3 February 2012 · Delegated - Director of Planning and Building Control (Michael Gallagher)
Field 405, West Loughan, Jurby, Isle Of Man, IM7 3es
The proposal involves installing a stand-alone sealed cesspool wastewater treatment facility to serve a single portable toilet in a 1 hectare agricultural field regularly used by dog training clubs for events including open shows.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The site is designated as Open Space under the 1982 Development Plan and General Policy 3 does not justify wastewater facilities in the countryside.
General Policy 3
Sets out permissible development types in countryside areas. Officer noted none justify the wastewater facility, but approved exceptionally due to recreational benefits, low impact, and rural suitability despite policy gap.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This permission relates to the installation of a wastewater treatment system as shown in drawings received on 20th December, 2011.
Use restriction and removal
This permission relates to the installation of the wastewater treatment system for use in association with the use of the site as a dog exercise and show facility. If the site is no longer to be used for this purpose the wastewater treatment system must be removed from the site and the ground restored to its original condition.
no objections thereto