From: Gledhill, Jan
Sent: 16 March 2018 12:27
To: DEFA, Planning
Cc: Galtress, Karen; 'Simon and Caroline Dunn (sandcdunn)'
Subject: 18/00172/B domestic sewage treatment plant. North Star House West Baldwin
Attachments: Dev within 9m page 1.jpg; Dev within 9m page 2.jpg
The completed 'Development within 9m of a Watercourse' form has been received for this application and has been checked by Fisheries Officers (attached). The applicant has considered suitable precautions to reduce the possibility of harmful materials entering the river. DEFA Fisheries have no objection to the proposed development, provided that these precautions are followed and there is no disturbance of the watercourse. The applicant is however advised to contact DEFA when works are due to commence, which can be done by email or telephone. In the meantime Inland Fisheries can be contacted on 685857 with any further queries.
Kind regards
Jan Gledhill
Dr J.R. Gledhill Inland Fisheries Development Manager Fisheries Directorate Department of Environment, Food and Agriculture, Thie Slieau Whallian, Foxdale Road, St Johns, Isle of Man IM4 3AS
Tel: 01624 685857 Email: [email protected]

Rheynn Chymmyltaght, Bee as Eirinys
As part of the planning application process you have indicated that the proposed development is within 9m of a watercourse. You are asked to complete the following form to provide the Department with additional information regarding the proposal. Please note that where significant disturbance is anticipated a formal Method Statement and/or site visit may also be required.
Please provide details of the proposed development.
Planning application No.: 13/00172/8
Address:
NORTH STAR, WEST BALDUIN, ISLE 6F MAN, 1MHL 5EZ.
Name of watercourse (where known):
NWIN - NY - DARRATH (1), JUST BEFORE JOANS RIVER GLASS
Please give details of any proposed alterations to the watercourse or the bankside.
NOT APPLICABLE
Please give details of any possible disturbance to the watercourse. If entry to the watercourse (by personnel or machinery) is required as part of the development, please give details.
HAND DIGGAL NO NEAR WATERCOURSE, NO MACHINERY, IN 60 NEAR RIVER BANK, ON RIVER BANK SIDE, HOLE TO BE MADE TO ACCOMMODATE END OF ROOM PIPE, CONCRETE TO BE LAID (SMALL PATEA) ON TOP OF RIVER BANK.
Certain activities have greater impact on a watercourse at different times of year (e.g., at times of high water temperature or low flow conditions). Please give details of the timing of phases of the development which are likely to affect the watercourse. Note in-channel works are not normally permitted between the months of October to June inclusive.
NOT APPLICABLE - WORK TO BE CARRIED OUT OVER THE SUMMER.
These substances are highly damaging to the aquatic environment. Please give details relating to the use of these materials and how you intend to prevent their introduction into the watercourse.
READY MIXED "50 JUMP" CONCRETE, THIS IS VISCONS AND WONT RUN. TO BE LAID ON TOP OF RIVER BANK, BUT WONT RUN IN, DECAUSE OF IT'S VISCOSCITY. WONT BE LAID IN INCREMENT WEATHER & EITHER. SMALL PATEA OF CONCRETE IS INVOLVED.
Sign and date: 16/11/2018
Print name: CAG & LINE DUNN
Please return your completed form to: Fisheries Directorate, Thie Sileau Whalilan, Foxdale Road, St Johns, IM4 3AS. Or by email to [email protected]
Please include a site location plan clearly showing the location of the proposed development in relation to any watercourses, including any relevant distances or dimensions.
If you have any questions regarding this form please contact the Department on 685857 or at [email protected].
To report a suspected pollution incident please contact the Department on 685896 / 685855.
Copyright in submitted documents remains with their authors. Request removal