1 July 2016 · Delegated - Senior Planning Officer Sarah Corlett
Ramsey Regeneration Market Hill Site, Market Hill, Ramsey, Isle Of Man, IM8 1jt
The site is Flat 1A Market Hill, Ramsey, part of a three-storey Victorian corner building with ground floor retail and upper floor residential uses, featuring decorative mouldings and a strong street scene of sliding sash windows.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed the proposal against Environment Policy 35, requiring development in Conservation Areas to preserve or enhance character, and Planning Circular 1/98, mandating that visible replac…
General Policy 2
Requires development not to adversely affect townscape character, local amenity, or locality character. Not directly tested in assessment, which focused on conservation-specific policies.
Environment Policy 35
Permits only development in Conservation Areas that preserves or enhances character and protects special features. Officer found proposed casement windows failed to preserve or enhance the Ramsey Conservation Area or building appearance due to mismatched style from existing sash windows, harming uniformity in street scene.
Planning Circular 1/98, The Alteration and Replacement of Windows
For Conservation Area buildings, visible replacements must match original opening method (sliding sash), glazing bars, and frame sections; repair preferred if possible. Proposal's top-hung casement deviated from sliding sash opening, failing Category b requirements for public thoroughfare visibility; sliding sash uPVC would comply.
no objection but request the new windows should reflect the same overall design as the existing (24/06/16)
no objection (16/06/16)
Ramsey Town Commissioners had no objection but observed that new windows should reflect the overall design of existing windows; DOI Highways Division stated no highways interest.
Ramsey Town Commissioners
Conditional No Objectionwhilst they had no objection to the proposal, they made the following observation: - The new windows should reflect the overall design of the existing windows
Conditions requested: The new windows should reflect the overall design of the existing windows
Department of Infrastructure (DOI) Highways Division
No ObjectionNo Highways Interest; NHI on 14-06-2016