# APL Planning Statement

## Former Gas Storage Facility Balthane Industrial Estate

### Planning Statement

#### 1273 4.2 V.1.4 December 2019

- 1.0 Introduction 2
- 2.0 Site & Surroundings 2
- 3.0 Planning History 3
- 4.0 The Proposal 4
- 5.0 Access & Parking 5
- 6.0 Drainage 7
- 7.0 Environmental Protection 7
- 8.0 Planning Policy 8
- 9.0 Merits of the Proposal 15 Appendices

- A Decision Notice [P.A. 16/00423/A]
- B Decision Notice [P.A. 17/00378/B]
- C Statement Re Drainage & Flood Risk
- D Site Investigation Report
- E 9m Watercourse Proximity Form
- F License to Cut Down [...] Trees [№ 530/19]

HAVEN HOMES LIMITED THE OLD CHAPEL 32-34 MALEW STREET CASTLETOWN ISLE OF MAN IM9 1AF PHONE 01624 835222 EMAIL HAVEN@HAVEN.IM WEB WWW.HAVEN.IM

- 0.0 Application for Detailed Planning Approval: 11 Units For The Purposes of General Industrial or Light Industrial

or Storage and Distribution, Together With Associated Parking - at FORMER GAS STORAGE FACILITY Balthane Industrial Estate, Ballasalla, Isle Of Man IM9 2AG

- 1.0 INTRODUCTION

- 1.1 This Statement has been prepared by Haven Homes Limited (HH / the Applicant). It is intended to be read and considered in conjunction with an Application dated 20th December 2019 and all associated submissions lodged by the Applicant in support of the Application.
- 1.2 The Proposal is as described in this Statement. This may be summarised as the construction of 11 № units for the purposes of general industrial or light industrial or storage and distribution together with associated parking.
- 1.3 The Application is made for detailed planning consent for the Proposal, without prejudice to any existing statutory consents, licenses or other permissions in respect of the land contained within the Site.
- 1.4 The Application site (the Site) is as delineated in red on the submitted site plan. The Applicant is the Freehold owner of the site.

- 2.0 SITE & SURROUNDINGS

- 2.1 The Balthane Industrial Estate (BIE) is delineated on Map 4 to the Area Plan for the South (cf. §8.1). The Site is contained entirely within the boundaries of the BIE.
- 2.2 The total area of the land contained within the Site is 3575m2 (excluding the area of a 2m wide footpath of the adjacent highway), or some 0.36 hectares. when measured on a horizontal plane.
- 2.3 The Site lies on the south side of Balthane Road, some 400m south east of its junction with Douglas Road. The Site is bound:-

n) to the north-east by Balthane Road; e) to the south-east by a watercourse referred to as the

“Ronaldsburn” with a recycling facility to the far side of the watercourse operated by JCK Limited.

s) to the south-west by industrial units including a yard and offices of JCK Limited and also a residential property referred to as “The Court”; and

w) to the north-west by industrial units;

- 2.4 The Site is not within, in the vicinity of, or in a sight-line from, any Conservation Area. The Site does not contain any Registered building, nor is it in the vicinity of any Registered building.

- 2.5 The Site previously contained a LPG gas storage facility. Through changes to local gas infrastructure, the facility had become redundant with no reasonable prospect of its in situ equipment or structures being re-purposed.
- 2.6 The Site topography previously had a gradient from a low point at the south-east corner to a high point at the north-west corner with a maximum level difference of some 2.9m. The Site has extant Planning consent to level the topography (cf. §3.5) which is in the process of being exercised, including the removal of redundant structures.
- 2.7 The north-east boundary, facing the public highway, is currently a stone wall that curves in plan towards the existing entrance gates. The walls to this access each have a radius of 5.0m and the access width between the existing stone posts is 3.8m. The existing gate is approximately 11m from the edge of the carriageway of Balthane Road, and approximately parallel to it.

## 3.0 Recent Planning History

A number of applications have been submitted concerning the same Site.

### 3.1 P.A. 88/00792/B was approved for:-“Installation of two storage tanks.”

This approval was apparently exercised.

### 3.2 P.A. 96/00020/B was approved in July 1996 for:-

“Installation of 2 no. additional 24 tonne LPG storage tanks.”

This approval was apparently exercised.

### 3.3 P.A. 13/91404/A was approved in April 2014 for:-

“Approval in principle for the demolition of existing gas storage facility and erection of 11 light industrial units and associated parking.”

### 3.4 P.A. 16/00423/A was approved in August 2016 for:-

“Approval in principle for the demolition of existing gas storage facility and erection of 11 units for purposes of general industrial or light industrial or storage and distribution along with associated parking.”

This approval remains extant pursuant to its first condition and §14 of the Town and Country Planning (Development Procedure) № 2) Order 2013:-

“The development hereby approved shall be begun either before the expiration of four years from the date of this approval or before the expiration of two

years from the date of approval of the last of the reserved matters.”

Although the approval in principal remains extant, time limitation for submission of a Reserved Matters application was reached two years after the date of the approval, pursuant to the second condition. The associated Decision Notice is appended in full to this Statement (cf. Appx. A).

- 3.5 P.A. 17/00378/B was approved in August 2018 for:-

“Demolition of existing gas store, levelling of site and construction of retaining walls. Use of site for the medium term storage of site vehicles, containers and building materials.”

This approval remains extant pursuant to its first condition:-

“This approval relates to the use of the site for the storage of construction equipment, vehicles and materials until 31st December, 2027.”

The associated Decision Notice is appended in full to this Statement (cf. Appx. B). This application is currently in the process of being exercised, with much of the development (thought to have been approved under P.A. 88/00792/B and P.A. 96/00020/B) having been demolished.

- 4.0 THE PROPOSAL

- 4.1 The Proposal concerns the construction of 11 № industrial units together with requisite vehicle parking provision. The design is close to an outline scheme submitted under P.A. 16/00423/A (cf. §3.4), incorporating the retaining walls approved under P.A. 17/00378/B (cf. §3.5).
- 4.2 The 11 № units would comprise 4 types, contained within 3 separate structures, arranged around a central parking and manoeuvring area or “courtyard”:-

- a) Block A would comprise Unit №s 01 to 03 inclusive, each unit having a nett internal area of 95m2, situated close to and along the east boundary of the Site, with accesses facing westwards onto the courtyard;
- b) Block B would comprise solely Unit № 04, with a nett internal area of 113m2, situated along the south-west boundary of the Site, with a vehicular access facing eastwards onto an area of parking and a principal pedestrian access facing north onto the courtyard; and
- c) Block C would comprise Unit №s 05 to 11 inclusive situated close to and along the north-west boundary of the Site. Unit №s 05 to 09 inclusive would have a maximum nett internal area of 189m2 each (cf. §4.3), having accesses facing east onto the courtyard. Unit №s 10 and 11 would both have a nett internal area of 74m2 each with accesses facing north-west towards the highway.

- 4.3 Unit №s 05 to 09 inclusive would each have a 126m2 NIA at ground floor. Partial mezzanine floors to these units would measure up to a maximum 50% of the ground floor area below. This would give a total area of up to 189m2 NIA to those units, upon which a maximum parking provision requirement has been calculated (cf. §5.1; §8.5).
- 4.4 All three blocks A, B and C would have coated metal cladding to the roofs with uPVC or coated metal rainwater goods to complement the appearance of the cladding to the walls. The walls to both Block A and Block C would be clad in horizontally laid, coated metal cladding panels with a mid-level band in a complementary finish, to help establish a uniform appearance to the development. The walls to Block B (Unit № 04) would be partially finished with painted cement render and otherwise coated metal cladding panels, laid in a vertical orientation, to distinguish this block from the others as both a focal point and as a ‘bookend’ to the development.
- 4.5 Doors to vehicular accesses to the units (other than for Unit №s 10 and 11) would be roller shutter or sectional doors with a coated metal-face to complement the appearance of the cladding panels. Pedestrian doors to the units would be similarly finished.
- 4.6 Unit №s 01, 10 and 11 would feature glazed curtain walling in those elevations facing Balthane Road. These would be the most visible elements of the Proposal from the public highway and would be framed in uPVC or powder-coated aluminium. Due to the position and orientation of Unit №s 10 and 11, both would feature a large, openable aperture incorporated within the curtain walling system, in order to maximise the flexibility of those units in lieu of a dedicate vehicular access. These would be for infrequent use as opposed to the vehicular accesses described at §4.5 of this Statement.
- 4.7 The central parking and manoeuvring courtyard and also ancillary parking adjacent to Unit № 04, would be of impermeable hard standing, with the car parking spaces delineated in markings on the finished surface. The top finish of the hard standing will be dependent on the requirements that the various occupants and users of the units. The approval of the Application could therefore be conditioned, so that the full details of the hard standing are submitted to the Department to be discharged by written approval prior to the commencement of works.

- 5.0 ACCESS & PARKING
- 5.1 Fifty (50 №) car and van parking spaces are proposed and would be arranged according to the requirements of the Private Commercial Road type, as defined in Manual for Manx Roads (MfMR), wherein the following design parameters are given:-

- a) Entrance radii of 7.5m to 15m “depending on type of development and form / frequency of traffic movement”;

The stone wall to the north-east boundary (cf. §2.6) would be demolished. The existing entrance radii of 5.0m would be enlarged to a proposed 7.5m;

- b) Access width of 6.1m;

The existing Site entrance width of 3.8m would be widened to 6.1m. The primary access routes through the courtyard would be 6.1m wide. Where this splits into 2 routes, to either side of Block B, both routes would also have 6100mm clear width;

- c) Entrance gates 10m to 15m back from carriageway edge;

Although no entrance gates are proposed, there would be a minimum 10m of clear space from the edge of the carriageway of Balthane Road;

- d) Gradient of 5% or 1:20 maximum

The vehicular access would have a gradient of 1:24 for a length of approximately 10m from the edge of the carriageway of Balthane Road into the Site.

- e) Visibility x=2.4m, y= “refer to MfS and dependent upon target speed”;

The vehicular access is situated to the outside of a bend on Balthane Road, giving good visibility in both directions. Visibility splays are shown on the basis of x=2.4m and y=59.0m, derived from a stated Stopping Sign Distance (SSD) at 37 miles per hour, adjusted for bonnet length, as shown in Table 7.1 of MfS [Department for Transport, Manual for Streets, Thomas Telford Publishing, 2007].

- f) “For developments fronting major industrial access roads and most industrial access roads, on-site HGV manoeuvring facilities must be provided. Loading areas away from the highway are required.”

Where the two access routes meet at the centre of the courtyard, a 15m diameter clear space is provided with a further 9m × 5m adjacent reversing space given, formed by the access to Unit №s 08 and 09. Swept path analysis has been carried out by BB Consulting Engineers Limited, demonstrating the manoeuvrability of the largest vehicle type anticipated.

- 5.2 Swept path Analysis was conducted on the following vehicle type:-

11.6m Refuse Vehicle Overall Length 11,600 mm Overall Width 2,530 mm Overall Body Height 3,211 mm Minimum Body Ground Clearance 416 mm Track Width 2,530 mm Lock-to-Lock Time 4.0 seconds Kerb-to-Kerb Radii 9,950 mm

The above vehicle would be capable of manoeuvring within the Proposal by way of a three-point turn as shown in swept-path analysis provided by BB Consulting Engineers Limited.

- 5.3 Pre-application consultation was sought with Highway Services by submission of a Request for Pre-Application Advice form in August 2019. Despite a telephone call acknowledging receipt, no further correspondence has been received from Highway Services in this matter. The Applicant can only assume that Highway Services have no material objection to the Proposal.

- 6.0 DRAINAGE
- 6.1 BB Consulting Engineers Limited have prepared a separate statement regarding drainage and flood risk (cf. Appx C), upon which the Manx Utility Authority (MUA) have been consulted. The Site is not is not outlined as at risk on current flood maps issued by the MUA.
- 6.2 Surface water from the proposed units and hardstanding would be discharged into the Ronaldsburn watercourse via a bypass oil interceptor, as is required by the Department of the Environment, Food and Agriculture (DEFA) to prevent pollutants from entering the watercourse. The proposed surface water drainage system would remain private and would not be adopted.
- 6.3 Foul drainage from the Proposal would be connected into an onsite sewage treatment system, by agreement with MUA. Greater information can be found within the statement prepared by BB Consulting Engineers Limited (cf. Appx C). The proposed foul water drainage system would remain private and would not be adopted.

- 7.0 ENVIRONMENT
- 7.1 A Site Investigation Report (cf. Appx D) was previously commissioned to investigate the possibility of contamination of the Site. The assessor concludes, at page 5, that:-

“this site is not a significant contaminated area, according to the testing indicators [...] and should not be classified as Contaminated Land”

- 7.2 As the Site is within 9 metres of a watercourse, consultation previously took place with the Fisheries Directorate of DEFA during the course of the In Principal application, P.A. 16/00423/A (cf. §3.4) and no restrictions on the period of construction were required. A 9 metre proximity form is appended to this Statement in respect of the detailed Proposal (cf. Appx E).
- 7.3 The Site previously contained 14 № trees. Of those, 5 № have since been felled under license № 530/19 (cf. Appx F) to facilitate the works approved under P.A. 17/00378/B (cf. §3.5), identified as T.01 to T.05 inclusive on the submitted tree plan. Of those remaining trees, none are considered to contribute significantly to the visual amenity of the Site and, in relation to the proximate open countryside, considered to be relatively inconsequential in terms of relative ecological amenity, particularly given the previous use of the site:

- a) there are 7 № trees immediately east of the existing vehicular access which together have grown unchecked to form an area of overgrown scrub, identified as T.08 to T.14 inclusive;
- b) the other 2 № are to the west of the access but further from the Site boundary, apparently more mature but of a non-native species, identified as T.06 and T.07 on submitted plans;

Permission is expressly sought under the Application to fell the remaining 9 № trees, T.06 to T.14 inclusive, in order to facilitate the redevelopment of the Site to its full potential as zoned in the Area Plan.

- 8.0 PLANNING POLICY
- 8.1 The principal planning policy documents relating to this application are:-

- a) the “Isle of Man Strategic Plan” of 2016 (the Strategic Plan);
- b) the “Area Plan for the South” of 2012 (as amended) (the Area Plan).

- 8.2 Chapter 1 of the Strategic Plan describes the requirements for, and relationships between, the Strategic Plan and requisite Area Plans. §1.4.4 of the Strategic Plan states in full:-

“In the case of any inconsistency between the provisions of the Strategic Plan and the provisions of an Area Plan, whichever came into force later will prevail.”

The Strategic Plan came into force later than the Area Plan. The Strategic Plan prevails in the event of any inconsistency.

8.3 Strategic Plan, General Policy 2 contains 14 № subsections, which are addressed in turn:

“Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development:

- a) is in accordance with the design brief in the Area Plan where there is such a brief;

The Site is part of that land keyed on Map 4 to the Area Plan as having Industrial/Business Park land-use zoning, and is labelled “Ind”. The Site is not shown as being within any Proposal Site defined in the Area Plan Written Statement or explicitly identified on Map 3 to the Area Plan. The Site is not, therefore, the subject of a Development Brief or design brief.

- b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them;

The Proposal has been designed to employ the Site as effectively as possible in its redevelopment, and has balanced the massing and situation of blocks A, B and C (cf. §4.2) with the surrounding built and natural environment. In this respect, appropriate margins are proposed from adjacent properties and the adjacent watercourse.

- c) does not affect adversely the character of the surrounding landscape or townscape;

The character of the BIE is described, in somewhat critical terms, at §6.8.2 of the Area Plan Written Statement:-

“[...] The Estate is used by a mix of businesses but incremental development, poor maintenance of buildings, roads and footways, has over the years, resulted in the Estate appearing neglected and unattractive in many parts giving a poor impression to the public, customers and businesses alike. It is recognised that the Estate is home to some uses which are essential to support the Island and also that there is scope for the general appearance and access to the Estate to be improved. There is considerable land available at Balthane which was first identified on the 1982 Development Order. It has been deemed appropriate to carry forward this designation into the Area Plan but there is a need to secure improvement works on the Estate.”

The character of the Proposal seeks to provide a contemporary appearance where it faces the public highway by providing extensive areas of attractive glazed curtain walling (cf. §4.5). This is considered an improvement not only to the current condition of the Site itself, but also the attractiveness of the particular section of Balthane Road where it runs through the BIE.

## d) does not adversely affect the protected wildlife orlocally important habitats on the site or adjacentland, including water courses;

Environmental considerations in respect of the Ronaldsburn watercourse are set out at §7.2 of this Statement.

## e) does not affect adversely public views of the sea;

The Site is not in an elevated position relative to the surrounding landscape. The surrounding natural topography precludes views towards the sea at ground level. The Proposal cannot, therefore, be said to affect public views of the sea.

## f) incorporates where possible existing topographyand landscape features, particularly trees and sodbanks;

During the design development of the Proposal it became apparent that, given certain criteria (including quantum of parking and surface water attenuation), the position of the existing trees would considerably limited the redevelopment potential of the Site if they were to remain. As discussed previously (cf. §7.3), the trees found on the Site are not considered to add significantly to the visual amenity of the Site, nor the ecological amenity. The planning officer’s report in respect of P.A. 13/91404/A (cf. §3.3), at §6.3, notes:-

“[...] The proposal would result in the loss of some existing landscaping which fronts onto the main highway, although this is not maintained currently and does not add especially to the visual amenities of the industrial estate. The submitted layout would result in the frontage of the site being hard surfaced to be utilised for parking. Whilst this is not beneficial to the street scene, this layout is very common within the industrial estate and similar arrangement has recently been approved nearby (13/00197/B). Overall, it is considered an arrangement of units as shown would be appropriate for the site, and would potentially not unduly affect the visual amenities of the street scene.”

The Applicant concurs with the Planning officer’s findings. Moreover, the natural topography of the brown field Site has already been affected by its previous use as a gas storage facility. The Site has extant planning consent to level the Site to the topography required by the Proposal (cf. §3.5), which is also necessary for the surface water drainage strategy and the interception of pollutants from entering the Ronaldsburn.

## g) does not affect adversely the amenity of localresidents or the character of the locality;

The nearest residential property is referred to as The Court. The planning officer’s report in respect of P.A. 13/91404/A (cf. §3.3), at §6.5, notes:-

“[The Court] is a single storey bungalow located 20.8 metres to the southeast of the proposed unit 4. This unit would be the unit which would most affect the amenities of the occupants of this property. [...] There are no detail designs of the proposed units, so a full assessment cannot be made at this stage. However, it is considered the scheme as shown, with unit four siting, distance and directly facing the gable end of the property, it is considered this would not significantly affect the residential amenities (loss of light and/or overbearing impact) to warrant a refusal[...]”

The detailed design of Unit № 04 has considered the effect on residential amenity so as not to cause loss of light or otherwise an over-bearing impact through its massing.

## h) provides satisfactory amenity standards in itself,including where appropriate safe and convenientaccess for all highway users, together with adequateparking, servicing and manoeuvring space;

The proposed parking provision is set out at §5.1 and compliance with Parking Standards is set out at §8.5 of this Statement.

## i) does not have an unacceptable effect on road safetyor traffic flows on the local highways;

As discussed at §5.2(e) of this Statement, the Proposal makes use of an existing access with good visibility. Minor adjustments have been made to a design previously submitted for Approval in principle, in order accord with the relevent criteria of the MfMR, a guidance document published following the Planning applications previously made in respect of the Site. The planning officer’s report in respect of P.A. 13/91404/A (cf. §3.3), at §6.4, notes:-

“[...] Highway Services have considered the scheme in terms of parking standards, manoeuvrability of vehicles within the site and highway safety matters and have no objection to the proposal.”

As set out at §5 of this Statement, the Applicant submits that the minor adjustments made following the issuance of MfMR by the Department of Infrastructure are an improvement in terms of manoeuvrability, visibility and pedestrian safety.

### j) can be provided with all necessary services;The Site is capable of connection to all required utilities.

## k) does not prejudice the use or development ofadjoining land in accordance with the appropriateArea Plan;

All land parcels surrounding the Site have already been developed. The Proposal would not prejudice the existing uses of the surrounding land. Moreover, those already established uses of the surrounding land would not preclude the proposed use sought for the Site.

## l) is not on contaminated land or subject tounreasonable risk of erosion or flooding;

It is established that the land of the Site should not be treated as contaminated land (cf. §7.1) and that there is no flooding risk to, or otherwise arising from, the Proposal (cf. §6.1)

## m) takes account of community and personal safety andsecurity in the design of buildings and the spacesaround them;

The proposal is designed with due regard to security and personal safety. Previous concerns regarding the conflict of vehicular and pedestrian traffic have been addressed through the increased manoeuvrability space and sufficient margin from all vehicular movements to all pedestrian accesses.

## n) is designed having due regard to best practice inreducing energy consumption.

The proposal is designed with due regard to the reduction of energy consumption, with a scheme that will comply with the requirements of Building Regulations. The arrangement of the units themselves is made to maximise their versatility, with the anticipation that they be re-purposed as required for various uses during the course of their life cycle.

The proposal accords with all subsection requirements of General Policy 2.

8.4 Strategic Plan, Business Policy 5 states:

“On land zoned for industrial use, permission will be given only for industrial development or for storage and distribution; retailing will not be permitted except where either:

- (a) the items to be sold could not reasonably be sold from a town centre location because of their size or nature; or
- (b) the items to be sold are produced on the site and their sale could not reasonably be severed from the overall business; and, in respect of (a) or (b), where it can be demonstrated that the sales would not detract from the vitality and viability of the appropriate town centre shopping area.”

Area Plan, Employment Proposal 1, under §6.8.7 states:-

“All industrial uses, other than small scale light industrial uses considered to be acceptable within the Mixed Use areas, or those uses deemed appropriate by the Isle of Man Strategic Plan Business Policy 7, will be located on the Industrial Estate at Balthane and where appropriate Ronaldsway and the Freeport.”

The planning officer’s report in respect of P.A. 13/91404/A (cf. §3.3), at §7.1, concludes in its recommendation:-

“[...] it is considered that the planning application is in accordance with General Policy 2 and Business Policy 5 of the Isle of Man Strategic Plan 2007 and the Area Plan for the South [...]”

In this respect the Proposal remains unaltered. The Proposal remains compliant with Business Policy 5.

8.5 Strategic Plan, Transport Policy 7 states in full:-

“The Department will require that in all new development, parking provision must be in accordance with the department’s current standards”

The current standards are set out at Appendix 7 of the Strategic Plan. Each Type of Development gives a respective parking requirement by floor area. These include, inter alia:-

“Light industrial, research and development: 1 space per 30 square metres nett floor space.” “General industrial: 1 space per 50 square metres gross floor space.” “Storage and distribution: 1 space per 100 square metres gross floor space.” The Strategic Plan, at §9.2.3 provides the following definitions.

“‘light industrial building’ means an industrial building (not being a special industrial building) in which the processes carried on or the machinery installed are such as could be carried on or installed in any residential area without detriment to the amenity of that area by reason of noise, vibration, smell, fumes, smoke, soot, ash, dust or grit, or undue generation of traffic or parking of vehicles; the use of light industrial buildings for research and development of products or processes is permitted by the Town and Country Planning (Permitted Development) Order 2005.

‘general industrial building’ means an industrial building other than a light industrial building or a special industrial building;

‘special industrial building’ means an industrial building used for the carrying on of processes (including storage) which may be particularly offensive by reason of noise, smell, vibration, smoke, soot, ash, dust, grit, or fumes, or dangerous by reason of the storage or use of dangerous or inflammable material, or inimical to public health by reason of vermin or other causes.”

For the purposes of measuring the maximum required number of parking spaces that would be required by the Proposal, the whole of the Site is measured against the Light industrial, research and development Type of Development, or 1 space per 30m2 nett floor space, notwithstanding that General industrial and Storage and distribution uses are also sought in respect of the Proposal and that these uses have a lower parking requirement. The nett floor areas for each block stated at §4.2 of this Statement are:-

- a) 285m2 NIA in respect of Block A;
- b) 113m2 NIA in respect of Block B; and
- c) (up to) 1093m2 NIA in respect of Block C.

This gives a total nett floor area of 1491m2 and a parking requirement of 49.7 parking spaces at 1 space per 30m2 nett floor space. The parking provision is described at §5.1 and notes that 50 № car and van parking spaces would be provided. The planning officer’s report in respect of P.A. 13/91404/A (cf. §3.3), at §6.4, notes:-

“[...] Highway division have considered the scheme in terms of parking standards, manoeuvrability of vehicles within the site and highway safety matters and have no objection to the proposal.”

The proposal strictly complies with Transport Policy 7, notwithstanding that the uses sought and possible omission of mezzanine floors have the potential to reduce the actual parking provision requirement. Although there has been further amendment to the layout over that previously submitted for Approval in principle, this has been made to further improve manoeuvrability and in accordance with the street type requirements of MfMR (cf. §5), a document which has since been issued by the Department of Infrastructure.

- 9.0 MERITS OF THE PROPOSAL
- 9.1 The Proposal would realise the land use zoning proposed in the Area Plan and maximise the efficient use of the land whilst complying with current regulatory criteria.
- 9.2 The proposed external appearance of the buildings is compatible with the surrounding area and existing built environment yet enhancing the streetscape, in accordance with the stated objectives of the Area Plan in an area cited for its current substandard appearance.
- 9.3 The Proposal makes careful consideration of the surrounding natural environment and makes provisions for its protection, both in the Proposal’s construction and use.
- 9.4 The Proposal sets out detailed matters in respect of a previous In Principal application, for which consent remains extant. The Proposal also complies with a later extant approval for the demolition of redundant structures and levelling of the Site, which has commenced.
- 9.5 Following marketing efforts by the Applicant, the Proposal has garnered significant interest from prospective purchasers and end-users, a strong indication of the Proposal’s potential benefit to the local economy both for the duration of its construction and during its subsequent occupation by end users.

## Appendix A Decision Notice 16/00423/A

Hugh Logan Architects Bridge Court 10 Bridge Street Castletown

TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013

In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Haven Homes Ltd, Ref 16/00423/A, for the Approval in principle for the demolition of existing gas storage facility and erection of 11 units for purposes of general industrial or light industrial or storage and distribution along with associated parking, at Former Gas Storage Facility Balthane Road Balthane Industrial Estate Balthane Ballasalla Isle Of Man IM9 2AG subject to compliance with the following condition(s) and notes (if any) :

- 1. The development hereby approved shall be begun either before the expiration of four years from the date of this approval or before the expiration of two years from the date of approval of the last of the reserved matters.

Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013.

- 2. Application for approval of the reserved matters shall be made to the Department before the expiration of two years from the date of this approval and thereafter the development shall only be carried out in accordance with the details as approved. Reason: To avoid the accumulation of unimplemented planning approvals.
- 3. Details of the siting, design, external appearance, internal layout, means of access and landscaping; (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the Department before any development is commenced and thereafter the development shall only be carried out in accordance with the details as approved.

Reason: To comply with the Town and Country Planning (Development Procedure)(No2) Order 2013.

- 4. Prior to any development commencing, a survey shall be undertaken to establish whether or not there has been any contamination on the site and if any is found, a method statement of how and when the contamination is to be removed or contained shall be submitted to and be approved in writing by the Department and its recommendations carried out.

Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and

Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email planning@gov.im. Tel 01624 685950

ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

The development hereby approved relates to the Planning and Design Statement and Drawings 1273/001J and 1273/002, all three date-stamped as having been received 14th April 2016.

Date of Issue: 9th August 2016

## Interim Director of Planning and Building Control

Guidance Note

This decision was made by the Planning Committee in accordance with the authority delegated to it in the name of the Minister and/or in the name and on behalf of the Department.

This permission refers only to that required under the The Town and Country Planning (Development Procedure)(No 2) Order 2013.

Any appeal against this decision must be in accordance with the criteria set down in that instrument.

Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:

-  Payment of a planning appeal fee as prescribed in the Town and Country Planning (Application and Appeal Fees) (No2) Order 2015 (currently £165);
-  The reasons for making the appeal; and
-  An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation.

An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planningapplications/planning-appeals/how-to-appeal/

No development may be undertaken until such time as the relevant reserved matters have been approved by the Planning Authority.

If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.

A copy of the Officer’s report and any correspondence which led to the assessment and decision is now available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas.

https://www.gov.im/planningapplication/services/planning/search.iom

Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.

Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email planning@gov.im. Tel 01624 685950

## Appendix B Decision Notice 17/00378/B

Hugh Logan Architects Bridge Court 10 Bridge Street Castletown

TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013

In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Haven Homes Ltd, Ref 17/00378/B, for the Demolition of existing gas store, levelling of site and construction of retaining walls. Use of site for the medium term storage of site vehicles, containers and building materials at Former Gas Storage Installation Balthane Industrial Estate Balthane Ballasalla Isle Of Man IM9 2AG subject to compliance with the following condition(s) and notes (if any):

- 1. This approval relates to the use of the site for the storage of construction equipment, vehicles and materials until 31st December, 2027. Reason: the application seeks permission for the temporary use of the site only.
- 2. The height of stored material may not exceed 5.2m in height.

Reason: to control the height of stored material in the interests of the visual amenities of the area.

- 3. Prior to the site levelling works or the retaining wall hereby approved being commenced, a method statement detailing how those works shall be undertaken shall be submitted to and approved in writing by the Department.

Reason: to allow DEFA to provide advice on a suitable approach, in order to reduce the possibility of injury or disturbance of fish downstream of the proposed site in the Ronaldsburn stream and coastal ASSI.

The development hereby approved relates to Drawings 01, 1273-000 and 1273-110A, all date-stamped as having been received 3rd April 2017.

Date of Issue: 15th August 2018

## Director of Planning and Building Control

Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email planning@gov.im. Tel 01624 685950

Guidance Note

This decision was made by a Principal Planner in accordance with the authority delegated to them.

All correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas.

https://www.gov.im/planningapplication/services/planning/search.iom This decision refers only to that applied for under the The Town and Country Planning (Development Procedure)(No 2) Order 2013.

Any appeal against this decision must be in accordance with the criteria set down in that instrument.

Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:

-  Payment of a planning appeal fee as prescribed in the Town and Country Planning (Application and Appeal Fees) (No2) Order 2016 (currently £175);
-  The reasons for making the appeal; and
-  An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation.

An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planningapplications/planning-appeals/how-to-appeal/

If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.

## Pleasenote thatifthe counter copy of theapplicationisnotcollectedwithinTHIRTY DAYS following the last date on which a planning appeal can be made it will be destroyedwithout further notice.

Department of Environment Food and Agriculture, Planning & Building Control Directorate, Murray House, Mount Havelock, Douglas, Isle of Man, IM1 2SF. Email planning@gov.im. Tel 01624 685950

## Appendix C

Statement Re Drainage and Flood Risk Prepared by BB Consulting Engineers Limited

19-110 – Proposed Light Industrial / Commercial Units, Former Gas Storage Facility, Balthane Industrial Estate, Ballasalla, Isle of Man Proposed Light Industrial / Commercial Units, Former Gas Storage Facility, Balthane Industrial Estate, Ballasalla, Isle of Man Planning Statement Relating to Drainage and Flood Risk

## 1. Introduction

1.1. This statement has been prepared by BB Consulting Engineers in support of a planning application for the proposed redevelopment of the former gas storage facility at Balthane Industrial Estate, Ballasalla, Isle of Man. This statement covers the foul drainage, surface water drainage and flood risk.

## 2. Site Description

- 2.1. The site is located within Balthane Industrial Estate, the site location is outlined on the Architectural drawings. The site is brownfield, and has previously been utilised as a gas storage facility.
- 2.2. The proposed redevelopment will create 11 light industrial / commercial units within 3 separate blocks. The external areas are to be hard paved to allow for access and parking.
- 2.3. The local topography has a general fall from west to east. The proposed site is to be relatively flat and the finished levels generally lie above the existing.
- 2.4. The existing site is not served by public surface or foul water drainage connections.
- 2.5. The site is not outlined as at risk on the Isle of Man Flood Maps, issued by the Manx Utilities Authority (MUA).
- 2.6. There is considered to be no flooding risk to the proposed development site from the eastern boundary stream within the parameters agreed with MUA.

19110-191108-nq-PlanningDrainage&FloodRiskStatement

19-110 – Proposed Light Industrial / Commercial Units, Former Gas Storage Facility, Balthane Industrial Estate, Ballasalla, Isle of Man

## 3. Foul Drainage

- 3.1. The proposed layout and topography of the site permits the use of a gravity foul drainage system.
- 3.2. The proposed foul drainage system is outlined for connection in to a treatment plant with final discharge in to the Ronaldsburn. The discharge consent and associated permissible effluent quality levels of the treatment plant will be agreed with the Department for Environment Food & Agriculture prior to detailed design.
- 3.3. The discharge in to the Ronaldsburn it to be facilitated through the use of a reinforced concrete head wall. The outlet is to be located at the south east corner of the site.
- 3.4. The foul drainage system is outlined to remain in private ownership.
- 3.5. Refer to BB Consulting drawing 19110/50 for an outline drainage layout.

## 4. Surface Water Drainage

- 4.1. The proposed layout and topography of the site permits the use of a gravity surface water drainage system.
- 4.2. The surface water flow will be attenuated within a cellular storage tank located beneath the hardstanding of the development site.
- 4.3. The outflow from the attenuation tank will be at a rate of 2.52l/s. This discharge rate is based on an equivalent greenfield runoff rate of 7l/s/ha over an area of 0.36Ha. the greenfield runoff rate is in accordance with MUA requirements.
- 4.4. The attenuated flows are to discharge in to the Ronaldsburn.
- 4.5. A by-pass oil interceptor is to be installed up stream of the attenuation tank.
- 4.6. The discharge in to the Ronaldsburn it to be facilitated through the use of a reinforced concrete head wall. The outlet is to be located at the south east corner of the site.
- 4.7. The surface water drainage system is outlined to remain in private ownership.
- 4.8. Refer to BB Consulting drawing 19110/50 for an outline drainage layout.

19110-191108-nq-PlanningDrainage&FloodRiskStatement

19-110 – Proposed Light Industrial / Commercial Units, Former Gas Storage Facility, Balthane Industrial Estate, Ballasalla, Isle of Man

## Flood Risk Assessment

- 4.9. The site is not outlined as at risk on the Isle of Man Flood Maps, issued by the MUA. Reference is made to extract below. Extract taken from of MUA Mapping: Roaldsburn, map 1 of 1 version1 (https://www.manxutilities.im/media/1607/ronaldsburn_1.pdf).

- 4.10. Cross-sections of the eastern boundary stream have been undertaken and are located within Appendix A.
- 4.11. The design storm event as agreed with the MUA is a 1 in 100 year event plus a 20% allowance for climate change.
- 4.12. An assessment using the FEH CD-ROM 3 analysis tool and the data provided by the MUA has been made in order to assess the flood flow within the eastern boundary stream catchment. The flow has been calculated at 1.45m3/s.
- 4.13. The Manning's equation has been utilised to calculate projected flood flow levels within the stream adjacent to the site and the output is located within Appendix B. The calculations indicate no fluvial flooding of the proposed site.

19110-191108-nq-PlanningDrainage&FloodRiskStatement

![A site location plan showing a specific plot of land highlighted in red, situated near a stream and road network.](https://images.planningportal.im/2021/03/6802146.png)

19-110 – Proposed Light Industrial / Commercial Units, Former Gas Storage Facility, Balthane Industrial Estate, Ballasalla, Isle of Man

- 4.14. An average slope has been used in the calculation of the flood flow between cross-sections 4 and 8 of the survey due to a flattening in the streams slope in this area. Site observations have shown that there is no impedance of flow along the length of the ditch.
- 4.15. There is considered to be no flooding risk to the proposed development site from the eastern boundary stream within the parameters agreed with MU. This is demonstrated within the calculated output held within Appendix B.
- 4.16. It is considered that the proposed development has no adverse flood risk impact on any other areas within the parameters agreed with MU.
- 4.17. The proposed FFL of Unit C (adjacent to the Ronaldsburn) is to be 18.75m. This level provides an approximate freeboard of 1.00m on the calculated 1in100 + 20% flood flow level which has been calculated at 17.75m.

Prepared by BB Consulting Engineers Limited 10 Myrtle Street, Douglas IM1 1ED October 2019 Ref 19-110

19110-191108-nq-PlanningDrainage&FloodRiskStatement

19-110 – Proposed Light Industrial / Commercial Units, Former Gas Storage Facility, Balthane Industrial Estate, Ballasalla, Isle of Man Proposed Light Industrial / Commercial Units, Former Gas Storage Facility, Balthane Industrial Estate, Ballasalla, Isle of Man Planning Statement Relating to Drainage and Flood Risk December 2019 Appendix A Drawings

- 1507i/01 IoM Groundmodels - Measured Survey
- 1507i/02 IoM Groundmodels - Sections 13-089/SK01 Catchment Overview

19110-191108-nq-PlanningDrainage&FloodRiskStatement

## Appendix D Site Investigation Report

|Report cTas / 1665 / 15 SITE INVESTIGATION REPORT<br><br>GAS STORE, BALTHANE May 2015|
|---|

## Construction Testing & Advisory Services

6 Bowring Road Ramsey Isle of Man IM8 2LQ Email: ctas@wimanx.net

Contents: Title Page Contents 2 Introduction 3 General Introduction 4 Factual Description and Conclusions 5 Existing Site Plan 6 Proposed Site Plan 7 Logs of Trial Pit 1 8 Logs of Trail Pit 2 9 Logs of Trial Pit 3 10 Chemical Analysis sample 5483 11 Chemical Analysis sample 5482 12 Ordnance Survey Maps - 1975 13

- - 1968 14
- - 1868 15

Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 2 of 15

Introduction

Name of Contract:

Site Investigation, Gas Store Site, Balthane on the Isle of Man Client:

Haven Homes Limited Douglas Isle of Man

Description of Site:

Mainly level site with mounded earth structure around a horizontal gas storage tank Main Works Proposed and Purpose of this Report:

Site investigation on ground conditions with contamination observations Scope of Investigation:

Trial hole investigation with On-Site and laboratory Testing and analysis and research into previous uses and possible risks to further works Geology and Ground Conditions:

Bed rock SWIL –Skillicore Member, Packstone, siltstone and fine-grained sandstone; C21m, part of the Derbyhaven Formation (DBH), Packstone and grainstone with minor mudstone. Great Scar Limestone Group.

Overlaying soil type– glacially deposited boulder clay layered with sand and gravel Schedule of Drawings and Documents:

Historic maps and proposed development

Particular Restrictions:

Not applicable Particular General:

Not applicable

Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 3 of 15

General Introduction:

## General

The comments given and the opinions expressed in this report are based on the soil conditions encountered, and in published research journals . There may, however, be special conditions obtaining at the site which have not been disclosed by this information and which have not been taken into account in this report.

The comments on ground-water conditions given in the records are based on observations made during the excavation of the Trial pits. It should be noted, however, that ground water levels vary due to seasonal or other effects.

## Sources of information and Standards used.

The Geology of the Isle of Man - Trevor Ford, David Burnett & David Quirk Geological Memoirs - GW Lampugh The Isle of Man Celebrating a Sense of Place: Late glacial & Postglacial Environmental History

- - McCarroll, Garrad & Dackombe A New History of the Isle of Man Volume 1 and Volume 4
- - Richard Chiverrell & Geoffrey Thomas

Solid & Drift Geological Map—British Geological Survey Geology of the Isle of Man and its Offshore Area—British Geological Survey Isle of Man Street Guide—Ocean Publishing Google Earth Ordnance Survey Maps

Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 4 of 15

Factual Description

Information obtained about this site situated on Balthane Industrial Estate, Ballasalla, Isle of Man, shows that up until the 1970’s the land was used for agriculture.

A small stream runs along the east boundary of the site.

In the late 1970’s early 80’s the fields were included in to the Industrial Estate and zoned for light industrial use. This is when the gas company obtained the land for the storage of bulk gas.

During the excavations of the trial holes insitu testing was carried out to determine the California Bearing Ratio, CBR, values at depths which should be able to support the foundations of the proposed structures.

Samples were also taken for chemical analysis to determine any possible contamination or possible sulphate attack of buried concrete. These sample results are shown on pages 11 and 12 of this report. No comments can be made by cTas about weather these results are acceptable to planning or not as the ‘standard of safety factors’ was withdrawn some years ago, so it is now down to the planning department of the Isle of Man as to the suitability of the site for further development.

Conclusions

In the UK the term contaminated land has a legal definition to define circumstances where such land is causing or has the potential to cause significant harm to human health or other relevant receptor or significant pollution of surface waters and/or groundwater. Other terms such as ‘land affected by contamination’ and ‘land contamination’ are often then applied to describe the more general category of land where contaminants are present but usually not at a sufficient level of risk that such land could be classified as ‘contaminated land’ under the legal definition.

In 2002 the ICRLL Trigger Levels (59/83) was withdrawn by Defra, there is no other list currently available.

The results recorded in pages 11 and 12 of this report indicate that the values observed are below those reported in the Trigger Levels List.

Therefore, in my opinion, this site is not a significant contaminated area, according the testing indicators reported in this report to that Standard, and should not be classified as ‘Contaminated land’.

Duncan Robertson

Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 5 of 15

Existing Site Plan with positions of Trial Pits

TP 2

TP 1

TP 3

Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 6 of 15

![A site plan showing the proposed layout for industrial units with a watercourse boundary and tree preservation areas.](https://images.planningportal.im/2021/03/6802156.png)

Proposed Site Layout

.

Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 7 of 15

![Site plan showing the layout of 11 industrial units, parking spaces, and a stream boundary marked in blue.](https://images.planningportal.im/2021/03/6802158.png)

## Trial Pit 1

[Table omitted in markdown export]

|Depth metres|Level<br><br>Samples|Thickness metres|Description of Strata|Depth|
|---|---|---|---|---|
|Ground Level 0.65| |0.65|Grassed top soil, loamy Sand with a little coarse to fine angular gravel<br><br>Made Ground|0.65|
|0.70| |0.05|Loose brown medium - fine Sand|0.70|
|1.70| |1.00|Dense dark drown loamy coarse - fine angular Gravel with some cobbles<br><br>Made Ground|1.70|
|1.80| | |Large boulder or bedrock|1.80|
| | | |End of Hole| |

Log not to scale Hole remained DRY during excavation.

## Trial Pit 2

[Table omitted in markdown export]

|Depth metres|Level<br><br>Samples|Thickness metres|Description of Strata|Depth Metres|
|---|---|---|---|---|
|GL<br><br>0.50| |0.500|Grassed top soil, loamy Sand with a little coarse to fine angular gravel<br><br>Made Ground|0.50|
|0.80<br><br>1.10|CBR 7%|0.600|Firm brown/gray fine sandy Silt with coarse to fine angular to sub-rounded gravel|1.10|
|2.30 2.50| |1.400|Soft gray fine sandy Silt with a little coarse to fine rounded to sub-rounded gravel With soft gray Clay lenses 20 to 50mm thick<br><br>Becomes Damp at 2.30 m|2.50|
| | | |End of hole| |

Log not to scale Hole remained DRY during excavation. Water level observations while hole left open Time Depth ‘0958 Damp ‘1021 2.35 m ‘1030 2.35 m

## Trial Pit 3

[Table omitted in markdown export]

|Depth metres|Level<br><br>Samples|Thickness metres|Description of Strata|Depth metres|
|---|---|---|---|---|
|GL 0.55<br><br>0.90<br><br>2.10|D5482<br>D5483 CBR 10%<br>D5484<br>|2.100|Loose medium to coarse rounded to subrounded gravels over lying Firm brown clayey Sand and Gravel with a trace of cobbles<br><br>Made Ground|2.10|
| | | |End of hole Large boulder or Bed rock<br><br>(Red Sandstone)| |

Log not to scale Hole remained DRY during excavation

Chemical Analysis of Sample D5483

|pH| |7.33|@25oC|
|---|---|---|---|
|Conductivity| |58.8|@25oC|
|Dissolved oxygen|O|8.09|Mg/l|
|Oxygen saturation|O|95|%|
|Chemical oxygen demand|O|13|Mg/l|
|Alkalinity|HCO3|12.8|Mg/l|
|Hardness|CaCO3|17.4|Mg/l|
|Sodium|Na|4.57|Mg/l|
|Potassium|K|< 0.50|Mg/l|
|Magnesium|Mg|0.66|Mg/l|
|Calcium|Ca|5.87|Mg/l|
|Ammonium|NH4|0.025|Mg/l|
|Chloride|Cl|2.94|Mg/l|
|Nitrite|NO2|< 0.05|Mg/l|
|Nitrate|NO3|7.76|Mg/l|
|Phosphate|PO4|< 0.07|Mg/l|
|Sulphate|SO4|5.16|Mg/l|
|Lead|Pb|< 5|µg/l|
|Copper|Cu|< 20|µg/l|
|Zinc|Zn|53.5|µg/l|
|Iron|Fe|< 20|µg/l|
|Manganese|Mn|< 5|µg/l|
|Cadmium|Cd|< 0.5|µg/l|
|Chronium|Cr|< 5|µg/l|
|Nickel|Ni|< 5|µg/l|

NB: All results none accredited, done on a water extract 1:10 ratio

[Table omitted in markdown export]

Chemical Analysis of Sample D5482

|pH| |7.84|@25oC|
|---|---|---|---|
|Conductivity| |99.5|@25oC|
|Dissolved oxygen|O|7.81|Mg/l|
|Oxygen saturation|O|91|%|
|Chemical oxygen demand|O|28|Mg/l|
|Alkalinity|HCO3|27.1|Mg/l|
|Hardness|CaCO3|34.6|Mg/l|
|Sodium|Na|9.95|Mg/l|
|Potassium|K|1.43|Mg/l|
|Magnesium|Mg|1.59|Mg/l|
|Calcium|Ca|11.2|Mg/l|
|Ammonium|NH4|0.102|Mg/l|
|Chloride|Cl|3.49|Mg/l|
|Nitrite|NO2|0.12|Mg/l|
|Nitrate|NO3|7.12|Mg/l|
|Phosphate|PO4|0.19|Mg/l|
|Sulphate|SO4|9.35|Mg/l|
|Lead|Pb|< 5|µg/l|
|Copper|Cu|< 20|µg/l|
|Zinc|Zn|70.2|µg/l|
|Iron|Fe|124|µg/l|
|Manganese|Mn|8.3|µg/l|
|Cadmium|Cd|< 0.5|µg/l|
|Chronium|Cr|< 5|µg/l|
|Nickel|Ni|5.3|µg/l|

NB: All results none accredited, done on a water extract 1:10 ratio

[Table omitted in markdown export]

Ordnance Survey map - Sheet SC26NE

Proposed Site

Date of map: 1975 Scale 1:10560

![A black and white site location map showing the area around Ballasalla Station and Ballasalla House, with a red label indicating the 'Proposed Site'.](https://images.planningportal.im/2021/03/6802160.png)

![A black and white location map showing the proposed development site near Ballasalla Station and surrounding rural area with field boundaries and roads.](https://images.planningportal.im/2021/03/108948.jpg)

Ordnance Survey map - SC2869

Proposed Site

Date of Map 1968 Scale 1:2500

Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 14 of 15

![A site plan showing the proposed development area labeled 'Proposed Site' within the Baltane Industrial Estate and surrounding areas like Baltasalla.](https://images.planningportal.im/2021/03/6802162.png)

![A site plan showing the location of a proposed industrial development within the Baltane Industrial Estate near Ballasalla, highlighting the proposed site and surrounding roads.](https://images.planningportal.im/2021/03/108950.jpg)

Ordnance Survey map - Malew XVI.8 Sheet 166 Date of map 1868/9 Scale 1:2500 Report cTas/ 1665/15 Gas of Gas Store, Balthane Page 15 of 15

![A cropped section of a site location map or OS map extract showing property boundaries, building footprints, and vegetation near 'Balthane' and 'The Sycamores'.](https://images.planningportal.im/2021/03/6802164.png)

## Appendix E 9m Watercourse Proximity Form

## Department of Environment, Food and Agriculture Rheynn Chymmyltaght, Bee as Eirinys

### 

   

  

|TBC|
|---|

Former Gas Storage Facility, Balthane Road, Balthane Industrial Estate, Ballasalla, Isle Of Man IM9 2AG



     No alterations to the watercourse are proposed

 



 

 

Previous consultation with DEFA has resulted in a proposal to divert surface water from the site into the watercourse. A petrol interceptor was agreed to be incorporated to prevent pollutants from entering the watercourse.

     



 

                 

Not known at present and subject to obtention of statutory approvals.

 



 

 

These materials are required throughout the development. Waste materials will be disposed of in skips, allocated specifically for this purpose, for removal from the site. All mixing works are to be untertaken far away from the watercourse.

     



 

                                

     

All hazardous liquid products will be appropriately contained. These containers will be disposed of in skips, allocated specifically for this purpose, for removal from the site.



 

   

Washings of plant and cement mixers will be carried out on concrete wash-down areas allocated specifically for this purpose. Washings will be left to cure and will be disposed of in skips, for removal from the site.

     

 

   

The bank of the watercourse will be protected during works to prevent any such material from entering the watercourse.

   

 

                     

   

All operatives will be educated of the risks when they are inducted onto site, prior to the commencement of construction works.

 

 

    JAMES QUAYLE 01624 835222   

---

   

- •  
- •  

- •  

- •   

 

EUAN CRAINE

 

 

                 

## Appendix F Felling License No. 530/19

Haven Homes
c/o Mr James Quayle
The Old Chapel
Malew Street
Castletown
IM9 1AF

## Tree Preservation Act 1993

### Licence To Cut Down Or Undertake Work On Registered Trees

In exercise of the powers conferred by section 5 of the Tree Preservation Act 1993 the Department of Environment, Food and Agriculture hereby grant to you licence to undertake the work specified in the schedule below. The work authorised by this licence shall be carried out as detailed in your application and as qualified by the conditions set out below.

This licence expires at the end of 2 years beginning with the date specified below and the authorised work shall not be carried out more than once within this time, unless authorised by a further grant of licence.

#### Schedule:

**Location of trees:** Balthane Industrial Estate, Balthane, Ballasalla, IM9 2AG

**Conditions (failure to comply is an offence under the Act):**

________________________________________________________

Date: 18 September 2019
Head of Forestry, Amenity & Lands
Page 1 of 2

[Table omitted in markdown export]

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/7320-malew-gas-storage-installation-balthane-industrial-removal-condition-6/documents/930764*