**Document:** Planning Approval Decision Notice
**Application:** 05/02078/B — Erection of a dwelling (Resubmission)
**Decision:** Permitted
**Decision Date:** 2005-12-29
**Parish:** Jurby
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/79490-jurby-plot-3-new-build-dwelling/documents/1456049

---

# Planning Approval Decision Notice

## Town and Country Planning Acts, 1934 - 1991

### Isle of Man Planning Scheme (Development Plan) Order 1982

Dave Luton Design
Old Engine House Studio
Agneash

In pursuance of powers granted under the above Acts and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Mr & Mrs D Hope
**Proposal:** Erection of a dwelling (Resubmission)
**at:** Plot 3
Land Adjacent To Bretney Estate
West Loughan
Jurby
Isle Of Man

which was considered on 16 December 2005, subject to compliance with the conditions specified below.

**Date of Issue:** 29 December, 2005
**Murray House Mount Havelock Douglas**

Secretary Planning Committee

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This permission relates to the erection of a dwellinghouse as shown in drawing number 05/427/3(C) date stamped 31st October 2005.

3. The development must be connected to the public foul sewer.

**NOTE:**
With regard to condition 3 relating to the connecting of the development to the public foul sewer the applicant is advised that the connection must be in a manner acceptable to the Department of Transport Drainage Division and on

terms and conditions, which must be agreed with the Drainage Division prior to the commencement of any building works. All drainage works must conform to the requirements of the Department of Transport's "Manx Sewers for Adoption" and all necessary inspections/surveys [including CCTV] are to be carried out at the developer's expense. It is also a legal requirement under the Sewerage Act 1999 that the Department (as the drainage Authority) be advised, in advance, of the date of the connection of the development to the public sewer. Communication Fees will be payable to the Department of Transport in respect of this drainage connection.

4. There must be no discharge of surface water to the main foul water.

5. Prior to the commencement of facing and roofing of the new dwelling the samples of the facing and roofing materials proposed to be used shall have been submitted to and approved in writing by the planning authority. Once approved the development shall be carried out in full accordance with the approved details or any approved amendments.

6. Prior to the commencement of works, full details of both hard and soft landscaping works shall have been submitted to and approved in writing by the planning authority and these works shall be carried out as approved. Details of hard landscaping works shall include boundary treatment, including full details of the boundary fencings to be erected, footpaths and hard surfacing materials. The hard landscaping works shall be completed in full accordance with the approved details within 3 months of the first occupation of the dwellinghouse hereby permitted and all planting shall be carried out in accordance with the approved details in the first planting and seeding seasons following that first occupation. Any trees or shrub which within a period of 5 years from the completion of the development dies, is removed or becomes seriously damaged or diseased shall be replaced in the next planting season with another of similar size and species, unless the planning authority gives written consent to any variation.

7. The dwellinghouse hereby permitted shall not be occupied until the car parking and manoeuvring areas have been provided in accordance with the approved plans, and those areas shall thereafter be kept available at all times for their respective purposes.

8. Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2005 (or any order revoking and re-enacting that Order with or without modification), no further development shall take place within the curtilage of dwellinghouse hereby permitted without the written approval of the planning authority.

NOTE For single connections to a water main (i.e. a single dwelling) the applicant should contact Isle of Man Water Authority Customer Services, telephone 695949.

This decision was made by the Director of Planning in accordance with powers delegated to him under Paragraph 2 (6) (b) of the Isle of Man Planning Scheme (Development Plan) Order 1982.

Note 1: This permission refers only to that required under the Town and Country Planning Acts and does not include any consent or approval under any other enactment, bylaw, order or regulation.

Note 2: No works may be commenced until such time as -
- the time for requesting a review of the initial decision has expired; or
- any review of the initial decision has been completed; or
- the time for requesting an appeal in relation to the decision has expired; or
- any appeal has been completed.

Note 3: Rights of the review of the decision are attached.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/79490-jurby-plot-3-new-build-dwelling/documents/1456049*
