**Document:** Officer Planning Report Recommendation
**Application:** 05/92374/B — Construction of access ramps and steps to facilitate access for the disabled
**Decision:** Permitted
**Decision Date:** 2006-03-16
**Parish:** German
**Document Type:** report / officer_report
**Source:** https://planningportal.im/a/79907-german-peel-clothworkers-school/documents/1460745

---

# Officer Planning Report Recommendation

## Planning Report And Recommendations [Table omitted in markdown export] [Table omitted in markdown export] [Table omitted in markdown export] ### Considerations ### Written Representations ### Consultations ### Policy

### Officer's Report

The site represents the curtilage of Peel Clothworkers' School which sits on the eastern side of the main town of Peel and is within an area of Education on the Peel Local Plan approved by Tynwald in 1989.

Proposed here is the installation of disabled persons' access ramps around the building with some new doors with a level threshold for use by disabled persons. The ramps are in accordance with the relevant standards and are accompanied by galvanised railings for ease of use.

None of the ramps or railings causes an adverse visual impact and there are no adverse views on the file.

### Recommendation

## Conditions and Notes for Approval / Reasons and Notes for Refusal

C: Conditions for approval N: Notes attached to conditions R: Reasons for refusal O: Notes attached to refusals

C 1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

C 2. This permission relates to the installation of disabled persons' ramps and accesses, including new doors, all as shown in drawings reference D01, D02B, D03, D04, D05 and D06 all received on 15th December, 2006.

I confirm that this decision accords with Government Circular Nos 44/05 (Delegation of Functions to Director of Planning and Building Control) and 47/05 (Delegation of Functions to Senior Planning Officer)

Decision Made: Permitted Date: 14.3.06

Signed: M. I. McCauley Director of Planning and Building Control

Senior Planning Officer, in the absence of the Director on leave.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/79907-german-peel-clothworkers-school/documents/1460745*
