**Document:** Drainage Division No Objection Letter
**Application:** 07/00582/B — Erection of a conservatory to rear elevation
**Decision:** Permitted
**Decision Date:** 2007-05-15
**Parish:** Santon
**Document Type:** consultation / highways_response
**Source:** https://planningportal.im/a/82609-santon-12-ballanoa-meadow-conservatory/documents/1492470

---

# Drainage Division No Objection Letter

## Isle of Man
### Government

The Secretary,
Planning Committee
Department of Local Government
and the Environment,
Murray House,
Douglas.

Contact: John Kneen
Our ref: PA07/582/B
Your ref: PA07/582/B

17 April 2007

Dear Sirs,

**PA 07/582/B – Erection of a conservatory to rear elevation, 12 Ballanoa Meadow, Santon.**

The Drainage Division of the Department of Transport has assessed the above planning application and would like to submit the following comments to your Planning Committee:-

**No Objection** in principle, subject to the following conditions:-

There must be NO discharge of surface water (including that from roofs and paved areas) from this proposed development to any foul drainage systems so as to comply with the requirements of the Department of Transport Drainage Division and the Sewerage Act 1999.

The application states that the surface water from the proposed development is to be discharged to the “existing drainage”. If this “existing drainage” discharges (directly or indirectly) to the foul sewerage system then it should be noted that an alternative means of surface water disposal must be provided.

In the event that this application is approved I should be grateful if these comments could be incorporated in the approval notice. Yours faithfully,

John Kneen
Development Control Technician.

c.c Agent/applicant

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/82609-santon-12-ballanoa-meadow-conservatory/documents/1492470*
