Loading document...
Application No.: 23/01016/B Applicant: Mr David Stockton Proposal: Erection of new garage/workshop and reconstruction of existing garage Site Address: River House Riverside Ramsey Isle Of Man IM8 3DA Planning Officer: Mr Paul Visigah Expected Decision Level: Officer Delegation Recommended Decision: Permitted Date of Recommendation: 28.11.2023
C : Conditions for approval N : Notes attached to conditions
Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
Reason: To ensure that the watercourse is not adversely affected by the discharge of harmful materials, such as concreate or washings.
Reason: The Department has assessed the impact of the proposal on the basis of the specific use and the documents submitted.
This application has been recommended for approval for the following reason.
The proposal is considered to be in accordance with General Policy 2, Transport Policy 7, Environment Policies 7, 10, 13 and 42 of the Isle of Man Strategic Plan 2016, in that no unacceptable visual, residential amenity, highway safety or other impacts were identified.
Plans/Drawings/Information;
This decision relates to the documents and plans received 07 September 2023, and Agent Correspondence with Manx Utilities Drainage received 29 September 2023. _______________________________________________________________
Additional Persons
It is recommended that the following Government Departments should be given Interested Person Status on the basis that they have made written submissions relating to planning considerations:
Department of Infrastructure (DOI) Flood Risk Management Division Manx Utilities Drainage _____________________________________________________________________________
1.0 THE SITE - 1.1 The application site represents the residential curtilage of River House, Riverside, situated at the western end of Riverside, Ramsey. The dwelling which is a large detached property sits within large grounds with most of its boundary with the neighbours to the east and north enclosed in mature landscaping. The entire western boundary of the site borders the Sulby River. - 1.2 The site is accessed via a lane which also serves a number of other properties; Port Natal and 1-6, Riverside. Riverside which branches off Bowring Road is a private road which is generally single width and unmade. - 1.3 River House is a two storey house with a two storey rear annex and a more modern single storey annex to the rear (north) of this. The single storey annex continues to the east in a part courtyard, providing additional living accommodation and a single garage. Alongside the existing garage is an area of new retaining walls around an area of raised bank.
2.0 THE PROPOSAL - 2.1 Planning approval is sought for erection of new garage/workshop and reconstruction of existing garage. The proposed garage/workshop will be 17m long, 9.1m wide and 3.9m tall (2.4m to the eaves). The east elevation of the garage would abut a retaining wall such the floor level would be set 1.19m below the top of the retaining wall. The roof and walls of the garage will be clad in RAL Design 160-50-20 - Juniper Green coloured cladding. This garage is proposed to accommodate 6 cars along with the workshop use. - 2.2 The proposal would involve the removal of the existing garage within the courtyard to provide access for the construction of the new garage/workshop and it will be rebuilt to match removed garage. - 2.3 No trees would be removed to facilitate the development and there would be no changes to site levels. - 2.4 The applicants have indicated that no residential use (no habitable accommodation) is proposed in the garage. The garage would be served by a septic tank which serves the existing dwelling, and surface water will be directed to the Sulby River with non-return valves to prevent flooding. - 2.5 The applicants have provided a Planning Statement which sets out the site context in terms of layout of buildings, site topography, relationship with trees and mature landscaping,
relationship with the Sulby River, the design context of the existing site in terms of architectural style, flood mitigation measures, and their impact on design. This Statement also describes the development in detail, addresses flood matters and relationship of the development with trees on site.
3.0 PLANNING POLICY - 3.1 The site lies within an area designated on the Ramsey Local Plan (1998) as 'Predominantly Residential' and the site is not within a Conservation Area. The site is not within a registered tree area, and there are no registered trees on site. The majority of the site area, including the site of the proposed development is within an area susceptible to High Tidal flood risks as indicated on the IOM indicative Flood Maps. - 3.2 The draft Area Plan for the North and West identifies the house and site of the proposed development as Residential with the remainder of the garden as open space. - 3.3 In terms of strategic plan policy, the Isle of Man Strategic Plan 2016 contains the following policies that are considered specifically relevant to the assessment of this current planning application: - 3.4 National policy: THE ISLE OF MAN STRATEGIC PLAN 2016
4.1 Regard will be given to the recently released Residential Design Guidance 2021 in development of new dwellings. - 4.2 IOM Biodiversity Strategy 2015 to 2025 seeks to manage biodiversity changes to minimise loss of species and habitats, whilst seeking to maintain, restore and enhance native biodiversity, where necessary. Section 21 deals with Habitat loss actions through promoting a policy of 'no net loss' for semi-natural Manx habitats and species and to ensure that unavoidable loss is replaced or effectively compensated for.
5.1 The site has been the subject of three previous planning applications:
6.0 REPRESENTATIONS Copies of representations received can be viewed on the government's website. This report contains summaries only.
6.1 The Department of Infrastructure (DOI) Highways Division have not made any written comments on the application, although they were consulted on 12 September 2023.
6.2 DOI Flood Risk Management note that the property is in a tidal flood zone, and request that the application should be conditioned so that the proposed build cannot be used as habitation. (25 September 2023). - 6.3 DEFA Fisheries confirm that they have no objections to this development from a fisheries perspective, provided that there is no adverse effect on the adjacent watercourse. They note that as the proposed works are in close proximity to the watercourse, precautions will be needed to reduce the possibility of harmful materials such as concrete or washings entering the river (17 October 2023). - 6.4 DEFA Arboricultural Officer has stated that the proposal does not pose a significant risk to the trees. They have no objections to the proposal, do not recommend any additional information is provided, and agree that tree protection measures are not necessary in this instance (16 November 2023). - 6.5 Manx Utilities Drainage have noted that the application form states that SW will be discharged to existing main surface water system, and advise that they have no public drainage in the area (26 September 2023).
6.6 Ramsey Town Commissioners have not made any comments on the application although they were consulted on 12 September 2023. - 6.7 No comments have been received from neighbouring properties.
7.1 The main issues to consider in the assessment of this planning application are:
7.2 Character and Appearance (GP2, b, c, EP 42 and STP3 b)
7.3 Impacts on the nearby watercourse (EP 7)
8.1 Overall, it is concluded that the planning application accords with the relevant policies of the Isle of Man Strategic Plan 2016 and the principles promoted by the Residential Design Guide, and as such is recommended for approval. - 9.0 INTERESTED PERSON STATUS
9.1 By virtue of the Town and Country Planning (Development Procedure) Order 2019, the following persons are automatically interested persons:
I can confirm that this decision has been made by the Head of Development Management in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation and that in making this decision the Officer has agreed the recommendation in relation to who should be afforded Interested Person Status
Decision Made : Permitted Date : 28.11.2023 Determining officer
Signed : S BUTLER Stephen Butler Head of Development Management
Customer note This copy of the officer report reflects the content of the file copy and has been produced in this form for the benefit of our online services/customers and archive records.
Copyright in submitted documents remains with their authors. Request removal
View as Markdown