2 March 2012 · Council of Ministers
Colby Football Clubhouse, Glen Road, Colby, Isle Of Man, IM9 4nu
The proposal involved demolishing the existing football clubhouse and pitches to build 35 homes (16 detached, 4 semi-detached, 15 terraced) on a 1.6ha site at Colby Football Club Ground, Glen Road, Colby, including estate roads, parking (2-3 spaces per dwelling), public open space (1600m² exceeding amenity standards), …
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The principle of residential development was established by extant approval in principle (PA 05/92118/A valid to 20 Nov 2012) and Draft Southern Area Plan Site 12 allocation, outweighing historic Loca…
Strategic Policy 2 - Priority for new development to identified towns and villages
Requires new development in existing settlements; site in Colby village complies, contributing to south region's 1300 dwellings target.
Housing Policy 1
6000 dwellings 2001-2016; site counts as 30 in Land Availability Survey, shortfall justifies 35.
Housing Policy 5
25% affordable (9 units via legal agreement); need shown by First Time Buyer Register.
Recreation Policy 2
Loss of playing field acceptable with equivalent/better alternative (AFC relocation to 6ha).
Recreation Policy 3
POS standards met on-site (amenity) + off-site formal via AFC; Appendix 6 flexible.
General Policy 2
Avoids harm to character/townscape; design reflects locality (materials, setbacks), no Conservation Area harm.
Environment Policy 36
Protects Conservation Area settings/views; no significant harm from glimpsed dwellings behind screening.
Environment Policy 42
New development takes account of local character; transitional site with traditional elements.
Environment Policy 10
Flood risk; WASA/FRA confirms no increase.
Environment Policy 13
Drainage; attenuated discharge acceptable.
Transport Policy 4
Safe access/network capacity; TA shows acceptable impacts.
Transport Policy 7
Parking standards met (2 spaces/unit).
Time limit
The development hereby permitted shall commence before the expiration of 4 years from the date of this notice.
AFC relocation
No residential development of this site may commence until such time as Colby AFC has established alternative playing and training facilities which are available for use.
Approved plans
This permission relates to the residential development and associated highway and drainage works shown in the following drawings: 2398.01.01A, 2398.01.02A, 2398.01.06, 2398.03.01, 2398.03.02, 2398.03.03, 2398.03.04, 2398.03.05, 2398.03.07, 2398.03.08, 2398.03.09, 2398.03.10, 2398.03.011A, 2398.03.12, 2398.03.13, 2398.04.01, 2398_ADR_500, ADR_FRA, 10/221/TR/005 (contained within the Transport Assessment prepared by Bryan G Hall).
Hydro-brake
The hydro-brake control device in manhole S1.4 must be fitted as soon as practicable after the surface water storage tank has been completed.
Roofing plots 1,2,3,34,35
The roofing on the dwellings on plots 1, 2, 3, 34 and 35 must be finished in natural slate or a slate-like material, a sample of which must be approved by the Planning Authority prior to the erection of any of these dwellings.
Other roofing
Further to condition 5 above, all other roofing must be finished in slate grey coloured tiles.
Landscaping implementation
All planting, seeding or turfing comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the dwellings, whichever is the sooner. Any trees or plants planted as part of the landscaping scheme which within a period of 5 years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species.
Street lighting
Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2005, no street lighting may be erected without the prior approval of the Planning Authority. If street lighting is considered necessary, it must be designed so as to avoid illumination of the wooded area around the edge of the site.
Tree identification/protection drawing
Prior to the commencement of any development on site a Tree Identification and Protection Drawing to replace Drawing No. 2398.01.06 which formed part of the planning application shall be submitted to, and approved in writing by, the Planning Authority. The replacement plan shall be in full accordance with the Arboricultural Evidence of Dr D P O'Callaghan on behalf of Heritage Homes Ltd and dated 5 December 2011. The development shall be carried out in full accordance with the approved Tree Identification and Protection Drawing.
Arboricultural Method Statement
No development shall commence on site until an Arboricultural Method Statement (AMS) has been submitted to and approved in writing by the Planning Authority. The AMS shall provide details of: a. The tree health care programme to be applied to the retained trees; b. The final and accurate location of the protective fencing; c. The construction of the protective fencing; d. The specific "no dig" and cellular confinement approach to the construction of hard surfaces in proximity to retained trees; e. Supervision of the arboricultural aspects of the development by a competent Arboriculturist. The development shall be undertaken in full accordance with the approved AMS.
Public open space finishes
Prior to the commencement of the development details of the proposed treatments and finishes of the surfaces of the areas of public open space shall be submitted to and approved in writing by the Planning Authority. Each area of public open space shall be completed in accordance with the approved details prior to the occupation of the dwellings adjacent to that area of open space.
Visibility splays
The 2.4 metre by 45 metre visibility splays at the access to/egress from the development onto Colby Glen Road must be constructed prior to the construction of any of the residential dwellings.
Highway improvements
The highway improvement works detailed on plan 10/221/TR/005 dated 18 April 2011 must be constructed prior to the occupation of any of the dwellings.
Plot 7 driveway widening
The driveway for Plot 7 requires widening to 7 metres to ensure that the second parked vehicle on that Plot does not encroach onto the access roadway. The widened driveway shall be completed prior to occupation of the dwelling on this Plot, in accordance with a plan which shall first have been submitted to and approved in writing by the Planning Authority.
no objection subject to conditions (visibility splays, junction improvements, Plot 7 driveway widening)
no objection subject to no lighting into wooded boundaries (addresses bats)
satisfied with FRA/foul drainage; no flood increase; condition for hydro-brake/attenuation
need for 9 affordable units (25%) via Section 13 agreement