**Document:** Planning Approval Notices Initial and Review
**Application:** 04/02074/B — Creation of a safe play area with fencing and storage shed
**Decision:** Permitted
**Decision Date:** 2005-06-27
**Parish:** Malew
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/77119-malew-arbory-school-outbuilding/documents/1428070

---

# Planning Approval Notices Initial and Review

## Town and Country Planning Acts, 1934 - 1991

### Isle of Man Planning Scheme (Development Plan) Order 1982

Department Of Education Works Division
Unit 15
Snugborough Trading Estate
Union Mills
Braddan
IM4 4LH

In pursuance of powers granted under the above Acts and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Department Of Education Works Division
**Proposal:** Creation of a safe play area with fencing and storage shed
at: Arbory School
Main Road
Ballabeg
Castletown
IM9 4LH

which was considered on 17 June 2005, subject to compliance with the conditions specified below.

**Date of Issue:** 27th June, 2005
**Murray House Mount Havelock Douglas**
**Secretary Planning Committee**
*(Signature)*

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. A proper spillway/outfall must be constructed at the stream; a detailed plan thereof must be submitted to and approved by the Planning Committee prior to the commencement of any works; this plan should be prepared in consultation with the Drainage Division of the Department of Transport.

3. Subject to condition (2) above, this approval relates to drawing number “Arbory/04” which is date-stamped 15th April 2005.
*(Signature)*

This decision was made by the Planning Committee constituted in accordance with Paragraph 2 of Schedule 1 of the Isle of Man Planning Scheme (Development Plan) Order 1982.

Note 1: This permission refers only to that required under the Town and Country Planning Acts and does not include any consent or approval under any other enactment, bylaw, order or regulation.

Note 2: No works may be commenced until such time as -
- the time for requesting a review of the initial decision has expired; or
- any review of the initial decision has been completed; or
- the time for requesting an appeal in relation to the decision has expired; or
- any appeal has been completed.

Note 3: Rights of the review of the decision are attached.

## Town and Country Planning Acts, 1934 - 1991

### Isle of Man Planning Scheme (Development Plan) Order 1982

Department Of Education Works Division
Unit 15
Snugborough Trading Estate
Union Mills
Braddan
IM4 4LH

In pursuance of powers granted under the above Acts and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Department Of Education Works Division
**Proposal:** Creation of a safe play area with fencing and storage shed
at: Arbory School
Main Road
Ballabeg
Castletown
IM9 4LH

which was considered on 2 September 2005, subject to compliance with the conditions specified below.

**Date of Issue:** 5th September, 2005
**Murray House Mount Havelock Douglas**
*Act Dep* 
Secretary Planning Committee

### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. A proper spillway/outfall must be constructed at the stream; a detailed plan thereof must be submitted to and approved by the Planning Committee prior to the commencement of any works; this plan should be prepared in consultation with the Drainage Division of the Department of Transport.

3. Subject to condition (2) above, this approval relates to drawing number “Arbory/04” which is date-stamped 15th April 2005.

This review has been considered by the Planning Committee on written evidence. Any additional submissions not previously circulated to interested parties are enclosed herewith.

---

Note 1: This permission refers only to that required under the Town and Country Planning Acts and does not include any consent or approval under any other enactment, bylaw, order or regulation.

Note 2: No works may be commenced until such time as -
- the time for requesting an appeal in relation to the decision has expired; or
- any appeal has been completed.

Note 3: Rights of the appeal against the decision of the planning committee are attached.

Note 4: An appeal must be requested within a period of 21 days.

---

*Data sourced from the Isle of Man public planning register under the [Isle of Man Open Government Licence](https://www.gov.im/about-this-site/open-government-licence/).*
*Canonical page: https://planningportal.im/a/77119-malew-arbory-school-outbuilding/documents/1428070*