Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Cornerstone Architects 79 Parliament Street Ramsey Isle Of Man IM8 1AQ TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Kelnorth Limited, Ref 18/00980/B, for the Residential development of 17 dwellings with associated roads, plots and drainage at Part Of Field 121388 And Former Dale Nurseries Oatlands Road Andreas Isle Of Man . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals. 2. Each dwelling hereby approved shall not be occupied until the parking and turning areas have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking and turning of vehicles associated with the dwelling and shall remain free of obstruction for such use at all times. Reason: To ensure that sufficient provision is made for off-street parking and turning of vehicles in the interests of highway safety. 3. No development shall take place until a further landscaping plan of soft landscaping works surrounding the substation have been submitted to and approved in writing by Department and these works shall be carried out as approved. Details of the soft landscaping works include additional planting as already shown on drawing (03) 002 but additional planting in and around the Public Open Space Area and to the frontage/entrance of the site. All planting shall be carried out in accordance the approved details in the first planting and seeding seasons following the first occupation of each dwelling permitted. Any trees or shrub which within 5 years from the completion of the development dies, is removed or becomes seriously damaged or diseased shall be replaced in the next planting season with another of similar size and species unless the planning authority gives written consent to any variation.
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Reason: To ensure the provision of an appropriate landscape setting to the development and to protect amenities of neighbouring amenities. 4. Prior to the commencement of development a 'Timetable Scheme' for the provision of the Public Open Space areas as shown on drawing (03) 002 is to be submitted to and approved by the Department which gives a timetable of when all the Public Open Space will be completed and all made available for recreational use before the occupation of the last dwelling. Development shall be carried out in accordance with the agreed timetable. Reason: To ensure adequate Public Open Space provision is provided. 5. Prior to the occupation of any dwelling, the road and footway/footpath between the highway and that dwelling shall be constructed to at least base course level. Reason: To ensure adequate pedestrian and vehicular access to each dwelling in the interest of highway safety. 6. All planting, seeding or turfing not included within the areas of public open space (mentioned within Conditions 3 & 4) comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the development. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species. Reason: To ensure the provision of an appropriate landscape setting to the development. 7. Prior to the commencement of the development (including demolition) the proposed new access is to be installed (required to be completed prior to first dwelling being occupied) with visibility splays of 2.4m x 70m in both directions and thereafter kept permanently clear of any obstruction exceeding 1.05m in height above adjoining carriageway level. This also requires no obstruction (i.e. any vegetation, trees, fences, gates, walls, sheds, greenhouses, play equipment, and any other structures) exceeding 1.05m in height above adjoining carriageway level within the front garden of the dwelling on Plot 2. Reason: To ensure safe access onto the highway in the interests of highway safety both during the construction period and afterwards 8. Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification), no fences, gates, walls or other means of enclosure shall be erected or placed within the curtilage of any dwelling house forward of any wall of that dwelling house which fronts onto a highway, without the prior written approval of the Department. Reason: To control development in the interests of the amenities of the surrounding area and to ensure visibility is not impeded by building/structures forwards of the dwelling on Plot 2. 9. The Detention Basin and associated drainage scheme as shown on drawing 10 REV B are required to be in place before the occupation of the first dwelling and maintained thereafter. Reason: To ensure appropriate surface water drainage of the site.
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 10. No site works or clearance shall be commenced until protective fences which conform with British Standard 5837:2012 (or any British Standard revoking and re-enacting British Standard 5837:2012 with or without modification) have been erected around any existing trees as shown on drawing Nr (03) 004 REV A. Unless and until the development has been completed these fences shall not be removed and the protected areas are to be kept clear of any building, plant equipment, material, debris and trenching, with the existing ground levels maintained, and there shall be no entry to those areas except for approved arboricultural or landscape works. Reason: To safeguard the areas to be landscaped and the existing trees and planting to be retained within the site. This approval relates to the submitted documents and drawings reference numbers (03) 001, (03) 002 REV C, (03) 005, (03) 100, (03) 110, (03) 120, (03) 130, (03) 140, (03) 150, (03) 160, (03) 170, (03) 180, (03) 500, (03) 003, (03) 115, 10 REV B, LS-01 REV B, LS-02 REV B, (03) 004 REV A), (03) 006, Design And Access Statement (Cornerstone Architects), Tree Survey Report (Manx Roots), and Flood Risk Assessment (BB Consulting Engineers) received on 14th August 2018, 14th December 2019, 22nd March 2019 and 28th March 2019. Date of Issue: 23rd October 2020 Director of Planning and Building Control
==== PAGE 4 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Head of Development Management in accordance with the authority delegated to them. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either · Any appeal has been concluded; or · 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: · the grounds for making the appeal; · payment of the planning appeal fee (currently £285); and · election to have the appeal conducted by means of an inquiry(a hearing) or by means of written representation. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal