**Document:** Planning Approval Decision Notice
**Application:** 05/00718/B — Erection of a detached timber stable block (Resubmission)
**Decision:** Permitted
**Decision Date:** 2005-06-08
**Parish:** Patrick
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/78289-patrick-croite-barrule-road-stable/documents/1441860

---

# Planning Approval Decision Notice

## Town and Country Planning Acts, 1934 - 1991

### Isle of Man Planning Scheme (Development Plan) Order 1982

Quay Design Ltd.
5 The Quay
Port St Mary
IM9 5EA

In pursuance of powers granted under the above Acts and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Mr S Dylan
**Proposal:** Erection of a detached timber stable block (Resubmission)
at:
The Croite
Barrule Road
Foxdale
Isle Of Man
IM4 3ES

which was considered on 3 June 2005, subject to compliance with the conditions specified below.

**Date of Issue:** 8th June, 2005
**Murray House Mount Havelock Douglas**
**Secretary Planning Committee**
*(Signature: Mr D. J. L. C. (C. J. L.))*

---

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This permission relates to the erection of stabling as shown in drawings 1057-13A and 1057-12A both received on 14th May, 2005.

3. The stabling may only be used for the keeping of horses and associated feed and equipment in association with the occupation of "The Croit", indicated in the approved plans.

4. There is a High Voltage Overhead electricity line running through this site. No part of the stable should be within 9m of this line in accordance with adopted

safety guidelines as set out in the 1982 Isle of Man Planning Scheme (Development Plan) Order.

NOTE The applicant may wish to consider utilising the material excavated in the development, to form banking or mounding immediately behind the longer of the two stables, to further screen the buildings from the road.

This decision was made by the Director of Planning in accordance with powers delegated to him under Paragraph 2 (6) (b) of the Isle of Man Planning Scheme (Development Plan) Order 1982.

Note 1: This permission refers only to that required under the Town and Country Planning Acts and does not include any consent or approval under any other enactment, bylaw, order or regulation.

Note 2: No works may be commenced until such time as -
- the time for requesting a review of the initial decision has expired; or
- any review of the initial decision has been completed; or
- the time for requesting an appeal in relation to the decision has expired; or
- any appeal has been completed.

Note 3: Rights of the review of the decision are attached.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/78289-patrick-croite-barrule-road-stable/documents/1441860*