**Document:** Planning Approval Decision Notice
**Application:** 08/01042/B — Temporary operation of a mobile asphalt plant
**Decision:** Permitted
**Decision Date:** 2008-08-18
**Parish:** Malew
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/85483-malew-old-turkeyland-quarry/documents/1556502

---

# Planning Approval Decision Notice

## Isle of Man Town and Country Planning Act 1999

### The Town and Country Planning (Development Procedure) Order 2005

**Dalgleish Associates Ltd** 1 Sinclair's Street Cathedral Square

Dunblane

FK15 0AH

In pursuance of powers granted under the above Act and Order the PLANNING COMMITTEE of the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:

**Name:** C Kniveton Ltd **Proposal:** Temporary operation of a mobile asphalt plant at: Old Turkeyland Quarry, Balthane Road, Balthane, Ballasalla, Isle Of Man which was considered on 14th August 2008, subject to compliance with the conditions specified below. **Date of Issue:** 18th August 2008 **Murray House** **Mount Havelock**

**Douglas**

**Secretary to the Planning Committee**

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This permission relates to the temporary operation of an asphalt plant as shown and described in the information and plans reference FIG 01 - 06 inclusive all received on 21st May, 2008.

3. Operation of the asphalt plant in the evening and at night (1900 - 0700 hrs) shall only be for production of asphalt for the construction of the Ronaldsway Airport Runway End Safety Area excluding taxi ways etc.

08/01042/B

4. The specific level of the noise emitted from the asphalt plant site shall not exceed LAeq, 1 hour (free field) 47 dB at Ballawoods and 39 dB at Ballahick Farm.

The noise measurement shall be made according to BS 4142:1997.
5. Upon completion of the runway works which require material from the proposed asphalt operation, all plant must be removed from site within three months of the date of the last operation of the plant, in accordance with this approval.

This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.

## Guidance Note

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/ dlge/planning/plan/applications/decision.xml

Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;

- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/85483-malew-old-turkeyland-quarry/documents/1556502*
