**Document:** Planning Approval Decision Notice
**Application:** 07/00306/B — Installation of roof lights and a solar panel
**Decision:** Permitted
**Decision Date:** 2007-04-11
**Parish:** Lezayre
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/82450-lezayre-summerland-installation-roof/documents/1490477

---

# Planning Approval Decision Notice

## Town and Country Planning Act 1999

### The Town and Country Planning (Development Procedure) Order 2005

Penketh - Millar
23 West Quay
Ramsey
Isle of Man
IM8 1DL

In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Mr P Whiteway
**Proposal:** Installation of roof lights and a solar panel
at:
5 Summerland
Ramsey
Isle of Man
IM8 2EF

which was considered on 2 April 2007, subject to compliance with the conditions specified below.

**Date of Issue:** 11th April, 2007
**Murray House Mount Havelock Douglas**
[Signature]
Secretary Planning Committee

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This approval relates to the submitted documents and drawings 06 0150/1, 06 0150/2 and 06 0150/3 all received on 16th February 2007.

This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan

Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.

The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;

Whichever is the later.

Applicant/Agent

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/82450-lezayre-summerland-installation-roof/documents/1490477*
