**Document:** Approval in Principle Notice
**Application:** 06/00561/A — Approval in principle for the erection of a dwelling with garage Extension of duration of consent agreed for 2 years on 24/04/08 by Senior Planner A further request for an extension of time was received on the 7th and 20th April 2010.
**Decision:** Permitted
**Decision Date:** 2006-07-14
**Parish:** Laxey
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/80368-lonan-land-to-rear-extension-new-build/documents/1465773

---

# Approval in Principle Notice

## Isle of Man Town and Country Planning Act 1999

### The Town and Country Planning (Development Procedure) Order 2005

Mr R G Jones
Olinda
South Cape
Laxey

In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Mr R G Jones
**Proposal:** Approval in principle for the erection of a dwelling with garage
at:
Land To Rear Of Olinda
South Cape
Laxey
Isle Of Man

which was considered on 7 July 2006, subject to compliance with the conditions specified below.

**Date of Issue:** 14 July, 2006
**Murray House Mount Havelock Douglas**
*(Signature: )*

**Secretary Planning Committee**

### Schedule Of Conditions:

1. This approval is in principle only and will remain valid for a period of two years within which time no development may take place until such time as details of the reserved matters (siting, design, external appearance, internal layout, means of access, landscaping) have been approved by the Planning Authority. Such reserved matters should form the subject of a single application.

2. This approval relates to the location plan date stamped the 30th March 2006.

3. The proposed development must be connected to the main foul sewer.

**NOTE:** A Drainage Connection Fee will be payable to the Drainage Authority on this development

4. There must be no discharge of surface water to the main foul sewer.

NOTE For single connections to a water main (i.e. a single dwelling) the applicant should contact Isle of Man Water Authority Customer Services, telephone 695949.

This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005

This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.

Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.

A form and guidance notes are available from either the Planning Office, Tel 685950, or to down load from the Department’s website www.gov.im/dlge/planning/plan

You should note that a copy of the Officer’s report which led to the decision being made, along with any correspondence relative to the application, is available for inspection at the Department.

No development July be undertaken until such time as the relevant reserved matters have been approved by the Planning Authority.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/80368-lonan-land-to-rear-extension-new-build/documents/1465773*