20 July 2023 · Delegated - Principal Planner (Jason Singleton)
9, Crellin Close, Reayrt Mie, Ballasalla, Isle Of Man, IM9 2bw
Dandara Homes Limited applied to adjust the layout of footpaths and a car parking court serving plots C74-C75 on Crellin Close and C87-C91 on Shimmin Road in the Reayrt Mie Phase 3 development, Ballasalla.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer considered the proposal to be minor alterations to footpaths, parking, and plot boundaries within an already approved residential phase, with changes making layouts more efficient, conveni…
Strategic Policy 1
Requires efficient use of land and resources. The minor layout changes optimise parking and footpaths without adding units, complying within the approved residential phase.
Strategic Policy 2 - Priority for new development to identified towns and villages
Gives priority for new development to identified towns and villages. Site is in Ballasalla, a designated service village on Proposed Residential land per Area Plan Map 4.
Strategic Policy 3 - To respect the character of our towns and villages
To respect the character of towns and villages. Changes reflect approved Phase 3 design, appearance, and materials with neutral visual impact.
Strategic Policy 4
Protection of built heritage and landscape conservation. Not in conservation area; tree retention and enhanced landscaping strips mitigate impacts.
Spatial Policy 5
Design and visual impact. Revisions consistent with approved layouts, no detrimental amenity effects.
Strategic Policy 10
Sustainable transport. Improved footpath and cycleway layouts support pedestrian and cycle access.
Strategic Policy 11
Housing needs. No change to approved housing provision or affordable housing requirements.
Spatial Policy 3
Identifies service villages like Ballasalla for development.
Spatial Policy 5
Building in defined settlements or GP3. Site allocated for residential use.
General Policy 2
General development considerations. No significant adverse amenity impacts.
Environment Policy 4
Wildlife and nature conservation. Greater separation from watercourse; no fisheries objections.
Environment Policy 42
Respect local character and identity. Consistent with approved phase design.
Housing Policy 1
General need for additional housing. Supports approved housing land supply.
Transport Policy 1
Proximity to public transport. No highway safety issues raised.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
Estate roads construction
The estate roads, including footpaths, cycle paths and turning spaces, shall be constructed so as to ensure that, before it is occupied, each dwelling has been provided with a properly consolidated and surfaced footpath and carriageway to at least base course level between the dwelling and existing highway. Reason: To ensure that the development is served by an adequate means of access.
Access and parking prior to occupation
No part of the development hereby approved shall be occupied until the access, turning area and parking spaces for the relevant occupied dwelling have been completed in accordance with the details shown on the approved plans. The areas shall be maintained for those purposes at all times thereafter. Reason: In the interests of highway safety.
Tree retention
The existing trees shown as being retained on the approved drawings shall be retained and in the event that the retained tree becomes damaged or otherwise defective due to events outside of the applicant's control the Department shall be notified as soon as reasonably practicable and remedial action agreed and implemented. Reason: To ensure that trees marked for retention are not removed, in the interests maintaining the amenities of the area and to ensure the visual impact of the development is mitigated.
Paths and cycleways surfacing
All paths and cycleways shall be fully surfaced in accordance with the phasing plan to be submitted and approved prior to commencement and retained thereafter. Reason: In the interest of Highway Safety and provide cycle access within the site.
Tree planting
All tree planting shall be carried out in accordance with the approved details, submitted in support of the application. The planting shall be carried out in the first planting and seeding season following the completion or occupation of any part of the development (whichever is the sooner,) or otherwise in accordance with a programme to be agreed. Any trees which, within a period of 5 years from their planting, die, are removed, or, in the opinion of the Department, become seriously damaged or diseased shall be replaced as is reasonably practicable or in the next planting season with others of similar size, species and number as originally approved, unless the Department gives written consent to any variation. Reason: to ensure the provision, establishment and maintenance of a reasonable standard of landscape in accordance with the approved designs
no objections
no significant negative impact upon highway safety, network functionality and/or parking
no objections to this development from a fisheries perspective
All four consultees (Highway Services HDC, Malew Parish Commissioners, DEFA Fisheries, and Highways Drainage) raised no objections to application 23/00462/B, with advisory comments on highway adoption and drainage compliance.
Key concern: surface water runoff onto public highway contravening Highway Act 1986
Highway Services HDC
No ObjectionAfter reviewing this Application, Highway Services HDC finds it to have no significant negative impact upon highway safety, network functionality and /or parking.
Conditions requested: Applicant is advised to liaise with DOI Highway Asset Teams to amend the s4 highway adoption where necessary to reflect the revised layout, and the position of access points, paths etc.
Malew Parish Commissioners
No ObjectionMalew Parish Commissioners have no objections to the following applications... 23/00462/B
DEFA Fisheries
No ObjectionDEFA, fisheries have no objections to this development from a fisheries perspective.
Highways Drainage
Conditional No ObjectionAllowing surface water runoff onto a public highway would contravene Section 58 of the Highway Act 1986 and guidance contained in section 11.3.11 of the Manual for Manx Roads.; Recommendation: Please be aware off and demonstrate compliance with the clauses above.
Conditions requested: Please be aware off and demonstrate compliance with the clauses above.