**Document:** 15 Tree Protection Plan
**Application:** 26/10060/AIR — Information in relation to Condition 4 of PA 25/90247/B detailing tree protection and replacement planting
**Decision:**
**Decision Date:**
**Parish:** Onchan
**Document Type:** report / tree_report
**Source:** https://planningportal.im/a/130841-onchan-woodland-heights-ashley-replacement/documents/1594418

---

# 15 Tree Protection Plan

Woodland Heights
118
118.5
117.5
113
113
112.5
113
114
114.5
115
115.5
116
116.5
117
117.5
118
116.56
116.34
116.29
116.48
116.59
116.45
119.74
BE
118.95
BE
116.99
BE
123.37
BR
121.33
BR
118.73
BR
BTP
117.41
118.08
118.50
118.62
113.38
113.49
113.58
113.65
113.71
G
G
G
G
IC
113.11
IC
114.28
MH
HOT TUB
113.25
PC
0.1DIA DUCT
F
RWP
RWP
RWP
RWP
RWP
113.32
113.30
113.80
114.17
114.22
114.30
114.33
114.27
114.20
113.85
MS
DEAD
DEAD
STUMP
114.41
TH
114.42
TH
112.99
113.45
113.29
113.10
112.99
112.94
113.19
113.11
115.13
114.41
113.27
112.95
113.20
111.98
111.98
112.15
112.98
112.88
112.97
113.06
113.08
113.04
113.06
112.82
112.76
112.39
112.26
112.09
112.21
112.18
115.94
113.23
113.82
115.31
115.84
115.96
EXPOSED UG CABLE
115.63
115.64
115.74
116.00
IC
115.81
114.90
115.39
114.66
115.18
113.21
113.10
112.88
112.71
112.56
112.44
112.48
112.56
113.42
113.49
113.60
113.67
113.78
113.74
113.94
114.26
FFL
116.54
114.83
114.34
114.26
113.99
114.52
115.10
115.76
115.93
115.26
114.73
114.17
113.01
116.77
114.82
116.15
115.69
114.98
114.35
114.68
116.02
113.85
113.65
113.42
113.27
113.20
113.17
113.36
113.18
116.50
116.31
116.09
114.51
116.87
116.41
116.34
116.80
117.10
117.04
116.61
114.11
IC
113.14
113.32
117.29
117.35
117.26
118.08
118.32
118.42
118.64
119.04
118.57
118.44
118.23
117.47
117.18
117.16
117.41
117.54
117.91
118.22
118.20
117.83
117.47
117.36
117.45
116.57
113.82
113.23
113.07112.98
116.71
112.13
0.235W
115.58
115.62
115.64
115.79
114.33
114.89
114.76
114.43
114.31
114.29
112.15
112.16
112.18
112.36
112.51
112.93
115.83
WT
113.96
WT
114.08
WT
115.83
WT
116.80
WT
116.60
WT
116.39
WT
117.46
115.91
SHED
116.43
114.64
112.43
113.29
113.01
112.42
112.33
112.26
114.54
114.58
114.64
114.29
114.07
STN01 115.801
STN02 112.338
0.1DIA DUCT
MP
ELECTRIC
8.205
18.925
3.00
Job No:
Drawing No:
Rev:
Drawing Title:
Scale @ A1
Status
Job Title:
CJ Design Limited
10 Ballaterson Road,
Peel. IM5 1BJ    Tel: 426277
carljenk@manx.net
Client:
Boundary lines have been based on site dimensions taken during Survey. Exact
location of boundaries to be agreed with neighbours and land owner prior to
commencement of works and relevant permissions obtained.
© This drawing is copyright of CJ Design Limited and cannot be reproduced
without written permission.
All dimensions and angles are to be checked on-site prior to commencement of
works and any discrepancies to be reported to Technician immediately. Drawings
have been produced for Building Regulation submission and may not cover all
construction details. Should any variation in element construction be found to be
different to that assumed on the drawings and in these notes, report immediately
to Technician for further instruction.
Original Size
A1

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/130841-onchan-woodland-heights-ashley-replacement/documents/1594418*