**Document:** Decision Notice
**Application:** 15/00172/B — Creation of woodland centenary park incorporating a nature trail, memorial garden, ponds, tree planting and implement shed
**Decision:** Permitted
**Decision Date:** 2015-04-24
**Parish:** Onchan
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/5709-onchan-hillberry-woodland-centenary-park/documents/915802

---

# Decision Notice

Onchan District Commissioners 79 Main Road Onchan IM3 1RD

TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013

In pursuance of powers granted under the above Act and Order the Department of Infrastructure determined to APPROVE an application by Onchan District Commissioners, Ref 15/00172/B, for the Creation of woodland centenary park incorporating a nature trail, memorial garden, ponds, tree planting and implement shed at Field 534102 & 534103 Hillberry Onchan Isle Of Man subject to compliance with the following condition(s):

- 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.

Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.

- 2. No development shall take place until full details of soft landscaping works have been submitted to and approved in writing by the Planning Department and these works shall be carried out as approved. Details of the landscaping specifically relate to details of new landscaping around the new container hereby approved. All planting, seeding or turfing comprised in the approved details of landscaping must be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the container, whichever is the sooner. Any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species. Reason: To ensure the provision of an appropriate landscape setting to the development.

This approval relates to drawings reference numbers 001, 002 and 003 all received on 18th February 2015.

Date of Issue: 24th April 2015

## Director of Planning and Building Control

Guidance Note

This decision was made by the Head of Development Management in accordance with the authority delegated to her in the name of the Minister and/or in the name and on behalf of the Department.

This permission refers only to that required under the The Town and Country Planning (Development Procedure)(No 2) Order 2013.

Any appeal against this decision must be in accordance with the criteria set down in that instrument.

Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:

-  Payment of a planning appeal fee as prescribed in an order made by the Department under Section 1(1) of the Fees and Duties Act 1989 (currently £150);
-  The reasons for making the appeal; and
-  An election to have the appeal conducted by means of an inquiry (a hearing) or by means of written representation.

An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website http://www.gov.im/categories/planning-and-building-control/planning-developmentcontrol/planning-appeals/how-to-appeal/

The proposed development must not be commenced until either;

-  The time for requesting an appeal has expired; or
-  Any appeal has been determined;

Whichever is the later.

If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.

Whilst a copy of the Officer’s report which led to the decision is now available to view via the Departments website, link below, all other correspondence relative to the application is available for inspection at the Department.

https://www.gov.im/planningapplication/services/planning/search.iom

Please note that if the counter copy of the application is not collected within THIRTY DAYS following the last date on which a planning appeal can be made it will be destroyed without further notice.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/5709-onchan-hillberry-woodland-centenary-park/documents/915802*
