**Document:** Planning Approval Decision Notice
**Application:** 08/01932/B — Demolition of existing buildings and creation of a golf maintenance facility including storage and staff areas
**Decision:** Permitted
**Decision Date:** 2008-12-22
**Parish:** Malew
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/86464-malew-swimming-pool-site-demolition/documents/1533454

---

# Planning Approval Decision Notice

## Isle of Man Town and Country Planning Act 1999

### The Town and Country Planning (Development Procedure) Order 2005

Ellis Brown
The Rechabite Hall
Allan Street
Douglas
IM1 3DW

In pursuance of powers granted under the above Act and Order the PLANNING COMMITTEE of the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Fort Island Ltd
**Proposal:** Demolition of existing buildings and creation of a golf maintenance facility including storage and staff areas
**at:** Swimming Pool Site
Golf Links Hotel
Fort Island
Castletown
Isle Of Man

which was considered on 18th December 2008, subject to compliance with the conditions specified below.

**Date of Issue:** 22nd December 2008

Murray House Mount Havelock Douglas

Deputy Secretary Planning Committee

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This permission relates to the creation of a golf maintenance facility as shown and described in drawings 8100/PL/100B, -101, -110A, -111A, 200A, -201 and -202 all received on 9th October, 2008.

3. Prior to the commencement of any works on site, including demolition and excavation, the site and area for working must be adequately fenced off so that the area of eelgrass, areas

of saltmarsh vegetation and the rock outcrop which supports lesser mottled grasshoppers is not incorporated in the working area and is, together with the adjacent Hango Broogh archaeological site, protected from damage during excavation, demolition and construction works by the storage of materials, moving of vehicles, water run-off. the applicant should consult DAFF's Wildlife and Conservation Division and Manx National Heritage in this respect prior to any fencing being erected.

This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.

---

### Guidance Note

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan/applications/decision.xml

Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/86464-malew-swimming-pool-site-demolition/documents/1533454*