Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Mr Richard Morris Ardwhallin House Wes Baldwin IM4 5EU TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr Richard Morris, Ref 15/01131/B, for the Alterations and erection of attached garage with living space above to approved renovation and extension of existing barn to form a dwelling at The Barn Ballig Farm West Baldwin Isle Of Man IM4 5EU subject to compliance with the following condition(s) and notes (if any) : 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals. 2. Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification), no development shall be undertaken in accordance with Part 2 of schedule 1 of the Order at any time, other than that expressly authorised by this approval, shall be carried out, without the prior written approval of the Department. Reason: To control future development on the site and to safeguard the residential character and amenities of the area 3. No development shall be commenced until a hard and soft landscaping scheme has been submitted to and approved in writing by the Department. Such a scheme shall include details of all walls, fences, trees, hedgerows and other planting which are to be retained; details of all new walls, fences and other boundary treatment and finished ground levels; a planting specification to include [numbers, density, size, species and positions of all new trees and shrubs]; the location of grassed areas details of the hard surface treatment of the open parts of the site and a programme of implementation. All hard and soft landscaping works shall be carried out in accordance with the approved details. The works shall be carried out prior to the occupation of any part of the development or in accordance with the programme agreed in writing with the Department. Any trees or plants indicated on the approved scheme which, within a period of five years from the date of planting, die, are removed or become seriously damaged or diseased shall be replaced during the next planting season with other trees or plants of a species and size
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 to be first approved in writing by the Department. All hard landscape works shall be permanently retained in accordance with the approved details.. Reason: To ensure the provision of an appropriate landscape setting to the development. 4. No site works or clearance shall be commenced until protective fences which conform with British Standard 5837:2012 (or any British Standard revoking and re-enacting British Standard 5837:2012 with or without modification) have been erected around any existing trees to be indicated on plans to be first submitted to and approved in writing by the Department. Unless and until the development has been completed these fences shall not be removed and the protected areas are to be kept clear of any building, plant equipment, material, debris and trenching, with the existing ground levels maintained, and there shall be no entry to those areas except for approved arboricultural or landscape works. Reason: To safeguard the areas to be landscaped and the existing trees and planting to be retained within the site. 5. The existing trees and hedges shall be retained in accordance with the approved details. Any retained tree or hedge which within five years of the approved development being occupied or completed (whichever is the later) dies, are removed or become seriously damaged or diseased shall be replaced by a similar species, of a size to be first approved in writing by the Department, during the next planting season or in accordance with a programme of replacement to be agreed in writing with the Department. Reason: To safeguard the appearance of the development and the surrounding area This approval relates to Plan numbers Ballig 15/01 and Ballig Barn 09/02 both date stamped as received on 8 October 2015. Date of Issue: 22nd January 2016 Director of Planning and Building Control Guidance Note This decision was made by a Senior Planning Officer in accordance with the authority delegated to them in the name of the Minister and/or in the name and on behalf of the Department. This permission refers only to that required under the The Town and Country Planning (Development Procedure)(No 2) Order 2013. Any appeal against this decision must be in accordance with the criteria set down in that instrument. Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain: · Payment of a planning appeal fee as prescribed in the Town and Country Planning (Application and Appeal Fees) (No2) Order 2015 (currently £165); · The reasons for making the appeal; and
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 · An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation. An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planning- applications/planning-appeals/how-to-appeal/ The proposed development must not be commenced until either; · The time for requesting an appeal has expired; or · Any appeal has been determined; Whichever is the later. If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. A copy of the Officer’s report and any correspondence which led to the assessment and decision is now available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas. https://www.gov.im/planningapplication/services/planning/search.iom Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal