appeal/ The proposed development must not be commenced until either; · The time for requesting an appeal has expired; or · Any appeal has been determined; Whichever is the later. If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. A copy of the Officer’s report and any correspondence which led to the assessment and decision is now available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas. https://www.gov.im/planningapplication/services/planning/search.iom Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal