Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Baxter Construction & Design Limited 14-16 Peel Road Douglas IM1 4LR TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr Andrew Barnett, Ref 20/00061/B, for the Erection of a detached replacement dwelling with associated driveway at Belmont Lewaigue Road Dreemskerry Ramsey Isle Of Man IM7 1BF . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals. 2. Prior to the commencement of the dwelling hereby approved, the existing accesses shall be blocked up using Manx stone and the new access and visibility splay shall be laid out, all as shown on approved plan 03, with not landscaping or any other feature greater than 1.05m in height within the visibility splay and retained thereafter. Reason: In the interest of highway safety. 3. Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification) no extension, enlargement or other alteration of the dwelling(s) hereby approved, other than that expressly authorised by this approval, shall be carried out, without the prior written approval of the Department. Reason: To control development in the interests of the amenities of the surrounding area. 4. The development hereby approved shall not be occupied or operated until the parking and turning areas have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking and turning of vehicles associated with the development and shall remain free of obstruction for such use at all times.
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Reason: To ensure that sufficient provision is made for off-street parking and turning of vehicles in the interests of highway safety. 5. No retained tree shall be cut down, uprooted, destroyed, pruned, cut or damaged in any manner during the development phase and thereafter within 5 years from the date of occupation of the building for its permitted use, other than in accordance with the approved plans and particulars. In the event that retained trees become damaged or otherwise defective during the construction phase due to events outside of the applicant's control the Department shall be notified as soon as reasonably practicable and remedial action agreed and implemented. Reason: To ensure that trees marked for retention (in green on plan 03) are not removed, in the interests maintaining the amenities of the area and to ensure the visual impact of the development is mitigated. 6. No development shall commence until an ecological survey of the site has been submitted to and approved in writing by the Department. The ecological survey shall identify matters of ecological interest (Birds & Bats) within the site and measures to mitigate ecological impacts where appropriate, including a timetable for their implementation. The development shall not be carried out unless in accordance with the approved details. Reason: To provide adequate safeguards for the ecological species existing on the site. This approval relates to the submitted documents and drawings reference numbers 01, 02, 03, 04 & 05 all received on 20th January 2020. This decision has been made for the following reasons(s) Overall, while there is an argument that the new proposed dwelling does not fully comply with HP14 (as previously considered); it is considered the existing dwelling is of poor form and the new proposed dwelling is of a more traditional character (albeit no Manx vernacular) and would not have a significant adverse impact upon the landscape/countryside setting. It is not uncommon in the immediate are to find similar styled properties or non-vernacular properties in large grounds. Overall, it is considered once again the proposal would have no adverse impact upon public or private amenities and therefore comply with the relevant policies. It is recommended the application is approved subject to conditions listed. Date of Issue: 12th March 2020 Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Head of Development Management in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either · Any appeal has been concluded; or · 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: · the grounds for making the appeal; · payment of the planning appeal fee (currently £276); and · if relevant, confirmation that the appellant wishes to have the appeal determined by means of an inquiry and payment of the additional inquiry fee (currently £100). Where the appeal is submitted by the applicant they must: · specify in detail and by reference to material planning considerations the reasons why the appellant disagrees with that determination; and · Where against a refusal, on the grounds of deficient detail or supporting documentation, set out why they consider the information or documentation forming part of the application was sufficient in the circumstance. If the appeal is submitted by someone who has interested Person Status but is not listed in Article 4(2) of the Development Procedure Order 2019, that person must relate their grounds for making the appeal to issues which they included in representations made prior to the application being determined. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
==== PAGE 4 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950
Copyright in submitted documents remains with their authors. Request removal