**Document:** Officer Planning Report Recommendations
**Application:** 05/01045/B — Erection of a agricultural building
**Decision:** Permitted
**Decision Date:** 2005-07-28
**Parish:** Arbory
**Document Type:** report / officer_report
**Source:** https://planningportal.im/a/78815-arbory-ballakilpheric-farm-footpath-from-agricultural-building/documents/1448682

---

# Officer Planning Report Recommendations

## Planning Report And Recommendations [Table omitted in markdown export] ### Considerations [Table omitted in markdown export] ### Written Representations ### Consultations [Table omitted in markdown export] [Table omitted in markdown export] [Table omitted in markdown export] ### Policy

### Officer's Report

The site represents part of the farm complex associated with Ballakilpheric Farm, located opposite Cronk y Dooney on the western side of the road from Belle Abbey Farm to Lingague. The site is designated as suitable for the erection of a dwelling on the Arbory and East Rushen Local Plan adopted by Tynwald in 1999.

Proposed here is the erection of a new agricultural building alongside existing agricultural buildings, for use for the storage of potatoes. The new building will be 13.4m by 23m and 5.2m to the ridge, finished in metal sheeting. No indication of colour is given.

The site is well screened by the chapel and the hedging along the roadside. The existing buildings include timber slat finish. A dark green sheeted finish would be appropriate.

### Recommendation

Recommended Decision: Permitted

Date of Recommendation: 14.07.2005

### Conditions and Notes for Approval / Reasons and Notes for Refusal

C : Conditions for approval
N : Notes attached to conditions
R : Reasons for refusal
- : Notes attached to refusals

C 1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

C 2. This approval relates to the erection of an agricultural building as shown in drawing reference 2095-01 and the site plan both received on 2nd June, 2005.

C 3. The building must be finished in dark green coloured sheeting and dark grey for the roofing. Any amendment to this colour scheme must be approved by the Planning Authority.

C 4. The building must only be used for agricultural purposes.

C 5. There must be no discharge of surface water to the main foul sewer.

I confirm that this decision accords with Government Circular No 57/01 (Delegation of Functions to Director of Planning and Building Control).

Decision Made : Approval by delegation Date: 2/7/06

Signed:
M. I. McCauley
Director of Planning and Building Control

14 July 2005 05/01045/B Page 3 of 3

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/78815-arbory-ballakilpheric-farm-footpath-from-agricultural-building/documents/1448682*