**Document:** Officer Planning Report 03/1421
**Application:** 03/01421/B — Installation of a replacement extraction unit and chimney to rear of Creel Chippy
**Decision:** Permitted
**Decision Date:** 2004-05-05
**Parish:** German
**Document Type:** report / officer_report
**Source:** https://planningportal.im/a/74436-german-16-michael-street-chimney-replacement/documents/1555685

---

# Officer Planning Report 03/1421

Michael charge - Condheus appropriate Review - re-examined condheus implicaties given that his recomm - of ETO - uncertain PL needs to be sure that condheus are necessary, relevant to PL, relevant to dev, ent, precise reasonable. Mr. Review no evidence that need for mitigation measures had been addressed in unreasonable to attach condheus along lines set out by ETO. Dischng unknown where applicant cald comply. - rare + oddol. Comments - opp to comment relive new evidence closing havno Reel Comms. Fang Lixian tang- Peel counts - Durcans Dive - no objections 04/1449 (Last). Conditions - At initial stage, committee was content to approve the application subject to 2 conditions relating to requirements to consult with - comply with advice of new H.&H. RE Review considers again implications of work - conditions + measured voiding against general regarded at the tests - against actual conditions. Q - Cropylovio: what is anticipated? would you accept conditions - Dry basis? Q - Explain mitigation measures (for noise + smell, prepared in consultation ELO)? Q - Discussed with Environmental Health Officer after initial Dose - could you comply with recommendations? Quota 11/45 as assessed to ensure that applicants are not unpunishedly bothered. Newly, conditions need to be necessary, relevant, relevant to the development, and/or the development of the product. The process of the development of the product is not to be repeated, but to be repeated. The process of the development of the product is to be repeated, to be repeated, and to be repeated. The process of the development of the product is to be repeated, to be repeated, and to be repeated. The process of the development of the product is to be repeated, to be repeated, and to be repeated. The process of the development of the product is to be repeated, to be repeated, and to be repeated. All details of the application - most applicable refuse - in real-granted in effect, desirable complete application - full + single constitution with 240. * Closing hours: It turned to applause precise, + reasonable actual condition. "The premises should be closed to customers after 11 pm each evening." * Evidence - suggest constitutions after the Burren-Moschatician recessing to comply with recommendations of 240. - Advance: probably confirmed - one signed "no appeal" - Recommend - level of proposed changes - should be signed to a revised application - open to working by all parties Peer Commits: 1. The site relates to 16 Michael Street, Peel, known locally as "Clear Chippy." 2. Proposed is a replacement extraction unit and chimney. 3. It is a large galvanized steel structure and appeals to be attached to number 18a Michael Street, without the owner's permission. 4. The chimney can be seen from the Post Office car pot and whilst it is wrightly, it would be greatly implored. It painted to match the colour of the building to which it is attached. 5. The residents at No. 18 and No. 18a Michael Street have raised concerns about smell and appearance given the proximity to new properties. 6. A site visit is required to assess the seriousness of those concerns. Signed Date 7. Environmental Health Advice should be sought.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/74436-german-16-michael-street-chimney-replacement/documents/1555685*
