**Document:** Approval Notice 08/01001/A
**Application:** 08/01001/A — Approval in principle to erect a dwelling
**Decision:** Permitted
**Decision Date:** 2008-07-31
**Parish:** Lezayre
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/85514-lezayre-land-opposite-ballachree-dwelling/documents/1567998

---

# Approval Notice 08/01001/A

## Isle of Man Town and Country Planning Act 1999

### The Town and Country Planning (Development Procedure) Order 2005

Mr Hugh Logan
Bridge Court
10 Bridge Street
Castletown

In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Mr & Mrs A Kermode
**Proposal:** Approval in principle to erect a dwelling
**at:**
- Land Opposite
- Ballachree Cottage
- Churchtown
- Ramsey
- Isle Of Man

which was considered on 29th July 2008, subject to compliance with the conditions specified below.

**Date of Issue:** 31st July 2008

**Murray House Mount Havelock Douglas**
*(Signature)*

**Deputy Secretary Planning Committee**
*(Signature)*

### Schedule Of Conditions:

1. This approval is in principle only and will remain valid for a period of two years within which time no development may take place until such time as details of the reserved matters (siting, design, external appearance, internal layout, means of access, landscaping) have been approved by the Planning Authority. Such reserved matters should form the subject of a single application.

2. This approval relates to the replacement of the existing dwelling Ballachree Cottage with a new dwelling as proposed in the submitted documents and drawing 1145-00 all received on 14th May 2008.

3. The details submitted under Condition 1 above must include details of the timing of the demolition of the existing dwelling, Ballachree Cottage, the removal of all demolition material and the reinstatement of the site to garden area.

This decision was made by the Director of Planning and Building Control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.

---

### Guidance Note

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan/applications/decision.xml

Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

No development may be undertaken until such time as the relevant reserved matters have been approved by the Planning Authority.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/85514-lezayre-land-opposite-ballachree-dwelling/documents/1567998*