**Document:** Planning Approval Decision Notice
**Application:** 04/01947/R — Part retrospective application for the change of use of previous bonded warehouse and unused warehouse areas to general warehousing, proposed use of external hardstanding for storage of pallets, gas bottles and kegs and erection of fencing
**Decision:** Permitted
**Decision Date:** 2004-12-03
**Parish:** Braddan
**Document Type:** decision / decision_notice
**Source:** https://planningportal.im/a/76826-braddan-distribution-centre-breweries-dwelling-change-of-use/documents/1423710

---

# Planning Approval Decision Notice

## Town and Country Planning Acts, 1934 - 1991

### Isle of Man Planning Scheme (Development Plan) Order 1982

EMC Design
Rear, 5 Inner Circle
Dougas
IM2 5BE

In pursuance of powers granted under the above Acts and Order the Department of Local Government and the Environment does hereby **APPROVE** the following application made on behalf of:

**Name:** Heron And Brearley
**Proposal:** Part retrospective application for the change of use of previous bonded warehouse and unused warehouse areas to general warehousing, proposed use of external hardstanding for storage of pallets, gas bottles and kegs and erection of fencing
**at:** Distribution Centre Isle Of Man Breweries
Kewaigue
Douglas
IM2 1QG

which was considered on 2 December 2004, subject to compliance with the conditions specified below.

**Date of Issue:** 3 December, 2004
**Murray House Mount Havelock Douglas**
*Secretary Planning Committee*
*(Signature: P. B. Brearley)*

---

#### Schedule Of Conditions:

1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.

2. This approval relates to the uses and layouts indicated in the letter dated 14th September 2004 from Messrs Heron and Brearley and on drawings numbered 2004/06/01-06 which are date-stamped 20th September 2004.

This decision was made by the Planning Committee constituted in accordance with Paragraph 2 of Schedule 1 of the Isle of Man Planning Scheme (Development Plan) Order 1982.

Note 1: This permission refers only to that required under the Town and Country Planning Acts and does not include any consent or approval under any other enactment, bylaw, order or regulation.

Note 2: No works may be commenced until such time as -
- the time for requesting a review of the initial decision has expired; or
- any review of the initial decision has been completed; or
- the time for requesting an appeal in relation to the decision has expired; or
- any appeal has been completed.

Note 3: Rights of the review of the decision are attached.

---