Loading document...
17/00950
The Town and Country Planning (Development Procedure) (No2) Order 2013
Please complete in BLOCK CAPITALS and in black ink.
The person here below named as the applicant is responsible for payment of the appropriate fee.
All relevant questions on this form must be answered.
Guidance notes are available on request.
Arbory Street, Castletown
Please ensure that details of the matters selected above are provided.
Please ensure that details of the matters selected above are provided.
Ref. No.
Please include all first names and surname or full details where an applicant is 'trading as' or a limited company.
c/o The Rev. D. Shirtliff, 16 Cronk Cullyn, Colby
Postcode 1M9 4NG
Telephone number
Home 621968
Work
Applicant's e-mail address
Putting the Customer First
PA Form 2(i)
Telephone number Agent's e-mail address
Guy J. Thompson The Old Paint Shop, Athol Street, Port St. Mary Postcode IM9 5DS [email protected]
c) Does the applicant own or control any additional land within the vicinity of the application. If yes, you must outline the additional land in blue on the site plan. Yes \square No \square 7. Applicant's interest in the site (e.g. owner, tenant, potential purchaser) owner 8. Relevant Fee Enclosed (where required) Please note the application will remain invalid until the application fee is paid in full. Cheques should be made payable to IOM Government. If the proposed development would create additional industrial, residential, retail or office floor space, please specify the floor area in square metres This area should be used to where the fee calculus requires it. Where the application is exempt from a fee under the current fees order, please state the registered charity number. 9. a) Please state the existing use of the site (e.g. residential, office, retail etc.) b) Please state the proposed use of the site. church church 10. a) Development within a Conservation Area. If yes, please include details of any demolition involved on a separate sheet. Yes \square No \square b) Works proposed to a Registered Building. If yes, please quote the RB number and complete an application for Registered Building Consent to accompany this form (form RBAP). Yes \square No \square 11. Are the activities Retrospective or as a result of an Enforcement Enquiry? If as a result of an enforcement enquiry please quote reference and the date that the building work or use was started/completed. Yes \square No \square
Enf No. Started Completed
Have you consulted with Highway Services? \square Yes \square No \square Please confirm the number of parking spaces within the site. existing \square proposed \square 14. Does your proposal involve a change in site levels?
If yes, please provide drawings showing the change in site levels (e.g. spot levels or site sections). Please also include a method statement detailing the proposed means of importing fill and/or the means of exporting the fill, including details of the expected quantities involved. 15. Please specify below whether the proposal requires new or amended services: a) Gas Yes \square No \square b) Electricity Yes \square No \square c) Water Yes \square No \square
The applicant should consult the service providers separately in order to establish the location of existing services and the impact of the proposed works on existing services. See guidance notes. 16. a) How will rainwater run-off from roofs and paved surfaces be disposed of? n/a b) How will foul sewage from the proposed development be disposed of? n/a c) If a septic tank/Biodisc system is proposed, please provide details demonstrating that the septic tank/Biodisc would be acceptable under Building Regulations - See guidance notes. 17. a) Are there trees, large shrubs or hedges on the proposed development site? Yes \square No \square b) Are there any trees or hedges within 15 metres of the proposed development site? Yes \square No \square
If you answered Yes to either of the above, then your application will need to include accurate tree survey drawings showing the position of the trees and hedges and their canopy spread in relation to the proposed works. You must provide details of any trees which are to be 'lopped' or 'felled' as a result of the proposal. For trees to be retained you will need to demonstrate that the constraints imposed by these trees have been properly considered and that the trees can be adequately protected. The above works must be discussed with the Department's Forestry, Amenity & Lands Directorate before the application is submitted. The Planning Officer may also require you to submit a Tree Survey. 18. Are the proposed works within 9 metres of any watercourse (river, ditch or otherwise)? If so, you are advised to contact the Department's Environment Safety and Health Directorate for further guidance in respect of this application. 19. Have you received pre-application advice from a Planning Officer? Yes \square No \square If yes, please state the Officer's name Sarah Corlett \square Date 20.12 .16 and the date of their response.
Please see supporting documents from specialist glazier (Robert C. Bullock)
Building Regulations 21. a) Are you making a concurrent application for Building Regulations Approval? Yes ☐ No ☑ b) If yes, please indicate to which Authority your application has been submitted.
DEFA ☐ Douglas Corporation ☐ Onchan District Commissioners ☐ c) The date of submission. ☐
d) Building Regulations reference number (if known) ☐
Should any plans be missing, the application will be considered incomplete and returned with a request for missing plans to be submitted.
Please continue on a separate sheet if necessary.
| Plan | Dated | Ref No | | --- | --- | --- | | Site Plan | | | | Locations Plan | | | | Proposed Plan | 8/17 | 1 | | | | | | | | | | | | |
PLEASE ALSO ENCLOSE one copy of - A Certificate of Land Ownership (Certificate O1), and - An Application Check List (Form PL.7) To the best of my knowledge and belief, all the information given in this application is true, and the documents provided herewith are accurate.
Signature of Applicant or Agent
Gutwin Vazquez Dated 25/08/2017
If signing on behalf of a company, please clearly state your relationship.
Should this application be unsupported by adequate and clear site maps and plans outlining all the works proposed, the Department retains the right to reject acceptance and return the application.
Note: no works may be commenced until such time as: a) on your receipt of the planning Decision Notice the time period for requesting an appeal has expired and no such appeal has been requested, or b) any Appeal has been completed.
Planning and Building Control Directorate Department of Environment, Food and Agriculture Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF Tel: +44 1624 685950 Fax: +44 1624 686443 Email: [email protected] PA Form 2(i)
This certificate provides confirmation that the owner of the land which is the subject matter of the application is either the applicant or is fully aware of the application.
The certificate constitutes a statement of ownership and is not proof of ownership.
The applicant is requested to complete either Statement A or Statement B and return the completed certificate and planning application form and any supporting documents.
NO APPLICATION WILL BE PROCESSED UNTIL SUCH TIME AS THE CERTIFICATE IS SUBMITTED.
I certify that the accompanying application is made by or on behalf of the owner of the land, namely:
Castletown Methodist Church Council
(Full names in CAPITAL letters)
who is:
If the application is made on behalf of the land owner, a certified copy of the power of authority signed by the owner authorising the application on his behalf is attached hereto.
I certify that appropriate written notice of the accompanying application has been given by or on behalf of the applicant to:
The persons upon whom notice was issued are:
| Name & Address | Name & Address | | --- | --- | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Copyright in submitted documents remains with their authors. Request removal