REASONS FOR REFUSAL
- There is insufficient information contained within the submitted application to enable the Committee to make a proper assessment; in particular
(a) the elevational drawings do not show the built contact of the proposed development, and are not of a scale which permits adequate representation of the detailing;
(b) there is insufficient detail with regard to the arrangements for access and the provision of suitable and sufficient refuse storage areas;
(c) there are no details of phasing;
(d) there are no details of
(i) fire precautions;
(ii) alternative means of escape from upper
PMMA
COMPETITOR for app
highways
DGIS Corp.
MEA
CEHI
SPMC
MEPD
Adeo
CFO
MUSEUM
floors; and
(iii) the separation between the parking area
and the upper floors.
- In any case, the design of the building is
poor: the form and height are constant,
displaying little interest or character, and
failing to acknowledge the lower buildings
to the North and South.