Loading document...
==== PAGE 1 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Denning Millar Projects Ltd Ballacrebbin Farm Bernahara Road Andreas Isle Of Man IM7 3HJ TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019 In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Department Of Enterprise, Ref 23/00287/B, for the Temporary TT Accommodation and associated facilities for 2023 and 2024 only at Former Prison Site Victoria Road Douglas Isle Of Man . Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes). 1. 2023 - The temporary building/s hereby approved on this site shall not be in situ before the 12th May 2023 and shall be removed from the site by the 17th June 2023. The use hereby approved shall not be in operation before the 26th May 2023 or after the 12th June 2023. The site shall be restored to its former condition within 5 days of the temporary building/s being removed. 2024 - Prior to the occupation/use of the land for the temporary TT Accommodation and associated facilities as for the 2024 TT, dates shall be submitted to and approved in writing by the Department for the 2024 TT periods which outline the setup, operation and take down periods/dates. These agreed dates shall be fully adhered too. Reason: The application has been approved as an exception to the Development Plan on the basis of need for the TT event only and for a period of two years as proposed by the application. Exact dates for the 2024 TT are not yet known. 2. Visibility splays of 2.4m x 43m in both directions to the nearside kerb line from the site access to be used as the exit shall be provided prior to first use of the development, and maintained as such unobstructed whilst the site is in use, with nothing above 1m in height within the visibility splay areas. Reason: In the interests of highway safety.
==== PAGE 2 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 3. The parking and motorcycle spaces as shown on drawing "P02 extra cabin" shall be provided and ready for use prior to the occupation of any unit and retained for such use during the temporary period/s (Outlined in C 1). Reason: to maximise the number of parking spaces that could be accommodated on the site to limit any overspill parking onto the public highway. This approval relates to the submitted documents and drawing all received on 01.03.2023. This decision has been made for the following reasons(s) It is concluded the proposal would be acceptable for a temporary period only and would not significant affect public or private amenities and comply with General Policy 2, Business Policy 11 and Transport Policy 4 of the IOM Strategic Plan 2016. Date of Issue: 11th April 2023 Director of Planning and Building Control
==== PAGE 3 ====
Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email [email protected]. Tel 01624 685950 Guidance Note This decision was made by the Planning Committee in accordance with the authority delegated to it. This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation. A copy of the Officer’s report and any correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services www.gov.im/Viewapplications) or at the Department’s offices Murray House, Mount Havelock, Douglas. Implementation The decision does not become final until either Any appeal has been concluded; or 21 days have passed since the date on this notice and no appeal has been submitted Development must progress in accordance with the plans approved under, and any conditions attached to this approval (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation. Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action. Appeal Any appeal must be in writing and submitted to the Department within 21 days of the date of this Notice. The appeal must contain: the grounds for making the appeal; payment of the planning appeal fee (currently £305); and if relevant, confirmation that the appellant wishes to have the appeal determined by means of an inquiry and payment of the additional inquiry fee (currently £115). Where the appeal is submitted by the applicant they must: specify in detail and by reference to material planning considerations the reasons why the appellant disagrees with that determination; and Where against a refusal, on the grounds of deficient detail or supporting documentation, set out why they consider the information or documentation forming part of the application was sufficient in the circumstance. If the appeal is submitted by someone who has interested Person Status but is not listed in Article 4(2) of the Development Procedure Order 2019, that person must relate their grounds for making the appeal to issues which they included in representations made prior to the application being determined. Failure to meet all of the relevant above requirements will mean that the appeal cannot be validated. An appeal form and more detailed guidance are available either from Planning & Building Control, Tel 685950, or from the Department’s website www.gov.im/planningappeal If this decision becomes final because there is no appeal, the Department’s public reference copy (counter copy) of the planning application (should one have been received) may be collected by the applicant or their agent from Murray House. Please note that if the counter copy of the application is not collected within thirty days following the last date on which a planning appeal can be made it will be destroyed without further notice.
Copyright in submitted documents remains with their authors. Request removal