**Document:** Consultation 1.1 Highway Response
**Application:** 21/00540/B — Installation of roof over existing retaining walls to form structure to house gas boiler, removal of oil tank and installation of a gas cylinder storage unit
**Decision:** Permitted
**Decision Date:** 2021-07-23
**Parish:** Lezayre
**Document Type:** consultation / highways_response
**Source:** https://planningportal.im/a/7543-lezayre-pink-house-maughold-dwelling/documents/933206

---

# Consultation 1.1 Highway Response

## Representation from the Department of Infrastructure (DOI) Highways Division–

Highway Services Comment made No Highways Interest Highways Representation history for this case.

NHI on 07.06.2021
NHI on 08.07.2021

Conditions (if any) 08.07.2021 07.06.2021 Highways Officer

SH

### Code definition

|DEFER|Highways input deferred pending further information/input|
|---|---|
|DNO|Do not oppose|
|DNOC|Do not oppose subject to condition|
|NHI|No highways interest|
|O|Oppose|

Please note that whilst the content of this memo has been completed by Officers from DOI Highways, the detail has been produced by DEFA P&BC for the benefit of the planning application file and P&BC online services.

Memo produced 14.07.2021

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/7543-lezayre-pink-house-maughold-dwelling/documents/933206*
