Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 McGarrigle Architects Ltd 19 Mount Havelock Douglas Isle Of Man IM1 2QG TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr Alan Burrows, Ref 19/01447/B, for the Erection of a detached dwelling with associated detached garage, landscaping retaining walls and new vehicle access at Land Adjoining Rockwood And South Court Ramsey Road Laxey Isle Of Man . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals. 2. Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification) no extension, enlargement or other alteration of the dwelling(s) hereby approved, other than that expressly authorised by this approval, shall be carried out, without the prior written approval of the Department. Reason: To control development in the interests of the amenities of the surrounding area. 3. No development shall commence until a schedule of materials and finishes and samples of the materials to be used in the construction of the external surfaces, including roofs, have been submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details. Reason: In the interests of the character and appearance of the site and surrounding area. 4. The development hereby approved shall not be occupied or operated until the parking and turning areas have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking and turning of vehicles
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 associated with the development and shall remain free of obstruction for such use at all times. Reason: To ensure that sufficient provision is made for off-street parking and turning of vehicles in the interests of highway safety. 5. The visibility splay(s) identified on drawing P-01 REV A; shall be constructed in accordance with the approved plans and thereafter kept permanently clear of any obstruction exceeding 1m in height above adjoining carriageway level. Reason: In the interests of highway safety. 6. No development shall take place until full details of soft and hard landscaping works have been submitted to and approved in writing by the Department and these works shall be carried out as approved. Details of the soft landscaping works include details of new planting (including tree planting) showing, type, size and position of each. All planting, seeding or turfing comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the dwelling, whichever is the sooner. Any trees or plants which die or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species. Details of the hard landscaping works include footpaths and hard surfacing materials. The hard landscaping works shall be completed in full accordance with the approved details prior to the first occupation of the dwelling hereby permitted. Reason: To ensure the provision of an appropriate landscape setting to the development. 7. Obscure glazing (Grade 5) shall be installed in the south east elevation of the ground floor and lower ground floor en suite bathroom windows and shall be kept and maintained thereafter. Reason: To preserve the amenities of the occupants of the adjacent dwelling. 8. No development may commence (including further site clearance) until a Precautionary Working Method Statement by an ecological consultant in relation to Common/Viviparous Lizards which are known within the area has been undertaken and approved in writing by the Department and the recommendations of this report are fully adhered to. Reason: To ensure adequate protection of a native species of reptile on the IOM which are protected under Schedule 5 of the Wildlife Act 1990. This approval relates to the submitted documents and drawings reference numbers: Received on 27th December 2019 EX-01, P-02, P-03, P-04, P-05 & P-06 Received on 4th February 2020 SK10 & Sk11 Received on 11th March 2020 P-01 REV A
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 NOTE The applicant is strongly recommended to discuss the proposed works with the Chief Engineer of the Isle of Man Railways in relation to a Construction Method Statement prior to commencement of construction. This decision has been made for the following reasons(s) It is considered the principle of residential development is appropriate on this site for the reasons indicated, namely being appropriate form of development within the street scene and within the site and not having a significant adverse impact upon neighbouring amenities and therefore comply with the relevant planning policies listed within the IOMSP and The Residential Design Guide. Date of Issue: 1st July 2020 Director of Planning and Building Control
==== PAGE 4 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Head of Development Management in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either · Any appeal has been concluded; or · 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: · the grounds for making the appeal; · payment of the planning appeal fee (currently £285); and · election to have the appeal conducted by means of an inquiry(a hearing) or by means of written representation. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal